10.3 Change Management & Problem Solving

Key Takeaways

  • Kurt Lewin's three-stage change process is unfreezing, changing, and refreezing.
  • The five most common responses to change are distrust, uncertainty, self-interest, different perception/no felt need to change, and over-determination.
  • The four continuous improvement methodologies are Lean, Six Sigma, Business Process Reengineering, and Theory of Constraints.
  • Incorrect root-cause determination is the most common mistake made during continuous improvement efforts, and Step 8 — standardize successful processes — is the most commonly neglected step.
  • The three levels of problem solving are Just Do It (one person, less than a day), Rapid Improvement Event (small team, less than a week), and Improvement Project (large team, longer period).
Last updated: August 2026

When Change Is Appropriate

AFH 1 defines the trigger: "Change is appropriate when there is a perceived gap between what the norms are and what they should be." And it insists change is deliberate: "Organizational change is not automatic. It is the deliberate adoption of a new idea or behavior by an organization and the establishment of new norms." Those norms can involve technology, tasks, structure, and resources, including people.

The leader's sequence has three parts:

  1. Create an organizational climate conducive to change by explaining the limitations or shortfalls of the present process and the possibilities and benefits of the proposed change
  2. Facilitate the change itself by walking Airmen through the change, explaining the details, and answering questions
  3. Show appreciation for those who contribute to the change and help refocus those who do not

AFH 1 names the ideal disposition: "Tough-minded, realistic optimism is the best quality a leader can demonstrate when coping with change." It also states that Airmen of all skills and jobs should possess a mindset of critical thinking and problem solving as their first duty.

The Five Responses to Change

The change agent is defined as "the person advocating for or leading the organizational change," and AFH 1 states that "an essential element for preventing or overcoming resistance to change is establishing a well thought out plan" — planning lets the change agent build confidence, anticipate questions, develop courses of action, and address opposing perceptions.

ResponseWhat it looks like
DistrustImposed change met with tough questions to ensure the purpose and intent are understood. Leaders unprepared to clarify or explain thought processes will struggle to gain buy-in
UncertaintyFear of the unknown, or seeing the change as a threat to organizational stability and job security — will I still have a job, can I do the new job, must I learn a new process
Self-interestPeople consider the position they currently have or their role in the existing environment and question the direction and capabilities of those in power after implementation
Different Perception / No Felt Need to ChangePeople see the situation differently, particularly if the change has been dropped on them. The remedy is an environment of open communication
Over-DeterminationIronically, organizational structure may be a barrier to change — a mechanistic structure relying on strict procedure and lines of authority may be so rigid that it inhibits change and possibly damages professional relationships

Over-determination is the one candidates forget, and it links directly back to Section 13B's mechanistic structure.

Reducing Resistance — Five Approaches

ApproachAFH 1's guidance
Education and CommunicationOpen communication throughout the process reduces uncertainty; educating people about the need for and expected results reduces resistance
Participation and InvolvementActively involving those affected in designing and implementing change generates ownership and commitment
Facilitation and SupportIntroduce the change gradually and provide additional training if needed
Negotiation and AgreementOffer incentives to those who continue to resist; negotiated agreements help remind employees of the changes agreed upon
CoercionA forcing technique to make employees accept change. It can negatively affect attitudes and cause long-term negative consequences. AFH 1 states plainly: coerced compliance is not recommended and requires constant leadership oversight

Any scenario answer built on coercion is almost always the least effective option — AFH 1 says so directly.

Lewin's Three-Stage Change Process

AFH 1 credits renowned social psychologist Kurt Lewin with the model. Change agents must analyze restraining or opposing forces and devise ways to reduce them, while recognizing and strengthening supporting forces — those pushing toward change.

StageWhat happens
Stage 1: UnfreezingA deliberate management activity to prepare people for change. AFH 1 calls the most neglected yet essential part of unfreezing "creating an environment where people feel the need for change." The key factor is making people knowledgeable about the importance of the change and how it will affect their jobs
Stage 2: ChangingModifying technology, tasks, structure, or distribution of people — moving from the old state to the new by installing new equipment, restructuring work centers, or implementing procedures. "Changing is anything that alters the previously accepted status quo." Watch for negative employee reactions as a sign of implementing too early
Stage 3: RefreezingLock in the desired outcomes and new norms so they become permanent. A critical step is remaining engaged and evaluating results. Positively reinforcing desired outcomes is crucial, and highlighting successful change helps reduce the desire to return to the old way

AFH 1 adds a note that answers a common scenario: "Readdressing unfreezing techniques is better than forcing a change that causes more problems than it resolves." If a change is going badly, go back to unfreezing rather than pushing harder.

Continuous Improvement

Continuous Improvement (CI) "increases operational capabilities while reducing associated costs by applying proven methodologies to all processes." It is built around three concepts: there are always ways a process can be improved, organizations must constantly strive to make those improvements based on performance metrics aligned to strategic objectives, and efficiencies should be replicated to the extent practical.

