A1 · Safe Working Practices
Not publishedof exam
A2 onwards · Composite Installation
Not publishedof exam
B · Inspection, Testing and Certification
Not publishedof exam
C · Safe Isolation of Circuits
Not publishedof exam
D · Fault Diagnosis and Rectification
Not publishedof exam
E · Applied Knowledge
Not publishedof exam
Quick Facts
- Assessment owner
- National Electrotechnical Training
- AM2 route
- Level 3 NVQ final unit
- Format
- Practical assessment and online MCQs
- AM2 Section E
- 30 questions · 60 min
- AM2S Section E
- 30 questions · 60 min
- AM2S v1 Section E
- 45 questions · 90 min
- AM2 assessed time
- 16 h 15 min
- AM2S assessed time
- 17 h 45 min
- AM2S v1 assessed time
- 19 h
- Passing requirement
- Pass each required section
- Section E references
- Four centre-supplied publications
Risk Assessment Scan
Find hazards, assess harm, control, record, review.
Hazard vs Risk
Hazard
- Source of possible harm
- Exposed live part
Risk
- Likelihood and severity
- Chance of shock during contact
Identify source, then assess harm
Risk Assessment
- Hazard
- Potential source of harm
- People at risk
- Who could be harmed and how
- Risk level
- Likelihood and severity of harm
- Elimination
- Remove the hazard where practicable
- PPE
- Personal protective equipment
- Assessment record
- Document hazards and controls
- Changed conditions
- Review controls
- AM2S v1 planning
- Sequence work before composite installation
- AM2 and AM2S A1
- 45 min each
- AM2S v1 A1
- 60 min including planning
Workplace Safety Rules
- Electricity at Work Regulations (GB)
- Statutory duties for electrical safety
- Regulation 12
- Cut off supply and isolate
- Regulation 13
- Prevent inadvertent re-energisation
- Regulation 14
- Restricts work on/near live conductors
- Regulation 16
- Technical knowledge, experience or appropriate supervision
- PUWER (GB)
- Suitable and maintained work equipment
- RIDDOR (GB)
- Report specified work-related incidents
Earthing vs Bonding
Protective earthing
- Connects exposed conductive parts to earth
- Provides earth fault current path
Protective bonding
- Links relevant conductive parts
- Limits touch voltage differences
Fault path vs potential difference
Composite Circuits
- AM2 installation
- A2–A5 · 8 h 30 min
- AM2S installation
- A2–A6 · 10 h
- AM2S v1 installation
- A2–A6 · 10 h 30 min
- TP&N distribution board
- Three phases and neutral
- A2
- Lighting and ring final circuits
- A3
- Three-phase circuits
- A4
- Central heating control circuit
- A5
- Main bonding, safety and data circuits
- A6 on AM2S routes
- Containment installation
Installation Checks
- Candidate specification
- Positions, dimensions and materials
- Schematic diagram
- Circuit logic and relationships
- Wiring diagram
- Physical connection and termination details
- Cable reference method
- Match actual installation conditions
- Rating factors
- Check grouping, temperature and insulation
- Voltage drop
- Check design current and length
- Termination
- Check security and exposed copper
- Functional checks
- Verify specified sequence of operation
Protection Functions
- Fuse
- Overcurrent protection by melting element
- Circuit-breaker
- Trips on overcurrent
- RCD
- Residual current device
- RCCB
- Residual current protection only
- RCBO
- Residual current plus overcurrent protection
- CPC
- Circuit protective conductor
- Main protective bonding
- Limits potential differences between parts
Ze vs Zs
Ze
- External to installation
- Referenced at installation origin
Zs
- Complete earth fault loop
- Includes circuit line and CPC
External loop vs complete loop
Verification Test Picker
- Check protective conductor path→Protective continuity test(Dead test)
- Check ring conductor end-to-end paths→Ring final continuity tests(Dead tests)
