Licensing And Grades
Not publishedof exam
Law, Inspection, Records
Not publishedof exam
Safety Valves And Controls
Not publishedof exam
Operation And Water
Not publishedof exam
Quick Facts
- Administrator
- MA Department of Fire Services
- Program
- Boiler and Pressure Vessel
- Format
- Written plus oral exam
- Grades
- Two fireman, three engineer
- Application fee
- $100 or $150 by grade
- Renewal
- $90, five-year term
- Continuing education
- 30 hours, 6 special
- Retake limit
- Once per 60 days
- Question count
- Not published by DFS
- Pass mark
- Not published by DFS
- Exam site
- DFS Stow campus
- Governing law
- M.G.L. c.146 and 522 CMR
Fee Ladder
Firemen 100, third 100, top engineers 150
Fireman vs Engineer
Fireman
- Boilers only
- Charge capped at 25 psi
- Two grades issued
Engineer
- Boilers and engines
- Three grades issued
- Top grade is unlimited
Fireman charge caps at 25 psi
Which License Grade
- Operate under supervision only→2nd Class Fireman(Entry grade)
- Charge boilers at 25 psi→1st Class Fireman(Safety valve setting)
- Solid fuel, 150 hp→3rd Class Engineer(Aggregate limit)
- Oil or gas, 500 hp→3rd Class Engineer(Aggregate limit)
- Engines up to 150 hp→2nd Class Engineer(No boiler cap)
- Any plant, no limit→1st Class Engineer(Highest grade)
- One named plant only→Special license(Owner request needed)
- Plant over 250 hp→Regular engineer grade(Special license capped)
License Grades And Scope
- 2nd Class Fireman
- Operate under direct charge
- 1st Class Fireman
- Charge boilers to 25 psi
- 3rd Class Engineer
- 150 hp solid fuel
- 3rd Class, other fuels
- 500 hp aggregate limit
- 2nd Class Engineer
- Engines up to 150 hp
- 1st Class Engineer
- Any steam plant, unlimited
- Special license
- One named plant only
- No 4th Class
- That grade does not exist
Third vs Second Class Engineer
3rd Class Engineer
- 150 hp solid fuel
- 500 hp other fuels
- Engines 50 hp each
2nd Class Engineer
- No boiler horsepower cap
- Engines up to 150 hp
- Operates first class plants
Engine size sets the grade
Grade Privileges Ladder
- 2nd Fireman limit
- Never has charge
- 1st Fireman may operate
- 3rd class plant, supervised
- 3rd Engineer may operate
- 2nd class plant, supervised
- 2nd Engineer may operate
- 1st class plant, supervised
- 3rd Engineer engines
- 50 hp each maximum
- 1st Engineer scope
- No horsepower limit
- Two plants, one engineer
- Only within one mile
- Alternative to one mile
- Licensed attendant on site
Special To Operate vs Charge
Special to Operate
- Operates one named plant
- Cannot have charge
- $100, oral exam
Special to Have Charge
- Has charge of it
- Owner designates you
- $100, oral exam
Both cover one plant only
Experience Routes By Grade
- 2nd Class Fireman
- Evidence of previous training
- 1st Class Fireman
- One year plant employment
- 1st Fireman shortcut
- Six months 2nd Fireman
- 3rd Class Engineer
- 1.5 years plant employment
- 3rd Engineer shortcut
- One year 1st Fireman
- 2nd Class Engineer
- Two years, 50 hp engine
- 2nd Engineer shortcut
- One year 3rd Engineer
- 1st Class Engineer
- Three years, engine over 150 hp
- 1st Engineer shortcut
- 1.5 years 2nd Engineer
- Merchant Marine time
- Equivalent license time counts
- Out-of-state license
- Equivalent time counts too
Application Facts
- Fireman, engineer form
- BPV-010 for all grades
- Special license form
- BPV-012 special engineer licenses
- Engineer in Charge form
- BPV-021 notification
- Accommodations form
- BPV-018 with application
- Minimum age
- 18 years old
- Citizenship
- Engineer grades; declaration accepted
- Endorsement
- Same or higher grade
- Endorsement exempt
- 2nd Fireman and special
- False endorsement
- Endorser loses own license
- Photo
- Passport photo or RMV
- Mail to
- DFS Stow, Massachusetts 01775
Fees And Renewal
- 1st, 2nd Class Fireman
- $100 each application
- 3rd Class Engineer
- $100 application fee
- 1st, 2nd Class Engineer
- $150 each application
- Special license
- $100 new application
- Renewal, every grade
- $90 flat
- License term
- Five years
- Continuing education
- 30 hours per term
- Special license education
