If you’re at least 18 and new to boiler operation in Minnesota, start with the Special Engineer license. You can apply without prior operating experience or an experience affidavit. Submit the application and $50 exam fee, wait for the Minnesota Department of Labor and Industry (DLI) to approve you to test, and pass the 50-question exam with at least 70%. Applicants ages 16 and 17 must be enrolled in a course approved by the commissioner. Minnesota’s license statute · Experience rule · DLI class chart
If you already work with boilers or have a job posting that names a license like 2-C or 2-B, start with the assignment. Ask what equipment the plant runs, how DLI rates the plant’s horsepower, and whether you would be in charge, working a shift, or assisting under supervision. Those answers tell you which license to investigate. Your documented experience tells you whether you’re ready to apply for it.
Match the license to the plant and the role
Minnesota has four standard classes for plants that require a licensed boiler engineer. The class sets the horsepower limits for the role. The grade determines which equipment the license covers within those limits. Special has its own scope. For Second, First, and Chief, the employer may write a license as 2C or 2-C, for example. Both refer to Second Class, Grade C. Minn. Stat. § 326B.978
| Minnesota class | Maximum horsepower in charge | Maximum horsepower as shift engineer | Standard operating experience before exam | DLI exam questions |
|---|---|---|---|---|
| Special Engineer | 50 hp | 100 hp | None | 50 |
| Second Class | 100 hp | 500 hp | 1 year on an appropriate boiler | 50 for C, 60 for B, 80 for A |
| First Class | 500 hp | Unlimited within grade | 3 years on an appropriate boiler | 100 for C, 100 for B, 130 for A |
| Chief | Unlimited within grade | Unlimited within grade | 5 years on an appropriate boiler, including 1 year as a licensed First Class engineer | 115 for C, 115 for B, 140 for A |
Grade C covers low-pressure boilers. Grade B covers low- and high-pressure boilers. Grade A adds steam engines and turbines. For steam or other vapor, the boundary is 15 psig. A hot-water boiler falls in the high-pressure category if it exceeds either 160 psig or 250°F. Special can cover either boiler pressure category within its role limits. It also permits work as an apprentice at a plant of any size under the direct supervision of a properly licensed engineer. Second Class can assist a shift engineer under direct supervision above its normal shift limit, within the grade’s equipment scope. Minnesota boiler definitions · Class and grade authority · DLI exam counts
Minnesota exempts hot-water supply boilers from the engineer license requirement. If the job listing just says “hot-water boiler,” ask what the equipment serves. A boiler supplying domestic hot water and one heating the building can have different licensing requirements. Minnesota’s boiler exemptions
Read a job posting with the plant rating in hand
Two 45 hp boilers share a header. If each is rated at 45 boiler horsepower for Minnesota licensing, the plant rates at 90 hp, even when only one boiler is firing. Special fits the horsepower limit for a shift engineer. For taking charge at that low-pressure plant, a 2-C covers the 90 hp and the pressure category. Ask the employer which role the job actually assigns. Minnesota counts all boilers connected to the header, including an idle boiler, so ask for the licensing rating of the whole plant when you see an individual boiler’s nameplate. Minnesota’s horsepower rating rule · Class and role limits
A 520 hp high-pressure process steam plant needs a shift engineer. Assume the plant has no steam engine or turbine. A 1-B covers the shift role under Minnesota’s standard classes. A 2-B can assist the shift engineer under direct supervision because the plant is above the 500 hp Second Class shift limit. The plant also has to designate a Chief Class engineer of the proper grade because it exceeds 300 hp. Ask who supervises the shift and who holds the chief designation when a posting uses a title such as “lead operator.” First and Second Class authority · High-pressure chief engineer rule
Check what experience you can document
For Special Engineer, the state rule calls for a signed application and sets no prior experience requirement. The DLI licensing page gives a general affidavit instruction, and DLI’s affidavit packet explicitly exempts Special applicants. Once licensed, a Minnesota resident planning to advance should save their license record and start logging actual operating experience. DLI’s instructions let Minnesota residents claim experience gained while they held a valid license. Record when you operated the plant, which equipment you worked on, and who can verify the work. Experience and documentation rule · DLI affidavit and instructions
For 2-C at a low-pressure heating plant, a qualifying year is a 12-month period that includes operating the boiler during the heating season and maintaining it during the rest of the year. If your job began partway through the heating season or you changed duties over the summer, map your dates and duties before counting the year. DLI’s affidavit instructions include a completed low-pressure steam plant entry to show how to record horsepower, working pressure, and both dates. Experience rule, subpart 10 · DLI’s completed 2-C example
For a high-pressure upgrade, a year is at least 2,000 hours of qualifying experience. The DLI chart lists 2,000 boiler operating hours for 2-B, 6,000 for 1-B and 10,000 for Chief B. A year on payroll can include other maintenance duties, so track the actual qualifying hours. Grade A requires high-pressure boiler experience that includes time operating a steam engine or turbine. Second Class Grade A calls for one year of that equipment experience within the required boiler year. First Class and Chief Grade A call for at least two years of it within their required boiler experience. Grade A and time requirements · DLI class chart
What to bring to the person signing your affidavit
- Your work record. Bring the plant name and location, your operator license number, and exact start and end dates. Note your duties and high-pressure or engine and turbine hours where applicable.
