6.3 Construction Occupational Safety and Health: RA 11058 and DOLE DO 13

Key Takeaways

  • RA 11058 allows DOLE to impose administrative fines of up to ₱100,000 per day until an OSH violation is corrected.

  • DOLE DO 13 (1998) requires every construction project to have a Construction Safety and Health Program submitted to the Bureau of Working Conditions.

  • Under DO 13, workers on unguarded surfaces 6 meters or more above ground or water must be provided with safety harnesses and lifelines.

  • DO 13 requires the cost of the safety and health program to be a separate pay item in the tender and contract documents.

  • DO 13 requires a 40-hour basic construction safety and health training course for safety personnel, plus 16 hours of continuing training each year.

Last updated: October 2026

6.3 Construction Occupational Safety and Health: RA 11058 and DOLE DO 13

The AMSTHC TOS area "Construction Occupational Safety and Health" has five competencies:

  1. Enumerate injury accidents, their causes, and the cost of construction worker injuries.
  2. Recall the salient features of RA 11058.
  3. Identify problem areas in construction safety and the elements of an effective program.
  4. Assess safety issues in contracts, record keeping, safety culture and safe workers.
  5. Describe top-management practices, company activities and project coordination for safety.

The legal framework has three layers:

  • The Labor Code and the Occupational Safety and Health Standards (OSHS), including Rule 1410 on construction safety.
  • DOLE Department Order No. 13, s. 1998, "Guidelines Governing Occupational Safety and Health in the Construction Industry."
  • RA 11058 (2018), "An Act Strengthening Compliance with Occupational Safety and Health Standards and Providing Penalties for Violations Thereof." Its implementing rules were DO 198-18, which DO 252-25 revised effective May 16, 2025.

Accidents, Causes and Costs

Major construction hazards:

  • falls from height (scaffolds, slab edges, roofs, openings);
  • being struck by falling objects or moving equipment;
  • caught-in or between incidents (trench collapse, machinery);
  • electrocution;
  • collapse of formwork or temporary structures.

Causes:

  • Unsafe acts: working without fall protection, bypassing guards, operating equipment without certification.
  • Unsafe conditions: missing guardrails, unshored trenches, poor housekeeping, defective equipment.
  • Root causes often lie in management: inadequate planning, training, supervision and budget.

Costs.

  • Direct (insured) costs include medical care and compensation.
  • Indirect (uninsured) costs are usually several times larger: lost productivity, idle crews, damaged equipment and materials, investigation time, schedule delays, legal costs, and damage to reputation.

Accident statistics let projects compare performance:

Frequency rate=Lost-time injuries×1,000,000Hours worked,Severity rate=Days lost×1,000,000Hours worked\text{Frequency rate} = \frac{\text{Lost-time injuries} \times 1{,}000{,}000}{\text{Hours worked}}, \qquad \text{Severity rate} = \frac{\text{Days lost} \times 1{,}000{,}000}{\text{Hours worked}}

Example. A project logs 400,000 work-hours with 2 lost-time injuries and 70 days lost. The frequency rate is 2(106)/400,000=5.02(10^6)/400{,}000 = 5.0 and the severity rate is 70(106)/400,000=17570(10^6)/400{,}000 = 175.


RA 11058: Salient Features

  • Coverage. All establishments, projects and sites, including those in economic zones.
  • Employer duties.
    • Provide a safe workplace and comply with the OSH standards.
    • Furnish personal protective equipment (PPE) at no cost to workers.
    • Give hazard information and training.
    • Keep and report records of illnesses and accidents.
  • Workers' rights.
    • The right to know the hazards of the work.
    • The right to refuse unsafe work where there is imminent danger, without loss of pay or reprisal.
    • The right to report accidents and hazards.
    • The right to PPE.
  • OSH program and personnel. Workplaces must have an OSH program, an OSH committee, trained safety officers, and first-aid or health personnel scaled to workforce size and risk.
  • Enforcement. DOLE may issue compliance orders and work stoppage orders where there is imminent danger.
  • Penalties. Section 28 allows administrative fines of up to ₱100,000 per day until the violation is corrected. The maximum applies when the violation exposes workers to death, serious injury or serious illness. Separate fines apply to obstruction and concealment.