- 6 hours per term
- Renewal exam
- None required
- Renewal packet mailed
- 60 days before expiry
- Return renewal by
- 30 days before expiry
Exam Logistics
- Exam format
- Written plus oral required
- Special license format
- Oral examination only
- Special exam location
- At your work site
- Regular exam venue
- DFS Stow campus
- Exam frequency
- Roughly monthly, published schedule
- Application deadline
- About one month prior
- Attempts per application
- One examination only
- Reapply limit
- Once every 60 days
- Appeal window
- Within one week
- Appeal board
- Three inspectors, decision final
- Question count
- Not published by DFS
- Time limit
- Not published by DFS
- Pass mark
- Not published by DFS
Attendance Tier Breaks
250 periodic, 500 noncontinuous, above that continuous
Power vs Heating Boiler
High Pressure/Power
- Steam above 15 psig
- Water above 160 psig
- Water above 250 degrees
Low Pressure/Heating
- Steam 15 psig or less
- Water 160 psig or less
- Water 250 degrees or less
15 psig steam is the line
Attendance Requirement Picker
- Plant under nine hp→No license needed(Section 46 exemption)
- 9 to 250 hp→Periodic attendance(Stay in building)
- 251 to 500 hp→Noncontinuous attendance(Remote monitoring)
- 501 hp or more→Continuous attendance(Manned always)
- Boiler in private residence→No license needed(Section 46 exemption)
- Apartment under five units→No license needed(Section 46 exemption)
- Second plant within mile→Same engineer allowed(Or licensed attendant)
Attendance Tiers
- 9 to 250 hp
- Periodic attendance
- 251 to 500 hp
- Noncontinuous attendance
- 501 hp or more
- Continuous attendance
- Periodic means
- Same building, daily maintenance
- Noncontinuous adds
- Remote monitoring station required
- Noncontinuous checks
- Four to six per shift
- Continuous means
- Manned during all operation
- Under 9 hp
- No licensed operator required
Pressure Boundary Numbers
15 steam, 160 water, 250 degrees
Repair vs Alteration
Repair
- Restores safe operation
- Form R-1 filed
- Routine repair option exists
Alteration
- Changes pressure-containing capability
- Form R-2 filed
- MAWP increase counts
Changing MAWP is an alteration
Repair Or Alteration Path
- Restores safe condition→Repair, Form R-1(NBIC Part 3)
- Raises the MAWP→Alteration, Form R-2(Nonphysical change counts)
- Welded pressure work→R Certificate Holder(Accredited organization)
- Mechanical piping repair→Engineer in Charge supervises(File in seven days)
- Boiler judged unsafe→Certificate removed(No operation allowed)
Licensing Exemptions, Section 46
- Private residences
- Exempt from licensed operator
- Small apartment houses
- Fewer than five units
- Under nine horsepower
- Boilers and engines exempt
- 15 psi limiter
- Marshal-approved device exempts
- Agricultural use
- Horticultural, floricultural also exempt
- Locomotives, motor vehicles
- Named in the exemption
- Turbine test stands
- Qualified testing personnel only
- Federal jurisdiction
- United States units exempt
- Unlicensed engine operator
- 150 hp, manufacturing, supervised
- Unlicensed helper
- One per licensed person
DFS vs Board Of Boiler Rules
Department of Fire Services
- Issues licenses, certificates
- Employs district inspectors
- Runs written, oral exams
Board of Boiler Rules
- Writes 522 CMR
- Adopts national codes
- Hears variance requests
Board writes, DFS enforces
Inspection And Certificate Rules
- Power boiler inspection
- Annual, internal and external
- External inspection window
- Within six months after
- First inspection
- District Engineering Inspector only
- Later inspections
- Inspector or Authorized Inservice
- Air tank interval
- Every two years
- Air tank pressure trigger
- Design MAWP over 50 psi
- Air tank size trigger
- Over six inches diameter
- Air tank volume trigger
- Over one cubic foot
- Certificate posting
- Conspicuous, near the boiler
- Certificate protection
- Shield from dirt, moisture
- Unsafe boiler
- Inspector removes the certificate
- Inspection extension
- Six months maximum
- Mass Tag
- Inspector-only removal
Records And Reporting Duties
- Record retention
- Seven years at boiler