- The right plant data. For steam, bring the licensing horsepower and maximum working pressure. For hot water, gather the boiler rating, pressure and temperature. Use the rating DLI applies for licensing, including its calculation rules when heating surface is unavailable.
- A verifier who knows your work. DLI asks the plant’s Chief Engineer to sign when there is one. The rule allows a notarized DLI affidavit signed by the owner, employer, or a holder of a valid Minnesota Second Class or higher operating engineer license. Review the completed form before filing and keep a copy. DLI affidavit · Minn. R. 5225.0550, subpart 9 · Horsepower rating rule
Rule 5225.0550 also allows verified military or maritime records and a qualifying notarized employer letter. Applicants claiming experience from a jurisdiction that requires a license must show they complied with that jurisdiction’s licensing requirements. Experience generally needs to fall within the 10 years before applying. If a past employer has closed or your record falls outside that period, ask DLI which documentation the chief boiler inspector can consider before paying the exam fee. Minn. R. 5225.0550, subparts 1 and 9
Apply, take the exam, and pay for license issuance
- Apply for the specific class and grade. Open DLI’s licensing page for the iMS application or use its paper exam form. Pay the nonrefundable $50 application and exam fee. Submit the experience documentation for an initial Second, First, or Chief application. DLI boiler engineer licensing · DLI exam application
- Schedule after approval. DLI emails instructions for booking in iMS. Take the exam within one year of the eligibility notification. If you miss the scheduled exam, you can reschedule once within that same one-year window. Check iMS for dates that offer your exam at the location you want. DLI exam scheduling · Minn. Stat. § 326B.093
- Use the time limit for your exam. DLI allows 2.5 hours for all boiler exams, and the passing score is 70%. The question count in the table helps you set a practice pace. If you fail, wait at least 30 days from the exam date to submit a new application and fee. DLI’s retest form instructions waive the affidavit for a retest. DLI time limits · Passing-score rule · Reapplication statute · DLI exam application
- Pay the separate fee after approval. The two-year license costs $20 for Special, $40 for Second or First, and $80 for Chief. With one exam application, that comes to $70, $90, or $130 in state fees respectively. Pay within 180 days of DLI’s license approval notification so the department can issue the license. DLI fee schedule · License issuance statute
Study for the license you picked
For Special, start with DLI’s Special Engineer study material and practice explaining what the safety valve, low-water cutoff, and operating controls do. Use DLI’s steam and hot-water diagrams to name the components on each type. Then take a set of free Minnesota boiler engineer practice questions from OpenExamPrep. When you miss a licensing question, write down whether the role, plant horsepower, or equipment changed the answer. DLI study materials by license · DLI boiler diagrams
For an upgrade, review DLI’s Second Class through Chief statutes and rules alongside the reading list for your grade. For application deadlines, use the current statute and DLI’s scheduling instructions. A 2-C candidate can start with low-pressure operation and the Minnesota rules on licensing and recordkeeping. For Grade B, use the high-pressure reading list. For Grade A, give steam engines and turbines their own study block. DLI’s chart says Grade A exams also include Grade B material. Use the Minnesota Boiler Engineer study guide to revisit the topics you miss, then work through a fresh practice set and explain each answer in your own words. DLI reading list · DLI exam chart
