2.4 Repairs, Fitness and Access in England and Wales

Key Takeaways

  • For an English tenancy in scope, section 11 covers the structure, exterior and specified service installations. Section 9A separately requires fitness for human habitation.

  • For repairs inside an occupied English let, notice and a reasonable opportunity to repair normally matter. For common parts, check control, the landlord’s interest and the circumstances before deciding whether notice was needed.

  • For in-scope Welsh occupation contracts, sections 91 and 92 set local fitness and repair duties. Section 97 makes awareness and a reasonable time to repair relevant to the continuing duties.

  • For routine access, use the applicable notice and agreement. If entry is refused, reschedule or seek lawful authority. Use the emergency route only where the facts and applicable powers justify it.

  • Tenant-like care covers small household tasks and damage prevention. It leaves the landlord’s applicable statutory duties in place.

Last updated: November 2026

England’s repairing covenant

For an ordinary English residential letting in scope, section 11 of the Landlord and Tenant Act 1985 sets the landlord’s core repairing duties. The usual scope includes leases for less than seven years, subject to sections 13 and 14. Check the particular grant. Section 13 excludes some previously assured English grants originally made for seven years or more, includes some longer social tenancies and excludes Welsh occupation contracts. Section 11 does not require reinstatement after inevitable events such as fire or flood, maintenance of things the tenant is entitled to remove, or work for which the tenant is responsible under the tenant-like duty. A written tenancy term cannot simply shift statutory landlord repairs to the tenant. Section 12 sets a limited route for a County Court to authorise a modification by agreement. 1985 Act, sections 11–14

Section 11 obligationApply it to an ordinary letting
Structure and exterior, including drains, gutters and external pipesRepair a leaking roof or defective rainwater gutters.
Installations for water, gas, electricity and sanitationRepair fixed wiring, pipework and the washbasin. A freestanding washing machine is outside this statutory limb. Check the contract and any separate safety duties.
Installations for space heating and heating waterRestore a broken boiler, radiator or hot-water cylinder to proper working order.

For part of a building, section 11 can also cover relevant parts in which the landlord has an estate or interest and installations serving the dwelling that meet the statutory interest, ownership or control tests. The defect must affect the tenant’s enjoyment of the dwelling or common parts the tenant can use. Where necessary work requires rights the landlord lacks, a defence can apply if the landlord used all reasonable endeavours to obtain them without success. Check the headlease and report defects to the party who can carry out the work. Section 11

Notice matters. For a defect in an area let to and occupied by the tenant, the landlord normally needs notice and a reasonable time to put it right. A report to a managing agent authorised to receive and act on repair reports counts in the usual case. Once the authorised agent has received the report, a later failure to forward it does not reset the response period. The urgency, loss of essential services and risks to occupants affect the reasonable response time. Notice is normally unnecessary for disrepair of parts that are within the landlord’s possession and repairing covenant. For common parts controlled by a third party, consider the facts and the lease. In Edwards v Kumarasamy, the Supreme Court explained why the notice rule could apply to an assumed duty over an area outside both parties’ possession. Supreme Court judgment, paragraphs 29–58

Section 11 concerns repair and proper working order. A defect arising purely from the design may be outside that duty if nothing has deteriorated or stopped working. Check whether it nevertheless makes the home unfit. For example, distinguish a leaking roof from a persistent hazard caused by inadequate ventilation even though the original equipment still works. Court of Appeal, Quick v Taff-Ely

Fitness is a separate test

In England, sections 9A, 9B and 10 of the 1985 Act govern fitness for in-scope tenancies. Section 9A requires fitness when the lease is granted or, if later, when the term begins, and throughout the term. For a flat, relevant common parts in which the landlord has an estate or interest are included. Section 10 asks whether the dwelling is reasonably suitable for occupation in its condition, taking account of matters such as damp, stability, ventilation, sanitation and prescribed hazards. A serious hazard can make the dwelling unfit without a broken item. Check the statutory limits, including when the tenant’s breach wholly or mainly caused the unfitness or consent needed from a third party could not be obtained despite reasonable efforts. Sections 9A–10 and government fitness guidance

