9.1 Electrical Safety on Construction Sites: Temporary Supply, RCDs, Competent Persons and Safe Isolation

Key Takeaways

  • CDM 2024 regulation 27(1) requires energy distribution installations on a construction site to be suitably located, checked regularly and clearly marked where necessary to prevent danger.

  • Regulation 36(3) of the Electricity Regulations 1994 requires final circuits in installations where hand-held equipment is used to be protected by a residual current device rated at no more than 30 mA.

  • Regulation 36 of the Electricity Regulations 1994 sets RCD ratings of no more than 10 mA for wet locations such as bathrooms and no more than 100 mA for other installations not covered by the 10 mA and 30 mA rules.

  • Under the Electricity Regulations 1994, electrical installation work is done and supervised by competent persons holding Energy Commission certificates of competency, such as wiremen and chargemen.

  • An electrical short circuit or overload with fire or explosion that stops plant for more than 24 hours and could cause serious injury is a NADOPOD dangerous occurrence.

Last updated: October 2026

How electricity harms

EffectMechanismConstruction example
Electric shockCurrent through the body disturbs heart rhythm and causes muscle spasm; can cause ventricular fibrillation and deathDamaged extension lead on a wet slab; drilling into a live cable
BurnsHeating where current enters and leaves; arc flashArc from a fault in a distribution board; contact with overhead lines
Secondary injuriesA shock causes a fall from height or a ladderWorker on a ladder jolted by a faulty drill
Fire and explosionOverloaded or damaged cables, poor connections, sparks in flammable atmospheresOverloaded multi-adaptor in a site cabin; grinder sparks near solvent

Risk rises with wet conditions (Malaysian rain, concrete work, dewatering), damaged insulation, steel structures and confined conductive spaces, and long cable runs across traffic routes.

The law

  • OSHA 1994 section 15(2)(a): safe plant and systems of work.
  • CDM 2024 regulation 27:
    • (1) energy distribution installations must be suitably located, checked regularly and clearly marked where necessary to prevent danger
    • (2) and (3) overhead power cables must be diverted, isolated and earthed, or protected with warning notices, barriers and suspended protection
    • (4) no work that could create risk from underground services unless suitable measures are taken
    • most breaches carry up to RM500,000 or one year or both
  • Electricity Supply Act 1990 (Act 447) and Electricity Regulations 1994, administered by the Energy Commission (Suruhanjaya Tenaga):
    • electrical work must be done by persons holding the appropriate certificate of competency: wireman, chargeman, electrical supervisor, competent electrical engineer or cable jointer
    • installations must be done by registered electrical contractors
    • installations must be tested and certified before connection to supply
  • Regulation 36 of the Electricity Regulations 1994, protection against earth leakage by residual current devices (RCDs):
SituationMaximum rated residual operating current
Wet locations such as bathrooms, and where the body's resistance is likely to be low (36(2))10 mA
Final circuits in installations where hand-held equipment, apparatus or appliances are used or likely to be used (36(3))30 mA
Other installations (36(4))100 mA

On construction sites, hand tools are everywhere, so every final circuit feeding socket outlets for portable tools needs 30 mA RCD protection. The international standard for construction-site installations, IEC 60364-7-704, takes the same approach.

Temporary site distribution

A typical arrangement runs from the utility supply or a generator to a main board, then sub-distribution boards, then socket-outlet boards near the work.

What the SSS inspects

ItemGood condition
BoardsWeatherproof enclosure; lockable; doors closed; labelled with circuits and a warning sign; no exposed live parts; stable stand off the ground; access kept clear
ProtectionRCDs fitted as Regulation 36 requires and tested using the test button, for example weekly, and periodically by a competent person with an instrument; correctly rated breakers; earthing in place
CablesCorrect type for site use; not damaged, joined with tape or repaired with insulation tape; routed overhead or buried and protected; ramps where vehicles cross; kept out of water
Plugs and socketsIndustrial-type connectors; no bare wires pushed into sockets; no multi-adaptor chains
GeneratorsLocated outdoors away from excavations, basements and openings (fumes); earthed as designed; fuel stored safely; refuelled only when stopped
LightingTemporary lighting guarded and secure; stair and access lighting maintained (CDM regulation 37)

Only competent persons (Energy Commission certificates) may install, alter or repair the installation. Workers must never "borrow" power by opening boards.

