Maryland Law: Editorial Revision Group
Not publishedof exam
Boilers, Valves & Safety Controls
Not publishedof exam
Burners, Combustion & Emergencies
Not publishedof exam
Water Treatment & Blowdown
Not publishedof exam
Auxiliaries, Chillers & Electricity
Not publishedof exam
Quick Facts
- Licensing Board
- Maryland Board of Stationary Engineers
- Exam Delivery
- PSI; qualification approval before scheduling
- Scored Outline Count
- G5–G4: 60; G3–G1: 80
- Possible Additional Items
- 5–10 experimental, unscored; extra time
- Answering Time
- 120 minutes for scored examination
- Passing Score
- 70%: 42/60 or 56/80
- Book Policy
- G5–G4 approved open-book; G3–G1 closed-book
- Licence Term
- Normally two years; statutory stagger exception
- Revision Filters
- Five editorial groups; official outlines separate
Maryland 5-Grade Horsepower Ladder
30-99 G5/G4, 100-299 G3, 300-499 G2, 500+ G1
Grades 5–4 vs Grades 3–1 PSI Exams
Grades 5 & 4
- 60 scored-outline items; 120 minutes
- Open book (approved references)
- Need 42 correct (70%)
Grades 3, 2 & 1
- 80 scored-outline items; 120 minutes
- Closed book examination
- Need 56 correct (70%)
60 open-book vs 80 closed-book
Maryland License Grade Picker
- Statutory heating-boiler definition applies→Stationary-service licensing definition excludes heating boilers(Inspection obligations are a separate question)
- Hot-water statutory heating definition→Pressure ≤160 psig OR temperature ≤250°F(Statutory OR; distinct from ASME shorthand)
- 30-99 HP in non-public building→Grade 5 Stationary Engineer
- 30-99 HP in public building→Grade 4 Stationary Engineer
- Largest single unit 100-299 HP→Grade 3 Stationary Engineer
- Largest single unit 300-499 HP→Grade 2; 500+ HP Grade 1
2-Year Power Boiler Inspection Extension
Board may extend certificate interval; conditions must all qualify
COMAR 09.17 Alarm vs Shutdown Picker
- High stack flue gas temperature→Sound alarm AND shut burner
- Steam high-pressure or low/high-water condition→Specified monitoring alarm and automatic shutdown
- Low steam pressure or burner off→Alarm required; shutdown follows applicable safeguards(Not shutdown triggers under section .07)
- Boiler shuts down automatically→Licensee/designee physically inspects before restart(Qualifying system shutdown under section .07)
Attendance: Qualified Monitoring Exceptions
- G5, No Qualified Monitoring
- Visit every 24 operating hours minimum
- G4 Public, No Monitoring
- Attend continuously; special school rule applies
- G4 School, No Monitoring
- School hours; other hours ≥150 occupants
- G5, Qualified Monitoring
- Weekly visit; 24-hour availability; daily log
- G4–G1 Monitored Public
- Visit every eight open hours minimum
- G3–G1 Monitored Non-Public
- Scheduled visits not required; duties remain
- Qualifying Monitoring
- 24-hour computerized monitoring plus automatic controls
- 300 HP or More
- Monitor, indicate AND record specified points
- Qualifying Shutdown Manual Reset
- Licensee/designee physically inspects before restart
- Monitored School G4 Exception
- School-hours/≥150-occupant condition still applies
- All Monitored Attendance Exceptions
- Responsibility, 24-hour availability, daily log remain
Exam, Renewal & Inspection Law
- G5-G4 Pass Mark
- 42 of 60 items correct70%
- G3-G1 Pass Mark
- 56 of 80 items correct70%
- Board FAQ: Reapply After Failure
- First 30 days; subsequent requests 60
- PSI Registration Validity
- 90 days; fee nonrefundable, nontransferable
- Score Validity
- Apply for license within 2 years
- Expired > 24 Months
- Non-renewable; must retest
- Covered Power Boiler Inspections
- Annual inspections; approved certificate extension possible
- Accident Notice
- Notify Chief Inspector within 24h
- Unauthorized Material During Examination
- Reject application; reexamination barred ≥1 year
PSI Outline Counts: Part 1
- General knowledge and problem solving
- G5–4: 20; G3: 10; G2–1: 5
- Basic electricity
