Free C&G 2922-34 Exam Prep
City & Guilds 2922-34 Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic (PV) Systems
Prepare for the C&G 2922-34 exam without spending hundreds on expensive prep courses. Free study guides, practice questions, flashcards, and related exam resources.
Quick Facts
Explore More City & Guilds UK Trade Qualifications
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
More From This Family
Videos and articles for deeper review.
C&G City & Guilds UK Trade Qualifications License: Complete Roadmap
Follow this path to organize your licensing and exam preparation
PV Principles, Cell Technology & System DesignYou are here
Learn how PV cells work, the cell technologies, STC and I-V behaviour, then site survey, orientation/tilt, shade analysis, the MCS kWp x kk estimate and string sizing within the MPPT window (~35% of the test).
Components, DC/AC Wiring & BS 7671 Section 712
Study modules, inverters, mounting and structural/wind loads, then PV cabling, DC isolation, string fusing, earthing/bonding, surge protection and the Section 712 requirements (~34%).
MCS, G98/G99 Grid Connection & Compliance
Master the Microgeneration Certification Scheme, G98 fit-and-inform vs G99 prior-approval, anti-islanding, the Smart Export Guarantee and DNO notification (~13%).
Testing, Commissioning, Maintenance & Safety
Cover the IEC 62446-1 DC test sequence, commissioning records and handover, maintenance and fault-finding, and safe working at height/isolation, then complete the 100-question practice bank and review every miss with the AI tutor (~18%).
Can You Take the C&G 2922-34 Exam?
Check if you meet the basic eligibility requirements
- •Hold City & Guilds Level 3 NVQ Diploma 2357 (or 2360/2330 route) or the C&G 5357 electrotechnical qualification
- •Or an equivalent ECS Gold Card issued by the JIB/SJIB
- •Existing competence in BS 7671 (18th Edition) inspection and testing is assumed
- •Complete the 2922-34 course, the online e-volve knowledge test, and the practical assessment
C&G 2922-34 Quick Facts
Time to Get Licensed
2-4 weeks alongside a 2-3 day training course
From start to license in hand
Exam Provider
City & Guilds e-volve (online knowledge test) at an approved centre, plus on-site practical assessment
Retake Policy
Candidates who do not pass the online knowledge test or practical may re-sit per the training centre's policy (a re-sit fee may apply).
Total Cost Breakdown
Free C&G 2922-34 Prep Tools
125+ Practice Questions
Practice by topic with detailed answer explanations
AI Tutor Explains Mistakes
Understand why answers are wrong, not just which ones
Independent Study Resources
Check the exam sponsor for current requirements
$0 Forever
Start without a credit card or trial
What You'll Study
15 chapters covering the exam topics in this guide
Introduction & Exam Overview
3 sections
Key Documentation and Legislation
3 sections
Non-Statutory Standards and Industry Guidance
3 sections
Working Safely with Solar PV Systems
3 sections
PV Cells, Modules and I-V Behaviour
3 sections
Inverters, Inverter Functions and Metering
3 sections
Array Behaviour, Architectures and Nameplate Symbols
3 sections
Site Performance: Pitch, Shade and Yield
3 sections
Array Capacity, DNO Connection and Equipment Siting
3 sections
DC Voltage, Current and Overcurrent Protection
3 sections
DC Isolation, Combiners, Connectors and Cables
3 sections
DC Fault Monitoring, Surge Protection and Inverter Sizing
3 sections
Inverter Location, AC Side and Labelling
4 sections
Testing, Commissioning, Handover and Maintenance
3 sections
Prosumer Installations, EEMS and Storage
3 sections
C&G 2922-34 Exam Details
City & Guilds 2922-34 Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic (PV) Systems
Administered by City & Guilds
Exam Content Breakdown
Based on the official City & Guilds content outline
How photovoltaic cells generate electricity, monocrystalline/polycrystalline/thin-film technologies, Standard Test Conditions (1000 W/m², 25°C), I-V characteristics, irradiance and temperature effects, and watt-peak rating
Site survey, orientation and tilt, shade analysis and the MCS kWp x kk yield estimate, series/parallel string configuration, MPPT window and temperature-corrected string voltage sizing
Module construction and bypass diodes, string and microinverters, MPPT, combiner boxes, MC4 connectors, on-roof/in-roof mounting, structural and wind loads, and metering
BS 7671 Section 712 requirements, PV cable to EN 50618, DC isolation, string overcurrent protection, voltage drop, earthing and bonding, surge protection and minimising loop area
Microgeneration Certification Scheme, ENA G98 fit-and-inform (up to 16 A/phase) and G99 prior-approval, anti-islanding protection, the Smart Export Guarantee and DNO requirements
IEC 62446-1 DC test sequence (continuity, polarity, Voc, Isc, insulation resistance), verifying readings against design, commissioning records, EIC and customer handover
Periodic inspection, soiling and shading, hot-spots and degradation, inverter fault codes, work at height, safe isolation of a dual-supply installation, and labelling
What's Included
15 Chapters
Complete exam coverage
Practice Quizzes
With detailed explanations
Free to Start
No credit card required

Quality Exam Prep Shouldn't Cost Hundreds
I'm Ran Chen, an engineer with 20+ years of coding experience. I passed my Life Insurance license, EA exam, SIE, Series 6, 63, 65, and finally the CFP® exam.
Through all these exams, one thing became clear: exam prep is expensive. But with AI, we can change that. Quality preparation can now be free for everyone.
What's Next After the C&G 2922-34?
After passing the C&G 2922-34, you can pursue these career paths
C&G 2922-34 Exam FAQ
Official City & Guilds Resources
Verify information with these official sources
More Free Resources
Ready to Start Your Free C&G 2922-34 Prep?
Review the study guide, practice key concepts, and use the free tools at your own pace.