Cheat sheet

AM2 and AM2S Cheat Sheet

Quick Facts

Assessment owner
National Electrotechnical Training
AM2 route
Level 3 NVQ final unit
Format
Practical assessment and online MCQs
AM2 Section E
30 questions · 60 min
AM2S Section E
30 questions · 60 min
AM2S v1 Section E
45 questions · 90 min
AM2 assessed time
16 h 15 min
AM2S assessed time
17 h 45 min
AM2S v1 assessed time
19 h
Passing requirement
Pass each required section
Section E references
Four centre-supplied publications

Risk Assessment Scan

Find hazards, assess harm, control, record, review.

Identify who could be harmedEliminate where practicableReview when circumstances change

Hazard vs Risk

Hazard

  • Source of possible harm
  • Exposed live part

Risk

  • Likelihood and severity
  • Chance of shock during contact

Identify source, then assess harm

Risk Assessment

Hazard
Potential source of harm
People at risk
Who could be harmed and how
Risk level
Likelihood and severity of harm
Elimination
Remove the hazard where practicable
PPE
Personal protective equipment
Assessment record
Document hazards and controls
Changed conditions
Review controls
AM2S v1 planning
Sequence work before composite installation
AM2 and AM2S A1
45 min each
AM2S v1 A1
60 min including planning

Workplace Safety Rules

Electricity at Work Regulations (GB)
Statutory duties for electrical safety
Regulation 12
Cut off supply and isolate
Regulation 13
Prevent inadvertent re-energisation
Regulation 14
Restricts work on/near live conductors
Regulation 16
Technical knowledge, experience or appropriate supervision
PUWER (GB)
Suitable and maintained work equipment
RIDDOR (GB)
Report specified work-related incidents

Earthing vs Bonding

Protective earthing

  • Connects exposed conductive parts to earth
  • Provides earth fault current path

Protective bonding

  • Links relevant conductive parts
  • Limits touch voltage differences

Fault path vs potential difference

Composite Circuits

AM2 installation
A2–A5 · 8 h 30 min
AM2S installation
A2–A6 · 10 h
AM2S v1 installation
A2–A6 · 10 h 30 min
TP&N distribution board
Three phases and neutral
A2
Lighting and ring final circuits
A3
Three-phase circuits
A4
Central heating control circuit
A5
Main bonding, safety and data circuits
A6 on AM2S routes
Containment installation

Installation Checks

Candidate specification
Positions, dimensions and materials
Schematic diagram
Circuit logic and relationships
Wiring diagram
Physical connection and termination details
Cable reference method
Match actual installation conditions
Rating factors
Check grouping, temperature and insulation
Voltage drop
Check design current and length
Termination
Check security and exposed copper
Functional checks
Verify specified sequence of operation

Protection Functions

Fuse
Overcurrent protection by melting element
Circuit-breaker
Trips on overcurrent
RCD
Residual current device
RCCB
Residual current protection only
RCBO
Residual current plus overcurrent protection
CPC
Circuit protective conductor
Main protective bonding
Limits potential differences between parts

Ze vs Zs

Ze

  • External to installation
  • Referenced at installation origin

Zs

  • Complete earth fault loop
  • Includes circuit line and CPC

External loop vs complete loop

Verification Test Picker

  1. Check protective conductor path→Protective continuity test(Dead test)
  2. Check ring conductor end-to-end paths→Ring final continuity tests(Dead tests)
  3. Check insulation between conductors→Insulation resistance test(Consider sensitive equipment)
  4. Confirm correct line connections→Dead polarity check(Before energising)
  5. Confirm polyphase terminal order→Phase sequence check(Inspect connections while dead)
  6. Check fault loop for disconnection→Verify earth fault loop impedance(Use applicable device limit)
  7. Check fault current at supply→Verify prospective fault current(Compare against equipment rating)
  8. Confirm RCD effectiveness→Verify RCD operating time(Use applicable device criterion)

Dead Test Purposes

Visual inspection
Check installation before testing
Protective continuity
Check CPC and bonding paths
Ring final continuity
Check line, neutral and CPC
r₁
Ring line end-to-end resistance
rₙ
Ring neutral end-to-end resistance
r₂
Ring CPC end-to-end resistance
Insulation resistance
Check separation between conductors
Dead polarity
Check correct line connections
Phase sequence
Verify phase order at terminations

Phase Sequence vs Phase Rotation

Phase sequence

  • Check terminal order
  • Dead inspection of connections

Phase rotation

  • Check rotating field direction
  • Live check with suitable instrument

Terminal order vs rotating field

Live Verification and Results

Ze
External earth fault loop impedance
Zs
Total earth fault loop impedance
R₁ + R₂
Line plus CPC resistance
Zs estimate
Ze + (R₁ + R₂)
PFC
Prospective fault current
PSCC
Prospective short-circuit current
PEFC
Prospective earth fault current
PFC for certificate
Greater of PSCC and PEFC
RCD effectiveness
Verify operating time for device
Phase rotation
Check rotating field direction

Certificate vs Condition Report

Electrical Installation Certificate

  • Initial verification of installation work
  • Include inspection and test schedules

Electrical Installation Condition Report

  • Periodic assessment of existing installation
  • Records condition and observed defects

Initial certification vs periodic reporting

Verification Records

Electrical Installation Certificate
Record initial verification
Schedule of Inspections
Record visual inspection outcomes
Schedule of Circuit Details
Record conductor and device details
Schedule of Test Results
Record readings by circuit
Measured Zs
Compare with applicable maximum
Sensitive equipment
Protect before insulation resistance testing
Functional testing
Confirm intended operation
Section B time
3 h 30 min
Assessment live tests
Under assessor supervision

Prove Dead

Identify, tell, isolate, lock, warn, prove, test, re-prove.