- G5–4: 5; G3: 5; G2–1: 5
- Boiler types and equipment
- G5–4: 5; G3: 10; G2–1: 5
- Burners and fuel train
- G5–4: 5; G3: 10; G2–1: 10
- Pumps and valves
- G5–4: 5; G3: 10; G2–1: 10
- Sequential operations
- G5–4: 0; G3: 10; G2–1: 10
PSI Outline Counts: Part 2
- Inspections and maintenance
- G5–4: 5; G3: 5; G2–1: 10
- Central station and chillers
- G5–4: 0; G3: 5; G2–1: 5
- Water treatment
- G5–4: 5; G3: 5; G2–1: 10
- Emergency operations
- G5–4: 5; G3: 5; G2–1: 5
- Auxiliary equipment
- G5–4: 5; G3: 5; G2–1: 5
Firetube vs Watertube Boilers
Firetube Boiler
- Hot gases pass inside tubes
- Large water volume, slower response
- Often lower duty; design ratings govern
Watertube Boiler
- Water circulates inside the tubes
- Often faster response; design-dependent
- Handles high pressures and loads
Gas in tubes vs water
Boiler Types, ASME & Fittings
- ASME Section I
- Power-boiler construction; steam above 15 psig
- ASME Section IV
- Heating-boiler construction; applicable limits and edition
- ASME Section VIII
- Pressure-vessel construction; scope and exclusions apply
- MAWP and Valve Settings
- At least one valve ≤MAWPPower boiler, COMAR .24G
- Safety Valve Rule
- Direct connection; no shutoff valve
- Try-Lever Test
- Movement check, not set-pressure calibration
- Water Column
- Dampens surges; test per approved procedure
- Non-Return Valve
- Prevents backflow when boiler pressure drops
- Existing Power Boiler Additional Valves
- Settings ≤103% MAWP; full conditions apply
Operating Control vs High-Limit Control
Operating Control
- Cycles or modulates burner daily
- Holds normal operating pressure
- Normal cycling follows control design
High-Limit Control
- Independent protective limit on unsafe conditions
- Setting coordinated with approved relief protection
- Reset mode follows applicable code/design
Normal cycling vs safety lockout
Three Ts of Complete Combustion
Temperature, Turbulence, and Time with right oxygen
Low-Water Emergency vs Tube Rupture
Low-Water Condition
- Secure heat input under emergency procedure
- Dry/overheated boiler: no water addition
- Inspect and obtain authorized restart clearance
Tube Rupture
- Secure heat input under emergency procedure
- Feedwater decision depends on boiler condition
- Isolation follows equipment-specific approved procedure
Overheating risk vs rupture-specific response
Boiler Emergency Action Picker
- Low water; dry/overheated boiler suspected→Secure heat input; no water addition(Approved shutdown and inspection before restart)
- Boiler tube ruptures on line→Approved emergency shutdown; keep personnel clear(Condition/equipment determine feedwater and isolation)
- Safety valve lifts repeatedly→Prevent overpressure; investigate controls through procedure(Never gag or obstruct relief)
- Burner trips on flame failure→Investigate cause; approved purge before restart(No repeated blind resets)
- Boiler accident or explosion occurs→Notify Chief Inspector within 24h
Burners, Draft & Flame Safeguard
- 3 Ts of Combustion
- Temperature, turbulence, and time
- Complete Hydrocarbon Combustion
- CO₂ and water; other products possible
- Incomplete Sign
- Carbon monoxide, smoke, or soot
- Forced Draft
- Fan pushes air toward combustion chamber
- Induced Draft
- Fan draws combustion gases toward stack
- Balanced Draft
- Both fans; controlled furnace pressure
- Pre-Purge / Post-Purge
- Prescribed airflow clears accumulated combustibles
- Flame Scanner
- Flame-safeguard system trips fuel upon failure
Bottom Blowdown vs Surface Blowdown
Bottom Blowdown
- Drawn from lowest mud drum
- Short, intermittent valve operation
- Removes settled sludge solids
Surface Blowdown
- Skims just below water line
- Metered continuous or intermittent design
- Controls total dissolved solids (TDS)
Settled sludge vs surface TDS
Water Problems: Treatment-Plan Decisions
- TDS exceeds approved treatment-plan limit→Adjust blowdown under the approved plan(No universal valve opening or flow)