- Engineer's Record Book
- Engineer in Charge signs daily
- Operator's Log Book
- Signed each shift assumed
- Log review
- Engineer in Charge, daily
- Plant visits
- Daily unless Chief approves
- Appointment notice
- Division within seven days
- Leaving a position
- Division within seven days
- Designation letter
- Signed by the owner
- Accident reporting
- MEMA within 24 hours
- Repair form
- R-1 report of repair
- Alteration form
- R-2 report of alteration
- Who may weld
- Accredited R Certificate Holder
- Piping repair report
- Filed within seven days
522 CMR Definitions
- High Pressure/Power Boiler
- Steam above 15 psig
- Also high pressure
- Hot water above 160 psig
- Temperature trigger
- Hot water above 250 degrees
- Low Pressure/Heating Boiler
- At or below all three
- Massachusetts Heat Boiler
- Section IV, unstamped steel
- Repair
- Restores safe operating condition
- Alteration
- Changes pressure-containing capability
- Deaerator
- Heat Storage Source vessel
- Temporary Use Boiler
- Portable, one year maximum
- Ton of refrigeration
- 12,000 Btu per hour
- Engineer in Charge
- Owner-designated operating authority
- Authorized Inservice Inspector
- Insurance company boiler inspector
Adopted Codes And Editions
- ASME boiler code
- 2021 edition adopted
- Section I
- Power boiler construction
- Section IV
- Heating boiler construction
- Section VIII
- Pressure vessel construction
- Section IX
- Welding and brazing qualification
- NBIC edition
- 2021, Parts 1 through 4
- CSD-1 edition
- ASME CSD-1-2021
- Power piping
- ASME B31.1-2020
- NFPA 85 edition
- 2019 edition adopted
Flame Safeguard Timers
Four to trip, fifteen to light, five to close
Safety Valve vs Safety Relief
Safety valve
- Steam and vapor service
- Rapid pop action
Safety relief valve
- Vapor or liquid service
- Used on water boilers
Pop action versus dual service
Safety Device Response
- Level left the glass→Secure fuel immediately(Never feed water)
- Safety valve leaking→Qualified valve repair(Never gag it)
- Valve lifts early→Offline for recalibration(Certified shop)
- Cutoff fails its test→Lock out the boiler(Repair before service)
- Flame signal lost→Fuel valve closes(4 seconds maximum)
- Flame never established→Safety shutdown(15 seconds maximum)
- Reportable accident occurs→Call MEMA(Within 24 hours)
Safety Valve Rules
- Minimum valves
- At least one required
- Two valves required
- Over 500 sq ft
- What surface counts
- Bare tube water-heating surface
- Electric boiler threshold
- Input over 1,100 kW
- Overpressure limit
- 6% above highest setting
- Second overpressure cap
- 6% above MAWP
- Relieving capacity basis
- ASME Code determines minimum
- Manual test
- Lift lever on start-up
- Leaking valve
- Never gag or plug
- Premature lifting
- Offline, recalibrate at shop
Controls And Water Level
- Two gauge glasses
- MAWP above 400 psi
- Remote level indicators
- May replace one glass
- Low-water cutoff
- Cuts fuel on low water
- Cutoff test
- Daily, lower level slowly
- Cutoff test failure
- Lock out, repair first
- Flame safeguard
- Proves flame, closes fuel
- Flame failure response
- 4 seconds maximum
- Flame-establishing period
- 15 seconds maximum
- Valve closing time
- 5 seconds after de-energization
- Operating control
- Cycles burner normally
- High-limit control
- Shuts down on failure
- Fusible plug
- Melts to warn overheating
Prohibited Massachusetts Control Setups
- Very low pressure
- Below 10% normal prohibited
- Dual pressure controls
- Prohibited above 15 psig
- Bypass switches
- Need dead-man capability
- Fail-closed bypass
- Never permitted
- Remote monitoring minimum
- Steam pressure and level
- Remote shutdown
- Switch must be included
- Monitoring signals
- Uninterruptible, visible alarms required
Emergency Response
- Water out of sight
- Secure fuel, shut down
- Never do this
- Feed an overheated boiler
- Furnace explosion cause
- Unburned fuel, bad purge
- Tube failure
- Trip fuel, clear area
- Emergency shutdown
- Fuel off, isolate steam
- Purge, multiple burner
- 25% full-load mass airflow
- Single burner purge
- Four firetube, eight watertube