- Check insulation between conductors→Insulation resistance test(Consider sensitive equipment)
- Confirm correct line connections→Dead polarity check(Before energising)
- Confirm polyphase terminal order→Phase sequence check(Inspect connections while dead)
- Check fault loop for disconnection→Verify earth fault loop impedance(Use applicable device limit)
- Check fault current at supply→Verify prospective fault current(Compare against equipment rating)
- Confirm RCD effectiveness→Verify RCD operating time(Use applicable device criterion)
Dead Test Purposes
- Visual inspection
- Check installation before testing
- Protective continuity
- Check CPC and bonding paths
- Ring final continuity
- Check line, neutral and CPC
- r₁
- Ring line end-to-end resistance
- rₙ
- Ring neutral end-to-end resistance
- r₂
- Ring CPC end-to-end resistance
- Insulation resistance
- Check separation between conductors
- Dead polarity
- Check correct line connections
- Phase sequence
- Verify phase order at terminations
Phase Sequence vs Phase Rotation
Phase sequence
- Check terminal order
- Dead inspection of connections
Phase rotation
- Check rotating field direction
- Live check with suitable instrument
Terminal order vs rotating field
Live Verification and Results
- Ze
- External earth fault loop impedance
- Zs
- Total earth fault loop impedance
- R₁ + R₂
- Line plus CPC resistance
- Zs estimate
- Ze + (R₁ + R₂)
- PFC
- Prospective fault current
- PSCC
- Prospective short-circuit current
- PEFC
- Prospective earth fault current
- PFC for certificate
- Greater of PSCC and PEFC
- RCD effectiveness
- Verify operating time for device
- Phase rotation
- Check rotating field direction
Certificate vs Condition Report
Electrical Installation Certificate
- Initial verification of installation work
- Include inspection and test schedules
Electrical Installation Condition Report
- Periodic assessment of existing installation
- Records condition and observed defects
Initial certification vs periodic reporting
Verification Records
- Electrical Installation Certificate
- Record initial verification
- Schedule of Inspections
- Record visual inspection outcomes
- Schedule of Circuit Details
- Record conductor and device details
- Schedule of Test Results
- Record readings by circuit
- Measured Zs
- Compare with applicable maximum
- Sensitive equipment
- Protect before insulation resistance testing
- Functional testing
- Confirm intended operation
- Section B time
- 3 h 30 min
- Assessment live tests
- Under assessor supervision
Prove Dead
Identify, tell, isolate, lock, warn, prove, test, re-prove.
Isolation vs Functional Switching
Safe isolation
- Disconnect relevant supply sources
- Secure isolation and prove dead
Functional switching
- Control equipment during normal operation
- May leave parts energised
Secure for work vs control
Isolation Equipment
- Two-pole voltage indicator
- Check absence of voltage
- Proving unit
- Verify indicator before and after
- GS38
- HSE guidance on test equipment
- Lock-off device
- Secure relevant points of isolation
- Warning notice
- Warn against reconnection
- Multiple supplies
- Identify every source affecting work
- Failed re-prove
- Repeat with verified equipment
- Prove dead
- Check at point of work
Section C Scenarios
- Single-phase equipment
- Isolate equipment's circuit
- Three-phase equipment
- Isolate equipment's circuit
- Both replacement scenarios
- Leave other circuits energised
- Fault diagnosis bay
- Isolate its distribution board
- Available time
- 30 min for Section C
- Single-phase conductor pairs
- L–N, L–E and N–E
- Three-phase with neutral
- Check all 10 conductor pairs
Type, Place, Fix, Prove
Type, place, fix, prove.
