2.1 OSH Management Systems: Planning, OSH Policy, Site Organisation & Safety Committees
Key Takeaways
Section 16 of OSHA 1994 requires a written OSH policy covering the general policy, the organisation and the arrangements for carrying it out; the 1995 exception regulations exempt undertakings with not more than five employees.
Under section 30 of OSHA 1994 a safety and health committee is required where 40 or more persons are employed at the place of work, or where the DOSH Director General directs.
A committee at a workplace with more than 100 employees needs at least four worker representatives and four management representatives under regulation 5 of the SHC Regulations 1996.
The safety and health committee must meet at least once every three months and inspect the workplace at least once every three months under regulations 21 and 12 of the SHC Regulations 1996.
The employer must keep committee minutes at the workplace for at least seven years under regulation 27 of the SHC Regulations 1996.
From ad hoc safety to a management system
A construction site changes every week, so safety cannot depend on one inspector noticing problems. An occupational safety and health management system (OSHMS) is a structured way of planning, doing, checking and improving safety. The NIOSH curriculum lists ISO 45001 among its references. Malaysia's national standard is MS 1722 (OSHMS requirements), and the ILO's Guidelines on OSH Management Systems (ILO-OSH 2001) set out the same idea for government and industry.
Plan-Do-Check-Act in ISO 45001
| PDCA stage | ISO 45001 clause | What it looks like on a Malaysian site |
|---|---|---|
| Plan | 4 Context; 5 Leadership and worker participation; 6 Planning | Legal register (OSHA 1994, CDM 2024, NADOPOD, USECHH, Noise 2019); HIRARC; objectives; construction phase plan |
| Do | 7 Support; 8 Operation | Competence and induction; communication; safe work procedures; permits; contractor control; emergency preparedness |
| Check | 9 Performance evaluation | Inspections; monitoring; incident investigation; internal audit; management review |
| Act | 10 Improvement | Corrective action; lessons learned; updating the plan and HIRARC |
Two legal links make OSHMS more than paperwork:
- Section 18A(3)(b) of OSHA 1994 requires principals to allocate sufficient time, budget and other resources for construction work.
- CDM 2024 regulation 4 requires the client to provide adequate time, funds and other resources. Regulations 13 and 15 require the principal contractor to plan, manage and monitor the construction phase through a construction phase plan.
Part 3(A): OSHMS planning
Planning for a construction project typically produces:
- A legal and other requirements register. This lists the Act and regulations that apply, the relevant ICOPs (for example confined space), DOSH guidelines, client requirements, and other laws such as the Environmental Quality Act 1974 and local authority by-laws. Remove repealed instruments such as BOWEC 1986.
- A baseline HIRARC for each work activity, reviewed as the project moves through its phases (Section 2.3).
- Measurable objectives, for example 100% induction before site entry, weekly scaffold inspection completion, or monthly closure of audit findings. Use leading indicators as well as lagging ones such as lost-time injuries.
- Resources: budget lines for edge protection, scaffolding, PPE, welfare, first aid, training and supervision.
- Arrangements for Fourth Schedule work (for example excavation, explosives, work near high-voltage lines), which must appear in the construction phase plan.
Part 3(B): the OSH policy
The legal requirement
Section 16 requires every employer to prepare, and revise as often as appropriate, a written statement of:
- its general policy on the safety and health at work of its employees, and
- the organisation and arrangements for carrying out that policy.
The employer must bring the statement, and any revision, to the notice of all employees. The Employers' Safety and Health General Policy Statements (Exception) Regulations 1995 apply section 16 to every employer and self-employed person except those carrying on an undertaking with not more than five employees. A breach of section 16 carries the section 19 penalty of up to RM500,000 or two years or both.
The three elements
| Element | Answers | Contents on a construction project |
|---|---|---|
| General statement of intent | What do we commit to? | Commitment to prevent injury and ill health, comply with the law, consult workers and keep improving. Signed and dated by top management |
| Organisation | Who is responsible for what? | Responsibilities of the director, project manager, SHO (if appointed), SSS, engineers, foremen, subcontractors and workers. Chain of reporting |
| Arrangements | How will it be done? | HIRARC, safe work procedures, permits, inspection, training, welfare, first aid, emergency plans, incident reporting, contractor control, monitoring and audit |
Good practice, and the reason examiners award marks, is to:
- sign and date the policy at the highest level
- display it at the site office and induction area
- explain it during induction in languages the workforce understands
- review it after reorganisations, serious incidents or major changes in the work
Part 3(C): OSH management and site organisation
Typical responsibility chain
Client ── appoints ──> Principal designer Principal contractor
│
Project director / project manager (resources, authority)
│
┌──────────────────────┬────────────────────┴───────────────┐
SHO (if the SHO Order Site Safety Supervisor Engineers, supervisors,
applies: system, (CDM reg. 39: daily foremen, subcontractors
committee secretary) inspection & correction) (control the work)
│
Workers (OSHA s.24 duties; s.26A right)
Key points for exam answers:
- Line managers own safety. The project manager and supervisors control the work, so they control most of the risk. The SSS advises, inspects and stops unsafe work, but does not replace line responsibility.