- Single burner purge rate
- 70% of maximum airflow
Horsepower Divisors
34.5 steam, 41,840 input, 33,475 output
Horsepower Formulas
- First source
- Manufacturer's nameplate horsepower
- Steam output route
- Pounds per hour / 34.5
- Btu input route
- Btu per hour / 41,840
- Btu output route
- Btu per hour / 33,475
- Missing nameplate
- Notarized manufacturer letter accepted
- Simple engine
- 40 psi mean effective
- Condensing engine
- 50 psi mean effective
- Compound engine
- 70 psi mean effective
- Turbine pipe to 1.75 in
- Rated under nine horsepower
- Turbine pipe to 3.5 in
- Rated 50 horsepower
- Turbine pipe to 5 in
- Rated 150 horsepower
Daily Log Duties
Blow, blow, blow, test, lift, lube, light, clean
Water Treatment Targets
- Boiler water pH
- About 10.5-11.5 typical
- Oxygen scavenger
- Sodium sulfite after deaerator
- Why after deaerator
- Trace oxygen still pits
- Sulfite residual test
- Confirms scavenger still present
- Surface blowdown
- Removes dissolved solids
- Bottom blowdown
- Removes sludge, settled solids
- Conductivity test
- Estimates dissolved solids level
- Softener
- Ion exchange removes hardness
- Chelant program
- Keeps metals soluble, unprecipitated
- Scale danger
- Insulates, overheats, ruptures tubes
- Carryover causes
- High level, high solids
- Caustic embrittlement
- Cracking at stressed joints
- Condensate carbon dioxide
- Forms carbonic acid, corrodes
Daily Checklist, Section 46A
- Who performs it
- Operator, boilers over nine hp
- Bottom blowdown
- Measured, per treatment supplier
- Surface blowdown
- Remove water-surface accumulations
- Water column
- Blow down the column
- Cutoff and regulator
- Test both every day
- Safety valves
- Operate manually on start-up
- Lubrication
- Check auxiliary equipment lubrication
- Ignition
- Verify proper ignition, start-up
- Housekeeping
- Keep the boiler room clean
Combustion Basics
- Three T's
- Time, temperature, turbulence
- Excess air purpose
- Prevents carbon monoxide, soot
- Too much air
- Dry flue gas loss
- No. 6 fuel oil
- Heavy, must be preheated
- No. 2 fuel oil
- Light, no preheat needed
- Draft
- Moves air and gases
- Water hammer
- Condensing steam slugs pipes
- Foaming
- High solids, oil, alkalinity
Lay-up And Maintenance
- Dry lay-up
- Drain, dry, add desiccant
- Wet lay-up
- Fill treated, hold high pH
- Skipping lay-up
- Invites oxygen pitting
- Confined space entry
- Permit, test, attendant, rescue
- Lockout/tagout
- Isolate fuel, power, steam
- Old gaskets, insulation
- Assume asbestos, test first
- Nameplate data
- MAWP, surface, code stamp
Common Traps
Fourth Class Engineer
Massachusetts issues three engineer grades ≠ No 4th Class exists
DPS is not DFS
Department of Fire Services ≠ Not Department of Public Safety
Exam fee is not $50
$100 fireman and third engineer ≠ $150 first and second engineer
Renewal fee is flat
$90 for every grade ≠ Not scaled by license class
Question count is unpublished
DFS publishes no item count ≠ Written plus oral is confirmed
Reciprocity is not transfer
No direct license conversion ≠ Outside time counts as experience
Special license is limited
Valid at one named plant ≠ Capped at 250 hp aggregate
Fireman is not low-pressure only
First Class caps at 25 psi ≠ May operate high-pressure supervised
Third Class entry route
1.5 years plant experience ≠ Two-year route is Second Class
Air tanks are not annual
Air tanks every two years ≠ Power boilers every year
Special exam is oral only
Special license: oral exam ≠ Fireman, engineer: written plus oral
Last Minute
- 1.Five grades: there is no 4th
- 2.1st Fireman charge = 25 psi
- 3.3rd Engineer = 150 solid, 500 other
- 4.Fees $100 or $150; renewal $90
- 5.Attendance breaks at 250, 500 hp
- 6.Power boiler = steam over 15 psig
- 7.Boiler hp = lb/hr / 34.5
- 8.Boilers annual; air tanks biennial
- 9.Records kept seven years onsite
- 10.Accident: notify MEMA in 24 hours
- 11.Reapply once per 60 days
- 12.Renewal needs 30 education hours
- 13.Special license needs 6 hours
- 14.Low water: secure fuel first
- 15.Flame failure trip: 4 seconds
- 16.Endorsement needed except 2nd Fireman