Identify circuit and suppliesTell affected peopleLock off and labelProve indicator before testingTest all relevant conductor pairsProve indicator again

Isolation vs Functional Switching

Safe isolation

  • Disconnect relevant supply sources
  • Secure isolation and prove dead

Functional switching

  • Control equipment during normal operation
  • May leave parts energised

Secure for work vs control

Isolation Equipment

Two-pole voltage indicator
Check absence of voltage
Proving unit
Verify indicator before and after
GS38
HSE guidance on test equipment
Lock-off device
Secure relevant points of isolation
Warning notice
Warn against reconnection
Multiple supplies
Identify every source affecting work
Failed re-prove
Repeat with verified equipment
Prove dead
Check at point of work

Section C Scenarios

Single-phase equipment
Isolate equipment's circuit
Three-phase equipment
Isolate equipment's circuit
Both replacement scenarios
Leave other circuits energised
Fault diagnosis bay
Isolate its distribution board
Available time
30 min for Section C
Single-phase conductor pairs
L–N, L–E and N–E
Three-phase with neutral
Check all 10 conductor pairs

Type, Place, Fix, Prove

Type, place, fix, prove.

Name fault typePinpoint locationPropose repairSpecify checks after repair

Open vs High Resistance

Open circuit

  • Intended path interrupted
  • Continuity absent across break

High resistance

  • Intended path still conducts
  • Resistance above expected value

Broken path vs impaired path

Fault Evidence Picker

  1. Expected path shows a break→Investigate open circuit(Trace isolated circuit in sections)
  2. Unintended low-resistance connection→Investigate short circuit(Compare against drawing)
  3. Excess resistance along intended path→Investigate high resistance(Check connections and components)
  4. Connection disagrees with drawing→Investigate misconnection(Trace conductor endpoints)
  5. Fault narrowed to a section→Name the actual endpoints(Or identify the component)
  6. Proposing a repair→Specify relevant verification tests(Demonstrate the fault is cleared)

Fault Signatures

Open circuit
Break in intended conducting path
Short circuit
Unintended low-impedance path
High resistance
Excess resistance in intended path
Misconnection
Conductor at unintended terminal
Loose termination
Possible high-resistance fault
Unexpected continuity
Check against drawing for misconnections

Fault Report

Starting point
Given symptoms and circuit drawing
Fault type
Classify from evidence
Fault location
Name two points or component
Rectification
Specify what needs correcting
Verification
Specify checks proving the repair
Available time
2 h for Section D

AM2S vs AM2S v1

AM2S

  • Registered before September 2023
  • 30 questions in 60 min

AM2S v1

  • Registered from September 2023
  • 45 questions in 90 min

Use your apprenticeship registration date

Section E Reference Picker

  1. Need wiring requirement→BS 7671
  2. Need test method→IET Guidance Note 3
  3. Need practical wiring guidance→IET On-Site Guide
  4. Need building regulation context→Electrician’s Guide to Building Regulations
  5. Sizing for current or voltage drop→BS 7671 Appendix 4
  6. Need certificate or schedule model→BS 7671 Appendix 6
  7. Unsure which AM2S version→Confirm with training provider

Section E Topics

All routes · Safety
Apply health and safety requirements
All routes · BS 7671
Apply Wiring Regulations
All routes · Buildings
Apply relevant Building Regulations
AM2S v1 · Verification
Inspection and testing
AM2S v1 · Installation
Installation practices
AM2S v1 · Faults
Diagnosis and rectification
AM2S v1 · Design
Design and planning
AM2S v1 · Behaviours
Customer service and professional conduct

Supplied References

BS 7671
Requirements for electrical installations
IET Guidance Note 3
Inspection and testing methods
IET On-Site Guide
Practical Wiring Regulations reference
Electrician’s Guide to Building Regulations
Building rules affecting electrical work
Current BS 7671 edition
2018+A4:2026 · Orange Book

Part P in England

Part P scope
Electrical safety in dwellings
New circuit
Notifiable in England
Replacement consumer unit
Notifiable in England
Existing circuit in special location
Additions or alterations are notifiable
Bath or shower special location
Defined space around bath or shower
Other special locations
Swimming pool or sauna heater rooms
Registered competent person
Can self-certify applicable work
Working in Wales
Check Welsh Approved Document P

Common Traps

Isolation evidence

Lock-off secures isolation ≠ Voltage check proves dead

Ring resistance notation

r₁ measures ring line end-to-end ≠ R₁ measures line path resistance

Protective device function

RCCB responds to residual current ≠ RCBO also protects against overcurrent

Fault verification

Fault location identifies the defect ≠ Retesting verifies the repair

Certification and notification

Installation certificate records verification ≠ Building control notification follows regulations

Supply with multiple sources

One supply disconnected ≠ Every relevant supply isolated

Assessment scope

Section E tests applied knowledge ≠ Practical sections demonstrate competence

Last Minute

  1. 1.Confirm your AM2 variant before revision
  2. 2.Practise using the four supplied references
  3. 3.Identify every supply before isolation
  4. 4.Prove the indicator before and after
  5. 5.Inspect the installation before testing
  6. 6.Check ring line, neutral and CPC
  7. 7.Check maximum earth fault loop impedance
  8. 8.Record verification results by circuit
  9. 9.State fault location, fix and verification
  10. 10.Check England's Part P notification triggers
Same family resources

Explore More UK Construction & Electrotechnical Trades

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.