1.9 EPCs, Minimum Energy Standards, Legionella and Asbestos
Key Takeaways
In England and Wales, commission a required EPC before marketing if no valid one exists. The 7-day period and possible 21-day extension are for obtaining it. Use the rating in commercial advertisements when a valid EPC exists.
The current minimum for in-scope domestic private rentals is Band E unless a valid exemption has been registered. The usual self-funding cap is £3,500 including VAT. Exemption conditions and durations vary.
The government plans a higher standard for in-scope homes by 1 October 2030, subject to legislation. The announced £10,000 cap and transitional treatment for eligible EPCs are separate from current rules.
Assess and control Legionella risk proportionately, review the assessment when the system or its use changes and tell tenants about controls they need to maintain.
The duty to manage asbestos covers communal areas of residential blocks. Check the register and survey coverage before anyone disturbs potentially affected material.
Energy Performance Certificates
A domestic Energy Performance Certificate (EPC) rates energy efficiency from A to G and usually includes recommendations. Search the official register for a certificate for the exact dwelling. An EPC can be used for up to ten years from its entry on the register, provided a subsequent EPC for the building has not been lodged. If a certificate is required and none is valid, the landlord must commission one from an accredited assessor before the property goes on the market. The agent must be satisfied it was commissioned. Both must make all reasonable efforts to obtain it within seven days, counting the first marketing day as day one. If those efforts fail, the law allows a further 21 days to obtain it, making 28 days in total. Once a valid EPC exists, show its rating in commercial advertisements. EPC regulations and government EPC guidance
Make the EPC available free to a prospective tenant at the earliest opportunity, by the first written information provided in response to a request or by a requested viewing, whichever event comes first. Give the incoming tenant a free copy. Check the unit being marketed. Letting a bedroom with shared facilities does not generally trigger a separate EPC for that room. A flat designed or altered for separate use can have its own EPC, and letting the whole building can trigger a certificate for the whole building. A protected historic building is excluded only insofar as compliance would unacceptably alter its character or appearance. A detached building with less than 50 m² of useful floor area and a temporary building used for no more than two years are other examples of exclusions. Government EPC guidance
Minimum Energy Efficiency Standards (MEES)
For domestic property in scope in England and Wales, the current minimum is Band E. This applied to new lettings from 1 April 2018 and to continuing in-scope lettings from 1 April 2020. Check both the occupation arrangement and whether the property is legally required to have an EPC. For an F- or G-rated property in scope, use the recommendations to identify relevant measures that will bring it up to E or to confirm the evidence for a valid exemption. Register the exemption on the PRS Exemptions Register before relying on it. The standard self-funding cap is £3,500 including VAT. Where a home can reach E for £2,600, the landlord can meet the standard for £2,600. If third-party finance covers the entire cost of reaching E, the cap does not limit that funded work. Domestic MEES penalties can total up to £5,000 per property under the current regime. Government MEES guidance
| Exemption | Evidence and duration |
|---|---|
| All relevant improvements made | The dwelling remains below E after all relevant improvements within the cap, or there are no relevant improvements. Record the measures and installation dates. Five years. |
| High cost | The cheapest recommended measure exceeds £3,500 including VAT. Supply three quotes from qualified installers and written confirmation of the cost. Five years. |
| Wall insulation | Relevant measures are limited to wall insulation and qualified written advice shows the insulation would harm the fabric or structure. Five years. |
| Third-party consent | Show that required consent could not be obtained despite reasonable efforts, or came with conditions that could not reasonably be met. Five years, with earlier expiry if a refusal by the tenant is the basis of the exemption and that tenancy ends or is assigned. |
| Devaluation | An independent RICS-registered valuer reports a reduction in market value of more than 5%. Five years. |
| Recent purchase with an existing tenant | An eligible buyer who purchases an interest in an already-let property can register an exemption to continue the existing letting for up to six months from becoming the landlord. |
