MD Boiler Operator Cheat Sheet

Maryland Law: Editorial Revision Group

Not publishedof exam

Grade Horsepower ThresholdsAttendance & Monitoring RulesExam, Renewal & Inspection LawLargest Single Unit Rule

Boilers, Valves & Safety Controls

Not publishedof exam

Boiler Types & ASME CodesSafety Valves & Gauge GlassLow-Water Cutoff & ControlsPumps & Steam Header Valves

Burners, Combustion & Emergencies

Not publishedof exam

Combustion, Draft & PurgeFlame Safeguard SequenceSequential & Emergency OperationsLow-Water vs Tube Rupture

Water Treatment & Blowdown

Not publishedof exam

Scale, Sludge & CarryoverDeaeration & Chemical TreatmentBottom vs Surface BlowdownZeolite Softener Limits

Auxiliaries, Chillers & Electricity

Not publishedof exam

Condensers, NPSH & PumpsChillers & Refrigeration CycleBasic DC & AC ElectricityMotor Overload Protection

Quick Facts

Licensing Board
Maryland Board of Stationary Engineers
Exam Delivery
PSI; qualification approval before scheduling
Scored Outline Count
G5–G4: 60; G3–G1: 80
Possible Additional Items
5–10 experimental, unscored; extra time
Answering Time
120 minutes for scored examination
Passing Score
70%: 42/60 or 56/80
Book Policy
G5–G4 approved open-book; G3–G1 closed-book
Licence Term
Normally two years; statutory stagger exception
Revision Filters
Five editorial groups; official outlines separate

Maryland 5-Grade Horsepower Ladder

30-99 G5/G4, 100-299 G3, 300-499 G2, 500+ G1

G5: 30-99 HP non-publicG4: 30-99 HP any buildingG3: 100-299; G2: 300-499; G1: 500+

Grades 5–4 vs Grades 3–1 PSI Exams

Grades 5 & 4

  • 60 scored-outline items; 120 minutes
  • Open book (approved references)
  • Need 42 correct (70%)

Grades 3, 2 & 1

  • 80 scored-outline items; 120 minutes
  • Closed book examination
  • Need 56 correct (70%)

60 open-book vs 80 closed-book

Maryland License Grade Picker

  1. Statutory heating-boiler definition applies→Stationary-service licensing definition excludes heating boilers(Inspection obligations are a separate question)
  2. Hot-water statutory heating definition→Pressure ≤160 psig OR temperature ≤250°F(Statutory OR; distinct from ASME shorthand)
  3. 30-99 HP in non-public building→Grade 5 Stationary Engineer
  4. 30-99 HP in public building→Grade 4 Stationary Engineer
  5. Largest single unit 100-299 HP→Grade 3 Stationary Engineer
  6. Largest single unit 300-499 HP→Grade 2; 500+ HP Grade 1

Grade Horsepower & Trigger Rules

License Trigger
Over 15 psi AND 30+ HP
30 HP Equivalent
About 1,003,000 Btu per hour
1 Boiler HP
Evaporates 34.5 lb/h from-and-at 212°F≈33,475 Btu/h thermal output
Grade 5 Scope
30-99 HP, non-public building
Grade 4 Scope
30-99 HP, any building
Grade 3 Scope
100-299 HP largest single unit
Grade 2 Scope
300-499 HP largest single unit
Grade 1 Scope
500 HP or more; statutory conditions

2-Year Power Boiler Inspection Extension

Board may extend certificate interval; conditions must all qualify

Power boiler; Board-approved extension onlyContinuous internal treatment; experienced PE supervisesOutage date, time and reason recordsWater analyses: ≤48 operating-hour intervalsAnnual external inspection remains separate

COMAR 09.17 Alarm vs Shutdown Picker

  1. High stack flue gas temperature→Sound alarm AND shut burner
  2. Steam high-pressure or low/high-water condition→Specified monitoring alarm and automatic shutdown
  3. Low steam pressure or burner off→Alarm required; shutdown follows applicable safeguards(Not shutdown triggers under section .07)
  4. Boiler shuts down automatically→Licensee/designee physically inspects before restart(Qualifying system shutdown under section .07)

Attendance: Qualified Monitoring Exceptions

G5, No Qualified Monitoring
Visit every 24 operating hours minimum
G4 Public, No Monitoring
Attend continuously; special school rule applies
G4 School, No Monitoring
School hours; other hours ≥150 occupants
G5, Qualified Monitoring
Weekly visit; 24-hour availability; daily log
G4–G1 Monitored Public
Visit every eight open hours minimum
G3–G1 Monitored Non-Public
Scheduled visits not required; duties remain
Qualifying Monitoring
24-hour computerized monitoring plus automatic controls
300 HP or More
Monitor, indicate AND record specified points
Qualifying Shutdown Manual Reset
Licensee/designee physically inspects before restart
Monitored School G4 Exception
School-hours/≥150-occupant condition still applies
All Monitored Attendance Exceptions
Responsibility, 24-hour availability, daily log remain