AFH 1 stacks up CI's institutional weight — it is an Airman Leadership Quality, is a commander's responsibility (AFI 1-2), is a major graded area in the Air Force Inspection System (AFI 90-201), and is a focal point within Air Force Standards under "Excellence In All We Do" (AFI 1-1).

The Four Methodologies

MethodologyPrimary focus
LeanWorkflow, customer value, and eliminating process waste — unique in that the primary focus is eliminating non-value-added activities
Six SigmaA rigorous, data-driven methodology minimizing waste by identifying, controlling, and reducing process variation
Business Process ReengineeringA comprehensive process requiring a change in the fundamental way business processes are performed; identifies unnecessary activities and eliminates them
Theory of ConstraintsA systematic approach to optimize resource utilization by identifying, exploiting, subordinating, elevating, and reassessing constraints (bottlenecks)

The discriminator: Lean = waste/non-value-added; Six Sigma = variation; BPR = fundamental redesign; Theory of Constraints = bottlenecks.

The Practical Problem-Solving Method — Eight Steps

StepFocusKey rules
1. Clarify and Validate the ProblemDevelop a problem statement using data to identify where the problem occurs, its impact, and performance against a standardA problem statement does not assume a root cause, solution, or countermeasure. If data does not exist, pause the effort to collect and analyze it
2. Break Down Problem and Identify Performance GapsAnalyze data in comparison to the expected outcomeThe gap between current state and end state is the performance gap
3. Set Improvement TargetsSet targets based on expected outcomes and strategic goalsTargets should be challenging but achievable
4. Determine Root CauseAddress root causes rather than symptomsInvolves a tradeoff between digging as deeply as possible and finding the deepest point within the team's sphere of influence. Validate using the same data used to define the problem in Step 1
5. Develop CountermeasuresAddress root causes with practical, efficient, and effective countermeasures"The impact of a solution is a combination of the quality of the solution and the acceptance of the solution by people who implement it." Obtain a vector check for strategic alignment
6. See Countermeasures ThroughExecution and tracking of detailed implementation plansReviews and progress checks updated regularly
7. Confirm Results and ProcessCompare results to performance gaps, targets, and expected outcomeIncorrect root-cause determination is the most common mistake made during CI efforts. If targets are not met, it may be necessary to return to Step 4
8. Standardize Successful ProcessesCodify the resultsThe most commonly neglected step of the entire method

Step 8's three questions: What is needed to standardize the improvements? (submission to the Airmen Powered by Innovation Program, or change requests for technical orders, instructions, manuals, materiel, suppliers). How should improvements and lessons learned be communicated? (make the wing process manager aware; input to the USAF CI portal, key meetings, publications, public affairs, the chain of command). Were other opportunities or problems identified?

The Three Levels of Effort

LevelTeam sizeDurationAFH 1's examples
Just Do It (point improvement)One person or a small teamLess than a dayUsing torque wrenches instead of adjustable wrenches; routing paperwork electronically
Rapid Improvement EventSmall team of subject matter expertsLess than a weekImproving aircraft servicing cycle times; improving first-time pass yields on taskers
Improvement ProjectLarge teamLonger period of timeShortening aircraft annual overhaul cycle time; writing software to track annual overhauls

Project Management

AFH 1 defines project management as "the process of leading, coordinating, planning, and controlling a diverse and complex set of processes and people in the pursuit of achieving an established objective," and immediately draws the distinction that gets tested: "a project is not a program; programs are ongoing. A project is temporary, based on an established objective that has a generalized time frame attached to it."

The six project management steps: Define the Project Objective → Develop Solution Options → Plan the Project → Execute the Plan → Monitor and Control Progress → Close the Project. On the last, AFH 1 insists: document and discuss lessons learned — what went well, what didn't, and what should be addressed.

The three constraints are Quality (being in accordance with the requirement — the specifications), Time (the amount of time to complete the project), and Cost (resource constraints including money, manpower, machinery, and materials). One of the three will be your driver, and the driving constraint will have an impact on the other two.

Two planning techniques:

  • Work breakdown structuredivides a project into sub-units or work packages, typically at two or three levels of detail, minimizing the chance of neglecting or overlooking an essential step
  • Task analysis — adds what a work breakdown structure does not show: task milestones, how milestones can be measured, and resources or requirements. It provides the crucial information for determining how the tasks interrelate, and proper sequencing must be established before beginning a project
Test Your Knowledge

According to AFH 1, which is the most common mistake made during continuous improvement efforts, and which step of the practical problem-solving method is most commonly neglected?

A
B
C
D
Test Your Knowledge

Which response to change does AFH 1 describe as ironic, because the organization's own structure becomes the barrier?

A
B
C
D
Test Your Knowledge

A supervisor is halfway through implementing a new work center procedure and is seeing sustained negative reactions and bogged-down production. What does AFH 1 recommend?

A
B
C
D