- SSS and SHO. On projects covered by the SHO Order 1997 (building operations or engineering construction above RM20 million) an SHO is also employed. The SHO prepares a monthly report to the employer (SHO Regulations 1997 regulation 19) and is secretary of the committee.
- OSH coordinator. An employer not covered by section 29 that has five or more employees must appoint an OSH coordinator (section 29A). Small subcontractors often fall in this group.
- Safety and health assistants. Under CDM regulation 38, any duty holder may appoint people to help it comply, provided they are competent and are given enough time and means.
- Worker engagement. CDM regulation 16 requires the principal contractor to consult workers and give them access to relevant safety information.
The safety and health committee
When it is required
Under section 30 a committee is required where there are 40 or more persons employed at the place of work, or where the Director General directs. The committee's job (section 31) is to keep safety measures under review, investigate matters workers raise, and try to resolve them. If it cannot, it asks DOSH to inspect. Failing to establish a committee carries up to RM100,000 or one year or both.
Composition (SHC Regulations 1996)
| Rule | Regulation | Requirement |
|---|---|---|
| Members | 5(1) | A chairman, a secretary, employer representatives and worker representatives |
| Size, up to 100 employees | 5(2) | At least 2 worker and 2 management representatives |
| Size, more than 100 employees | 5(2) | At least 4 worker and 4 management representatives |
| Chairman | 6(1) | The employer or his authorised manager |
| Secretary | 6(2), 6(3) | The SHO; if there is no SHO, the chairman appoints someone or the members elect one by secret ballot |
| Worker representatives | 7 | Nominated by the workers, with a ballot if there are more nominees than places; the employer appoints only if there are too few |
Meetings, inspections and records
| Duty | Regulation | Requirement |
|---|---|---|
| Ordinary meetings | 21(1) | As often as the risks require, and at least once every three months |
| Immediate meetings | 21(3) | After an accident causing death or serious injury, a near miss, a dangerous occurrence or any situation needing urgent attention |
| Workplace inspection | 12 | At least once every three months; findings and recommendations recorded in a report |
| Investigations | 13 | Inspect after accidents, near misses, dangerous occurrences, poisoning or disease; the SHO's findings go to the chairman |
| Quorum | 24 | The chairman, the secretary and at least half of the remaining members |
| Minutes | 27 | Given to members and the employer within two weeks; kept at the workplace for at least seven years |
| Training | 28–29 | The employer gives members adequate OSH training |
Many construction committees meet monthly because hazards change quickly. That is good practice; the legal minimum is quarterly.
Scenario: setting up the committee
A principal contractor has 140 workers on site, including subcontractors' workers, and no SHO, because the contract value is RM14 million.
- A committee is required, because more than 40 persons are employed.
- It needs at least four management and four worker representatives, because the workplace has more than 100 employees.
- The project manager chairs as the authorised manager. With no SHO on the project, the chairman appoints a secretary, often the SSS, or the members elect one by secret ballot.
- The first quarterly inspection is diarised, and the SSS's daily findings feed into the agenda. Minutes are circulated within two weeks and filed for seven years.
A subcontractor employs four workers on a project. Which statement about its duty under section 16 of OSHA 1994 to prepare a written OSH policy is correct?
It must prepare a policy because every construction employer is covered
It is exempt, because its undertaking has no more than five employees
It must prepare a policy only if the project's contract value exceeds RM20 million
It is exempt only if the principal contractor's policy names it
A construction site has 160 employees and an appointed SHO. Under the SHC Regulations 1996, who is the committee secretary and what is the minimum representation?
The SSS is secretary, with two worker and two management representatives
The project manager is secretary, with three worker and three management representatives
The SHO is secretary, with at least four worker and four management representatives
A DOSH officer is secretary, with one worker and one management representative
How long must an employer keep the minutes of safety and health committee meetings under the SHC Regulations 1996?
Until the end of the construction project
For at least three years
For at least five years
For at least seven years