Exam, Renewal & Inspection Law

G5-G4 Pass Mark
42 of 60 items correct70%
G3-G1 Pass Mark
56 of 80 items correct70%
Board FAQ: Reapply After Failure
First 30 days; subsequent requests 60
PSI Registration Validity
90 days; fee nonrefundable, nontransferable
Score Validity
Apply for license within 2 years
Expired > 24 Months
Non-renewable; must retest
Covered Power Boiler Inspections
Annual inspections; approved certificate extension possible
Accident Notice
Notify Chief Inspector within 24h
Unauthorized Material During Examination
Reject application; reexamination barred ≥1 year

PSI Outline Counts: Part 1

General knowledge and problem solving
G5–4: 20; G3: 10; G2–1: 5
Basic electricity
G5–4: 5; G3: 5; G2–1: 5
Boiler types and equipment
G5–4: 5; G3: 10; G2–1: 5
Burners and fuel train
G5–4: 5; G3: 10; G2–1: 10
Pumps and valves
G5–4: 5; G3: 10; G2–1: 10
Sequential operations
G5–4: 0; G3: 10; G2–1: 10

PSI Outline Counts: Part 2

Inspections and maintenance
G5–4: 5; G3: 5; G2–1: 10
Central station and chillers
G5–4: 0; G3: 5; G2–1: 5
Water treatment
G5–4: 5; G3: 5; G2–1: 10
Emergency operations
G5–4: 5; G3: 5; G2–1: 5
Auxiliary equipment
G5–4: 5; G3: 5; G2–1: 5

Firetube vs Watertube Boilers

Firetube Boiler

  • Hot gases pass inside tubes
  • Large water volume, slower response
  • Often lower duty; design ratings govern

Watertube Boiler

  • Water circulates inside the tubes
  • Often faster response; design-dependent
  • Handles high pressures and loads

Gas in tubes vs water

Boiler Types, ASME & Fittings

ASME Section I
Power-boiler construction; steam above 15 psig
ASME Section IV
Heating-boiler construction; applicable limits and edition
ASME Section VIII
Pressure-vessel construction; scope and exclusions apply
MAWP and Valve Settings
At least one valve ≤MAWPPower boiler, COMAR .24G
Safety Valve Rule
Direct connection; no shutoff valve
Try-Lever Test
Movement check, not set-pressure calibration
Water Column
Dampens surges; test per approved procedure
Non-Return Valve
Prevents backflow when boiler pressure drops
Existing Power Boiler Additional Valves
Settings ≤103% MAWP; full conditions apply

Operating Control vs High-Limit Control

Operating Control

  • Cycles or modulates burner daily
  • Holds normal operating pressure
  • Normal cycling follows control design

High-Limit Control

  • Independent protective limit on unsafe conditions
  • Setting coordinated with approved relief protection
  • Reset mode follows applicable code/design

Normal cycling vs safety lockout

Three Ts of Complete Combustion

Temperature, Turbulence, and Time with right oxygen

Temperature: ignite fuelTurbulence: mix air-fuelTime: burn before tubes

Low-Water Emergency vs Tube Rupture

Low-Water Condition

  • Secure heat input under emergency procedure
  • Dry/overheated boiler: no water addition
  • Inspect and obtain authorized restart clearance

Tube Rupture

  • Secure heat input under emergency procedure
  • Feedwater decision depends on boiler condition
  • Isolation follows equipment-specific approved procedure

Overheating risk vs rupture-specific response

Boiler Emergency Action Picker

  1. Low water; dry/overheated boiler suspected→Secure heat input; no water addition(Approved shutdown and inspection before restart)
  2. Boiler tube ruptures on line→Approved emergency shutdown; keep personnel clear(Condition/equipment determine feedwater and isolation)
  3. Safety valve lifts repeatedly→Prevent overpressure; investigate controls through procedure(Never gag or obstruct relief)
  4. Burner trips on flame failure→Investigate cause; approved purge before restart(No repeated blind resets)
  5. Boiler accident or explosion occurs→Notify Chief Inspector within 24h

Burners, Draft & Flame Safeguard

3 Ts of Combustion
Temperature, turbulence, and time
Complete Hydrocarbon Combustion
CO₂ and water; other products possible
Incomplete Sign
Carbon monoxide, smoke, or soot
Forced Draft
Fan pushes air toward combustion chamber
Induced Draft
Fan draws combustion gases toward stack
Balanced Draft
Both fans; controlled furnace pressure
Pre-Purge / Post-Purge
Prescribed airflow clears accumulated combustibles
Flame Scanner
Flame-safeguard system trips fuel upon failure