For example, an estimated £9,000 loss on a £180,000 property is exactly 5%. It falls short of the devaluation threshold. A landlord who buys a qualifying tenanted home at Band F can use the six-month exemption if properly registered. By expiry, the home must meet the current minimum or have another valid registered exemption for the letting to continue. MEES rules on new landlords and government MEES guidance
The government's published plan is for in-scope new and existing lettings to meet a higher standard by 1 October 2030, subject to legislation. It plans a C-grade fabric standard plus a C grade for either heating systems or smart readiness. The announced cap is £10,000 per property, with a lower cap of 10% of the property's value for homes worth below £100,000. At £80,000, that would be £8,000. Under the plan, an eligible EPC showing C or above on the existing Energy Efficiency Rating before 1 October 2029 can demonstrate compliance until that certificate expires or is replaced. For a question about current obligations, use the Band E rules. Government response on the proposed standards
Legionella in hot and cold water systems
Assess the water-system risk and put proportionate controls in place. The Control of Substances Hazardous to Health Regulations 2002 provide the framework for this risk assessment and control. A regularly used dwelling with mains-fed cold water and an instantaneous combi boiler will often be low risk. A long vacancy, stored water or rarely used outlets can change the assessment. Before reletting after a vacancy, review the system and any controls needed, such as flushing outlets and checking that a cold-water tank is covered. Tell tenants about controls they need to maintain and the problems they should report. HSE guidance calls for periodic review and review when conditions change. It sets no universal deadline for annual testing, requires no Legionella test certificate and distinguishes good record-keeping practice from the duty on employers with five or more employees to record significant findings. HSE guidance for landlords
Asbestos in residential common parts
Regulation 4 of the Control of Asbestos Regulations 2012 covers shared parts of residential blocks, such as communal staircases, lift shafts and service risers. Identify who has the repair or maintenance obligations or, where those obligations are absent, control of the area. The dutyholder must identify materials that contain or could contain asbestos, presume asbestos unless there is strong evidence otherwise, keep a current register and management plan, and provide relevant information to people who may disturb the material. A management survey supports ordinary occupation. Check its scope before arranging intrusive work. If a riser ceiling was excluded and the work could disturb concealed material, defer the work while a competent surveyor assesses the affected area. Give the contractor the relevant findings before work begins. Regulation 4 does not impose a domestic register for the inside of an individual flat. Contractors still need to assess the risk of asbestos disturbance in their own work there. Regulation 4, HSE dutyholder guidance and HSE asbestos survey guidance
A buyer purchases an in-scope English rental rated F with a tenant already occupying under an existing tenancy. Which route lets the buyer continue that tenancy temporarily under current MEES rules?
Rely on the sitting tenant to give an automatic exemption for five years.
Register the exemption for an eligible buyer to continue the existing tenancy for up to six months after becoming the landlord.
Treat a commitment to spend £10,000 by 2030 as permission to continue letting now.
Treat the sale as restarting the property’s EPC at Band E until the next assessment.
A regularly occupied house has a mains-fed cold-water supply and a combi boiler. It will stand empty for several months between tenancies. What is the appropriate Legionella response?
Buy an annual test certificate and use it in place of a water-system risk assessment.
Rely on the combi boiler and skip the assessment because the home has no hot-water cylinder.
Reassess the risk from the period of disuse, take proportionate steps before reletting and explain any ongoing controls to the incoming tenant.
Carry forward the previous assessment without review because no plumbing work was done.
A block manager plans drilling in the shared stairwell of a 1972 block. The register shows that the survey excluded the ceiling void where the contractor will drill. What should the manager do?
Hold the work, arrange a suitable asbestos survey of the affected area and share the findings with the contractor before work proceeds.
Allow drilling after giving the contractor the existing register, because it lists no confirmed asbestos in the ceiling void.
Ask the flat occupiers for consent and let the contractor rely on the date of the original survey.
Allow exploratory drilling and arrange a survey if the contractor sees suspect material.