Open vs High Resistance
Open circuit
- Intended path interrupted
- Continuity absent across break
High resistance
- Intended path still conducts
- Resistance above expected value
Broken path vs impaired path
Fault Evidence Picker
- Expected path shows a break→Investigate open circuit(Trace isolated circuit in sections)
- Unintended low-resistance connection→Investigate short circuit(Compare against drawing)
- Excess resistance along intended path→Investigate high resistance(Check connections and components)
- Connection disagrees with drawing→Investigate misconnection(Trace conductor endpoints)
- Fault narrowed to a section→Name the actual endpoints(Or identify the component)
- Proposing a repair→Specify relevant verification tests(Demonstrate the fault is cleared)
Fault Signatures
- Open circuit
- Break in intended conducting path
- Short circuit
- Unintended low-impedance path
- High resistance
- Excess resistance in intended path
- Misconnection
- Conductor at unintended terminal
- Loose termination
- Possible high-resistance fault
- Unexpected continuity
- Check against drawing for misconnections
Fault Report
- Starting point
- Given symptoms and circuit drawing
- Fault type
- Classify from evidence
- Fault location
- Name two points or component
- Rectification
- Specify what needs correcting
- Verification
- Specify checks proving the repair
- Available time
- 2 h for Section D
AM2S vs AM2S v1
AM2S
- Registered before September 2023
- 30 questions in 60 min
AM2S v1
- Registered from September 2023
- 45 questions in 90 min
Use your apprenticeship registration date
Section E Reference Picker
- Need wiring requirement→BS 7671
- Need test method→IET Guidance Note 3
- Need practical wiring guidance→IET On-Site Guide
- Need building regulation context→Electrician’s Guide to Building Regulations
- Sizing for current or voltage drop→BS 7671 Appendix 4
- Need certificate or schedule model→BS 7671 Appendix 6
- Unsure which AM2S version→Confirm with training provider
Section E Topics
- All routes · Safety
- Apply health and safety requirements
- All routes · BS 7671
- Apply Wiring Regulations
- All routes · Buildings
- Apply relevant Building Regulations
- AM2S v1 · Verification
- Inspection and testing
- AM2S v1 · Installation
- Installation practices
- AM2S v1 · Faults
- Diagnosis and rectification
- AM2S v1 · Design
- Design and planning
- AM2S v1 · Behaviours
- Customer service and professional conduct
Supplied References
- BS 7671
- Requirements for electrical installations
- IET Guidance Note 3
- Inspection and testing methods
- IET On-Site Guide
- Practical Wiring Regulations reference
- Electrician’s Guide to Building Regulations
- Building rules affecting electrical work
- Current BS 7671 edition
- 2018+A4:2026 · Orange Book
Part P in England
- Part P scope
- Electrical safety in dwellings
- New circuit
- Notifiable in England
- Replacement consumer unit
- Notifiable in England
- Existing circuit in special location
- Additions or alterations are notifiable
- Bath or shower special location
- Defined space around bath or shower
- Other special locations
- Swimming pool or sauna heater rooms
- Registered competent person
- Can self-certify applicable work
- Working in Wales
- Check Welsh Approved Document P
Common Traps
Isolation evidence
Lock-off secures isolation ≠ Voltage check proves dead
Ring resistance notation
r₁ measures ring line end-to-end ≠ R₁ measures line path resistance
Protective device function
RCCB responds to residual current ≠ RCBO also protects against overcurrent
Fault verification
Fault location identifies the defect ≠ Retesting verifies the repair
Certification and notification
Installation certificate records verification ≠ Building control notification follows regulations
Supply with multiple sources
One supply disconnected ≠ Every relevant supply isolated
Assessment scope
Section E tests applied knowledge ≠ Practical sections demonstrate competence
Last Minute
- 1.Confirm your AM2 variant before revision
- 2.Practise using the four supplied references
- 3.Identify every supply before isolation
- 4.Prove the indicator before and after
- 5.Inspect the installation before testing
- 6.Check ring line, neutral and CPC
- 7.Check maximum earth fault loop impedance
- 8.Record verification results by circuit
- 9.State fault location, fix and verification
- 10.Check England's Part P notification triggers