Bottom Blowdown vs Surface Blowdown

Bottom Blowdown

  • Drawn from lowest mud drum
  • Short, intermittent valve operation
  • Removes settled sludge solids

Surface Blowdown

  • Skims just below water line
  • Metered continuous or intermittent design
  • Controls total dissolved solids (TDS)

Settled sludge vs surface TDS

Water Problems: Treatment-Plan Decisions

  1. TDS exceeds approved treatment-plan limit→Adjust blowdown under the approved plan(No universal valve opening or flow)
  2. Sludge settles in mud drum→Approved intermittent bottom-blowdown procedure
  3. Calcium and magnesium hardness present→Verify softener and approved treatment plan
  4. Dissolved oxygen causing tube pitting→Check deaeration and prescribed scavenger treatment(Qualified treatment specialist sets chemical dose)

Water Treatment & Blowdown

Scale
Hard deposits; hardness often contributes
Sludge
Loose settled suspended solids
Dissolved Oxygen
Causes localized tube metal pitting
Deaerator
Heats and vents non-condensable gases
Oxygen Scavenger
Chemically removes residual dissolved O2
Zeolite Softener
Swaps Ca/Mg ions for sodium
Bottom Blowdown
Short intermittent removal of sludge
Surface Blowdown
TDS control; continuous or intermittent design

Four-Step Refrigeration Cycle Order

Compressor, Condenser, Expansion device, Evaporator in loop

Compressor: raises P and TCondenser: rejects heatExpansion drops P; Evaporator cools

Centrifugal vs Positive Displacement Pump

Centrifugal Pump

  • Uses rotating impeller velocity
  • Flow drops as pressure rises
  • Closed discharge can overheat; follow manufacturer

Positive Displacement

  • Moves fixed volume per stroke
  • Builds destructive pressure if blocked
  • Protect blocked discharge with approved relief

Variable flow vs fixed displacement

Auxiliaries, Pumps & Chillers

Elevated Deaerator
Provides NPSH to feed pump
Cavitation
Vapor bubbles form, then collapse
Surface Condenser
Condenses exhaust; supports turbine vacuum
Economizer
Preheats feedwater using flue gas
Compressor
Raises refrigerant pressure and temperature
Condenser (Chiller)
Rejects heat, liquefies refrigerant
Expansion Device
Throttles pressure; refrigerant partly flashes
Evaporator
Absorbs heat from building load

Basic Electricity & Motor Controls

Ohm's Law
Volts equal amps times ohmsE = I × R
DC Electric Power
Watts equal volts times ampsP = E × I; DC
Series Circuit
Same current; voltages add up
Parallel Circuit
Same voltage; branch currents add
Motor Overload
Protects windings from sustained overcurrent
Fuses / Breakers
Protect against short-circuit faults
Lockout / Tagout
Isolate, lock, control stored energy, verify
AC Real Power
Single-phase: V × I × power-factor

Common Traps

Single-Unit Capacity vs Plant Capacity

Licence grade: largest individual regulated unit ≠ Plant total: not the grade calculation

Engineer Licensing vs Equipment Inspection

Title 6.5: engineer grades and attendance ≠ Title 12-9: equipment inspection and certificates

Routine Feedwater vs Overheated Dry Boiler

Normal operation: maintain approved water level ≠ Overheated dry boiler: no water addition

Gauge Indication vs Verified Water Level

Motionless glass: potentially obstructed, not proof ≠ Approved verification: investigate uncertain water level

Softening vs Deaeration

Softener: exchanges calcium and magnesium ions ≠ Deaerator: heats and removes dissolved gases

Ordinary Reciprocity vs Military Recognition

Ordinary route: no out-of-state reciprocity ≠ Qualified military relocation: separate recognition provisions

Last Minute

  1. 1.Trigger: >15 psi AND ≥30 HP
  2. 2.Heating boilers: excluded from licensing definition
  3. 3.Grade: largest single regulated unit
  4. 4.Pass: 70% (42/60; 56/80)
  5. 5.G5–4: approved open-book; G3–1: closed-book
  6. 6.Reapplication: first 30 days; subsequent 60
  7. 7.Power certificate extension: Board-approved, not automatic
  8. 8.Required certification: display licence with photograph
  9. 9.Identification: valid government-issued photo ID available
  10. 10.Boiler accident notice: within 24 hours
  11. 11.Safety relief: no intervening shutoff valve
  12. 12.Dry/overheated boiler: no water addition
  13. 13.Steam admission: equipment-specific approved pressure sequence
  14. 14.Qualifying manual reset: physical inspection first