DOLE DO 13: Construction Requirements

ProvisionRequirement
Construction Safety and Health Program (Sec. 5)Required for every project. It states committee composition, safety policies including toolbox meetings, penalties, training, and waste disposal. It is executed and verified by the project manager and submitted to the Bureau of Working Conditions, which may approve, disapprove or modify it.
Program cost (Sec. 5.3)Integrated into project cost as a separate pay item in tender and contract documents
PPE (Sec. 6)Furnished by the employer at its own expense. Workers on unguarded surfaces 6 m or more above ground or water, or exposed to dangerous falls, must have safety harnesses and lifelines.
Safety personnel (Sec. 7)A full-time general construction safety and health officer; additional officers by workforce size; one officer for every 10 units of heavy equipment; a safety representative for each subcontractor
Emergency health personnel (Sec. 8)Certified first-aider for 50 or fewer workers; full-time nurse for 51 to 200; nurse plus part-time physician and dentist for 201 to 300; full-time physician and infirmary beyond 300
Heavy equipment (Sec. 10)Operators tested and certified (TESDA); equipment tested and certified; daily inspection logbooks
Safety committee (Sec. 11)Chaired by the project manager; initiates daily toolbox meetings
Training (Sec. 12–13)Safety and health awareness seminar before deployment; specialized training for scaffold work, excavations at least 1 m deep, explosives, pile driving and similar work; 40-hour basic construction safety training for safety personnel, plus 16 hours per year continuing
Reports (Sec. 14)Monthly safety report. Notify the DOLE regional office within 24 hours of a dangerous occurrence or a major accident causing death or permanent total disability.

Problem Areas and Elements of an Effective Program

Problem areas:

  • excavations and trenches (cave-in, falling material, access);
  • scaffolds and work at height;
  • cranes and rigging;
  • electrical systems;
  • formwork and shoring;
  • demolition;
  • confined spaces;
  • traffic at road works.

Elements of an effective program:

  1. Management commitment in a written policy, budget and visible leadership.
  2. Hazard identification and risk assessment before each activity, with controls chosen by the hierarchy of controls: elimination, substitution, engineering controls, administrative controls, then PPE as the last line of defense.
  3. Training and orientation for every worker, including daily toolbox meetings.
  4. Inspection and auditing of scaffolds, equipment and housekeeping.
  5. Incident reporting and investigation, aimed at root causes rather than blame.
  6. Emergency preparedness: first aid, evacuation, fire response.
  7. Subcontractor control: the same rules for all workers on site.

Safety in Contracts, Records and Culture

  • Contracts. Specify safety requirements and the safety pay item, require approval of the safety program before mobilization, and allocate responsibility among owner, contractor and subcontractors.
  • Records. Keep training records, toolbox meeting minutes, inspection checklists, equipment certifications, accident and near-miss reports, and the monthly reports to DOLE.
  • Safety culture means workers stop unsafe work without fear and report near misses. Supervisors are measured on safety as well as progress.
  • Management practices.
    • Plan safety into the schedule, for example installing edge protection as each slab is cast.
    • Coordinate trades so they do not work above one another.
    • Hold pre-task meetings.
    • Recognize good performance.
Loading diagram...
Hierarchy of Hazard Controls
Test Your Knowledge

Under DOLE Department Order No. 13 (1998), at what height above ground or water must construction workers on unguarded surfaces be provided with safety harnesses and lifelines?

A

1.8 m or more

B

3 m or more

C

6 m or more

D

10 m or more

Test Your Knowledge

What is the maximum administrative fine under Section 28 of RA 11058 for willful failure to comply with occupational safety and health standards?

A

₱50,000 per month

B

₱100,000 per day until the violation is corrected

C

₱2,000 per day

D

₱10,000 per violation

Test Your Knowledge

A contractor logged 500,000 work-hours with 3 lost-time injuries. What is the frequency rate per million hours worked?

A

1.5

B

6.0

C

0.6

D

3.0

Sections you finish are checked off in the contents.