- Sludge settles in mud drum→Approved intermittent bottom-blowdown procedure
- Calcium and magnesium hardness present→Verify softener and approved treatment plan
- Dissolved oxygen causing tube pitting→Check deaeration and prescribed scavenger treatment(Qualified treatment specialist sets chemical dose)
Water Treatment & Blowdown
- Scale
- Hard deposits; hardness often contributes
- Sludge
- Loose settled suspended solids
- Dissolved Oxygen
- Causes localized tube metal pitting
- Deaerator
- Heats and vents non-condensable gases
- Oxygen Scavenger
- Chemically removes residual dissolved O2
- Zeolite Softener
- Swaps Ca/Mg ions for sodium
- Bottom Blowdown
- Short intermittent removal of sludge
- Surface Blowdown
- TDS control; continuous or intermittent design
Four-Step Refrigeration Cycle Order
Compressor, Condenser, Expansion device, Evaporator in loop
Centrifugal vs Positive Displacement Pump
Centrifugal Pump
- Uses rotating impeller velocity
- Flow drops as pressure rises
- Closed discharge can overheat; follow manufacturer
Positive Displacement
- Moves fixed volume per stroke
- Builds destructive pressure if blocked
- Protect blocked discharge with approved relief
Variable flow vs fixed displacement
Auxiliaries, Pumps & Chillers
- Elevated Deaerator
- Provides NPSH to feed pump
- Cavitation
- Vapor bubbles form, then collapse
- Surface Condenser
- Condenses exhaust; supports turbine vacuum
- Economizer
- Preheats feedwater using flue gas
- Compressor
- Raises refrigerant pressure and temperature
- Condenser (Chiller)
- Rejects heat, liquefies refrigerant
- Expansion Device
- Throttles pressure; refrigerant partly flashes
- Evaporator
- Absorbs heat from building load
Basic Electricity & Motor Controls
- Ohm's Law
- Volts equal amps times ohmsE = I × R
- DC Electric Power
- Watts equal volts times ampsP = E × I; DC
- Series Circuit
- Same current; voltages add up
- Parallel Circuit
- Same voltage; branch currents add
- Motor Overload
- Protects windings from sustained overcurrent
- Fuses / Breakers
- Protect against short-circuit faults
- Lockout / Tagout
- Isolate, lock, control stored energy, verify
- AC Real Power
- Single-phase: V × I × power-factor
Common Traps
Single-Unit Capacity vs Plant Capacity
Licence grade: largest individual regulated unit ≠ Plant total: not the grade calculation
Engineer Licensing vs Equipment Inspection
Title 6.5: engineer grades and attendance ≠ Title 12-9: equipment inspection and certificates
Routine Feedwater vs Overheated Dry Boiler
Normal operation: maintain approved water level ≠ Overheated dry boiler: no water addition
Gauge Indication vs Verified Water Level
Motionless glass: potentially obstructed, not proof ≠ Approved verification: investigate uncertain water level
Softening vs Deaeration
Softener: exchanges calcium and magnesium ions ≠ Deaerator: heats and removes dissolved gases
Ordinary Reciprocity vs Military Recognition
Ordinary route: no out-of-state reciprocity ≠ Qualified military relocation: separate recognition provisions
Last Minute
- 1.Trigger: >15 psi AND ≥30 HP
- 2.Heating boilers: excluded from licensing definition
- 3.Grade: largest single regulated unit
- 4.Pass: 70% (42/60; 56/80)
- 5.G5–4: approved open-book; G3–1: closed-book
- 6.Reapplication: first 30 days; subsequent 60
- 7.Power certificate extension: Board-approved, not automatic
- 8.Required certification: display licence with photograph
- 9.Identification: valid government-issued photo ID available
- 10.Boiler accident notice: within 24 hours
- 11.Safety relief: no intervening shutoff valve
- 12.Dry/overheated boiler: no water addition
- 13.Steam admission: equipment-specific approved pressure sequence
- 14.Qualifying manual reset: physical inspection first
Explore More Boiler Operator
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
More From This Family
Videos and articles for deeper review.