In Wales, sections 91 and 92 of the Renting Homes (Wales) Act 2016 apply to secure contracts, periodic standard contracts and fixed-term standard contracts made for less than seven years. The landlord must provide a fit dwelling on the occupation date and during the contract, and keep structure, exterior and service installations in repair. The fitness regulations set Welsh hazards and prescribed safety requirements. Some failures, such as not providing the required electrical condition report, cause the dwelling to be treated as unfit for the duration of the breach. Under section 97 the continuing fitness and repair duties normally depend on the landlord becoming aware that work is needed, followed by a reasonable time to do it. The occupation-date fitness duty is distinct. Sections 95 and 96 set limits, including some damage or unfitness mainly due to lack of care by the contract-holder or a permitted occupier. Welsh Act, Part 4 Chapter 2 and Welsh Government fitness guidance

Access and remedies

Quiet enjoyment protects against substantial interference by the landlord or those acting on their behalf. The English section 11(6) inspection covenant covers viewing the condition and state of repair at a reasonable time on 24 hours’ written notice. An agent or contractor using that provision needs written authority. For a Welsh occupation contract in scope, section 98 allows inspection and relevant works at a reasonable time after at least 24 hours’ notice. For example, if the tenant refuses access on the day of a routine inspection, record the reason, offer another appointment and apply for access through the court if necessary. Statutory notice for an inspection does not authorise forced entry on these facts. An imminent emergency calls for the relevant emergency arrangements and lawful access for those circumstances. For an ordinary Welsh contract incorporating the emergency access term under regulation 16, the contract-holder must give immediate access when required in an emergency. If access is not immediately provided, the term permits entry and requires all reasonable efforts to notify the contract-holder as soon as reasonably practicable afterward. English inspection covenant, Welsh access provision, Welsh emergency access term and Southwark LBC v Mills

In either jurisdiction, record the defect, when it was reported, access attempts, diagnostics and work done. An occupier can raise an unresolved hazard with the local authority. Under the Housing Act 2004 the authority must take appropriate action on a Category 1 hazard and can take action on a Category 2 hazard. Separately, a tenant may seek a court order for works and compensation for an applicable breach. In Wales an occupation contract normally contains a supplementary term under which rent is not payable for a day or part-day of unfitness. Check the actual term under the applicable contract and regulations. If unfitness is disputed, a court can decide, and withheld sums can be at risk if the home was fit. This is distinct from the English court remedy for breach of section 9A. Housing Act 2004, sections 5 and 7, Welsh supplementary rent term, Welsh Government guidance for contract-holders and English Homes Act guidance

Tenant-like care

Warren v Keen explains the ordinary occupier’s responsibility for small everyday tasks, such as routine cleaning and safely replacing a light bulb. Report a faulty fixed fitting or persistent damp promptly. For an ordinary Welsh contract, check the supplementary terms on care of the dwelling, fair wear and tear and notification of repairs for which the landlord is responsible. An agent should check the cause before attributing disrepair to the occupier. Keep evidence of damage and reasonable loss where a landlord seeks recovery for an occupier’s breach. The landlord’s own obligations and any immediate risk still need to be dealt with. Warren v Keen judgment and Welsh supplementary provisions

Test Your Knowledge

An English assured periodic tenant reports a leaking radiator valve inside the home by email to the managing agent authorised to handle repairs. Three weeks pass before the agent tells the landlord. When should the agent treat the repair report as received for the section 11 response?

A

Only on the day the landlord personally receives the forwarded email.

B

At the end of the tenancy when the check-out inventory records the leak.

C

When the authorised agent receives the report, allowing a reasonable time for the necessary work in light of the urgency.

D

When the valve first began leaking, even if neither the landlord nor the agent knew.

Test Your Knowledge

Which item falls outside the section 11 repairing covenant for an English residential tenancy in scope? Assume there is no additional contractual repair duty.

A

A freestanding washing machine supplied in the kitchen.

B

External rainwater gutters and downpipes.

C

A fixed central heating boiler and its radiators.

D

A bathroom washbasin and its sanitary pipework.

Test Your Knowledge

A managing agent authorised in writing gives 48 hours’ written notice of a routine inspection of the state of repair, for 10 a.m. on a weekday in an English tenancy in scope. The tenant expressly refuses access that week. There is no emergency. What should the agent do?

A

Use the spare keys once 24 hours have elapsed.

B

Get a locksmith because an inspection clause overrides the refusal.

C

Deduct an aborted-visit fee from the deposit as an automatic statutory charge.

D

Record the refusal, seek another appointment by agreement and obtain lawful authority if compulsory access is needed.

Sections you finish are checked off in the contents.