Portable tools and equipment

  • Inspect before use: user checks for damaged casings, cables and plugs. Withdraw defective tools at once and tag them "DO NOT USE".
  • Inspect and test periodically: by a competent person, with a site tag or register showing the next due date.
  • Choose safer supplies: battery tools or reduced-voltage systems (such as 110 V centre-tapped earth transformers) where practicable, especially in wet or confined areas. Double-insulated tools reduce shock risk.
  • Never use domestic extension reels on site, and never use tools with missing earth pins.

Working near cables

  • Overhead lines: CDM regulation 27 and Section 3.1. Check the line owner's safe distance, set goalposts and barriers at crossings, and plan crane, pump and tipper positions so they cannot reach the line.
  • Underground cables: use drawings, cable locator scans and hand-dug trial holes (Section 6.4). DOSH's excavation bulletin also says workers using hand tools where the exact cable location is unknown should wear insulated gloves and footwear.

Safe isolation and work on electrical systems

Work on or near electrical equipment should be done dead wherever possible:

  1. Identify the circuit and equipment from drawings and labels.
  2. Isolate at the correct point. Switching off a final circuit breaker is not enough if other supplies feed the equipment.
  3. Lock off with a personal lock and tag each isolation point. Use an electrical permit for complex systems.
  4. Prove dead with an approved voltage indicator, which is itself checked on a known live source before and after use.
  5. Earth where required, for example on high-voltage systems, by an authorised person.
  6. Re-energise only after all workers are clear, all locks removed by their owners, and the work checked.

Live work should be avoided. Where it is unavoidable, it must be done only by competent persons following a specific procedure, with insulated tools, PPE and a second person present.

Responding to electric shock

  1. Do not touch the casualty until the supply is switched off or the casualty is separated using non-conductive means. For high-voltage lines, keep well clear and call the line owner.
  2. Call for help (999) and start CPR if the casualty is not breathing normally. Use an automated external defibrillator (AED) if one is available.
  3. Treat burns, and send every shock casualty for medical assessment, because internal injuries and heart rhythm problems can be delayed.
  4. Report and investigate. A shock causing serious injury, or an electrical fire with a long plant stoppage (NADOPOD Second Schedule item 3), may need notification to DOSH.

Scenario: the wet basement

During rain, workers in a flooded basement are using a pump and a grinder plugged into a board with its door off, through a taped joint lying in water. The RCD test record has not been updated for two months. The SSS:

  1. Stops work, clears the area and has the board isolated by the site chargeman.
  2. Has the damaged cable replaced, the joint removed, and the cable routed off the floor on hooks.
  3. Has the RCDs tested and shown to trip within their rated current, confirms the 30 mA protection on the tool circuits as Regulation 36(3) requires, and refits the board door with a lock.
  4. Swaps the grinder for a battery tool. The pump supply is reviewed by the electrical engineer.
  5. Adds weekly RCD test-button checks to the site inspection checklist.
Test Your Knowledge

Under regulation 36(3) of the Electricity Regulations 1994, what is the maximum rated residual operating current of the RCD protecting final circuits where hand-held power tools are used?

A

100 mA

B

300 mA

C

30 mA

D

500 mA

Test Your Knowledge

Which CDM 2024 regulation requires temporary distribution boards on a construction site to be suitably located, checked regularly and clearly marked?

A

Regulation 22

B

Regulation 27

C

Regulation 32

D

Regulation 39

Test Your Knowledge

A worker collapses after touching a damaged cable that is still live. What should the first person on the scene do first?

A

Pull the worker away from the cable by the arm immediately

B

Throw water over the worker to cool any burns quickly

C

Start CPR at once while the worker still touches the cable

D

Isolate the supply or separate them with non-conductive material

Sections you finish are checked off in the contents.