Free Practice Questions for C&G 2922-34 Solar PV
Exam-style questions and explanations by OpenExamPrep.
Loading practice questions...
Explore More City & Guilds UK Trade Qualifications
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
More From This Family
Videos and articles for deeper review.
Key Facts: C&G 2922-34 Solar PV Exam
100
Practice Questions
OpenExamPrep
30
Knowledge-Test Questions
City & Guilds
60 min
Online Test Time
City & Guilds
~75%
Pass Mark
City & Guilds
Section 712
BS 7671 PV Rules
IET
16 A/phase
G98/G99 Threshold
ENA
The City & Guilds 2922-34 Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic (PV) Systems is a UK CPD qualification for practising electricians who install and maintain small solar PV systems in domestic and small commercial settings. Assessment is an online e-volve multiple-choice knowledge test (30 questions, 60 minutes, pass mark approximately 75%) plus a practical assignment. Learners must be 18 or over and hold a Level 3 electrotechnical qualification (such as C&G 2357 or 5357) or an ECS Gold Card. The online test covers documentation and legislation (7%), PV characteristics, components and architectures (30%), design and installation (53%), and micro-generation and EESS (10%); working safely and testing, commissioning and handover are assessed in the practical assignment. This free prep includes 100 research-based practice questions with explanations and an AI tutor.
Sample C&G 2922-34 Solar PV Practice Questions
Try these sample questions to review concepts for the C&G 2922-34 Solar PV exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 125+ question experience with AI tutoring.
1Under Standard Test Conditions (STC) used to rate the peak power of a PV module, what irradiance and cell temperature are specified?
2A PV module's power output is rated in which unit to reflect performance under Standard Test Conditions?
3Which PV cell technology typically offers the highest conversion efficiency per unit area in commercial UK domestic modules?
4What is the effect of increasing cell temperature above 25°C on a crystalline silicon PV module's output?
5When designing the maximum number of modules in a series string, which temperature condition produces the worst-case (highest) string open-circuit voltage that must not exceed the inverter's maximum input voltage?
6In a PV array, how does connecting modules in series affect the electrical characteristics of the string?
7What is the primary function of the Maximum Power Point Tracker (MPPT) within a grid-tied PV inverter?
8A grid-connected string inverter for a UK domestic PV system must NOT energise an islanded section of the network during a mains outage. Which protection function ensures this?
9Which Engineering Recommendation applies to the simple 'connect and notify' (fit-and-inform) approach for a single-phase domestic PV inverter rated at or below 16 A per phase?
10A single-phase domestic PV system uses an inverter rated above 16 A per phase (greater than approximately 3.68 kW). Which process must be followed before connecting to the grid?
About the C&G 2922-34 Solar PV Exam
The City & Guilds 2922-34 Level 3 Award is a UK qualification for installing and maintaining small solar photovoltaic (PV) systems in domestic and small commercial settings. It is continuing professional development (CPD) for already-qualified electricians, combining an online e-volve multiple-choice knowledge test (30 questions, 60 minutes) with a practical assignment, and the JIB and ECS recognise it as CPD for ECS Gold Card electricians.
Exam sponsor: City & Guilds. The requirements and fees below concern the certification or admission exam, separate from our free practice resources.
Assessment
An online multiple-choice knowledge test (30 questions, 60 minutes) delivered via City & Guilds e-volve at an approved centre, plus a separate practical assignment; the knowledge-test pass mark is approximately 75%. This practice bank is 100 selected-response items.
Time Limit
60 minutes for the online knowledge test
Passing Score
Approximately 75% (knowledge test) plus a pass in the practical assessment
Exam / Certification Fees
Bundled in the training-centre course/assessment fee (course typically £400-£700)
Exam sponsor websiteFees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.
Our practice resources: topics covered
We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.
Documentation and Legislation
Statutory requirements such as EAWR, HASAWA, ESQCR, Building Regulations and WEEE, plus non-statutory guidance including BS 7671, the IET Codes of Practice, MCS MIS 3002 and MIS 3012, and ENA G98, G99 and G100 (LO1, 2 questions)
PV Characteristics, Components and Architectures
Cell and module types and efficiencies, inverter types and functions, metering, IV curves, reverse currents and bypass diodes, potential induced degradation, array architectures, standard test conditions and datasheet symbols (LO3, 9 questions)
Design and Installation
Performance factors and shading, yield estimates, G98/G99 notification, DC voltage and current ratings, string overcurrent protection, DC isolation, cables and fault protection, surge protection, inverter sizing and location, AC isolation, RCDs, G99 relays and labelling (LO4, 16 questions)
Micro-generation and EESS
Prosumer installations, energy management systems, island-mode operation, arbitrage, self-consumption, V2G and V2H, G100 export limitation and reasons for battery storage (LO6, 3 questions)
Preparing for the C&G 2922-34 Solar PV Exam
What You Need to Know
- Passing score: Approximately 75% (knowledge test) plus a pass in the practical assessment
- Assessment: An online multiple-choice knowledge test (30 questions, 60 minutes) delivered via City & Guilds e-volve at an approved centre, plus a separate practical assignment; the knowledge-test pass mark is approximately 75%. This practice bank is 100 selected-response items.
- Time limit: 60 minutes for the online knowledge test
- Exam / certification fees: Bundled in the training-centre course/assessment fee (course typically £400-£700) Official sources
Using Our Practice Resources
- Work through all 125 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
C&G 2922-34 Solar PV: Suggested Study Strategy
Frequently Asked Questions
How many questions are on the City & Guilds 2922-34 Solar PV exam and how long is it?
The 2922-34 award is assessed by an online e-volve multiple-choice knowledge test of 30 questions in 60 minutes, plus a separate practical assignment. City & Guilds sets the knowledge-test pass mark at approximately 75%.
What score do I need to pass the 2922-34 knowledge test?
The online knowledge test pass mark is typically around 75%, and you must also pass the practical assessment. Because the syllabus spans PV theory, design, BS 7671 wiring, MCS/G98-G99 and testing, balanced preparation across every topic is the safest approach.
Who is eligible for the City & Guilds 2922-34 qualification?
It is CPD for qualified electricians aged 18 or over. You need a Level 3 electrotechnical qualification such as City & Guilds 2357 or 5357, or an ECS Gold Card, achieved no more than 5 years before starting unless you hold the latest Wiring Regulations qualification.
What topics does the Solar PV exam cover?
The online test covers key documentation and legislation (7%), the characteristics of PV systems, components and architectures (30%), design and installation considerations (53%), and micro-generation and EESS in prosumer installations (10%). Working safely and testing, commissioning and handover are assessed in the practical assignment.
Is the City & Guilds 2922 exam taken online?
The multiple-choice knowledge test is delivered online through City & Guilds e-volve at an approved training centre, but there is also a hands-on practical assessment that must be completed in person, so the qualification is not fully remote.
Does 2922-34 let me register with MCS to install solar PV?
MCS certifies installation contractors rather than individual electricians. MIS 3002 Issue 6.0 (mandatory from 18 June 2026) lists qualifications that can help demonstrate competency, and that list names the older City & Guilds 2399 solar PV awards rather than 2922-34, so confirm with your MCS certification body. The JIB and ECS recognise 2922-34 as CPD for ECS Gold Card electricians.