100+ Free C&G 2922-34 Solar PV Practice Questions
Pass your City & Guilds 2922-34 Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic (PV) Systems exam on the first try — instant access, no signup required.
Loading practice questions...
Explore More UK Construction & Electrotechnical Trades
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: C&G 2922-34 Solar PV Exam
30 questions
The unit 301 online knowledge test has about 30 multiple-choice questions
City & Guilds 2922-34 qualification handbook
About 60 minutes
Typical time allowed for the 2922-34 online knowledge test
City & Guilds 2922-34 assessment information
Around 75%
Common e-volve pass standard for the 2922-34 knowledge test
City & Guilds e-volve assessment
Level 3 plus 18th Edition
Entry requires a Level 3 electrotechnical qualification and 18th Edition, or an ECS Gold Card
City & Guilds 2922-34 entry requirements
Section 712
BS 7671 Section 712 sets the special requirements for solar PV power supply systems
BS 7671:2018+A2:2022 IET Wiring Regulations
16 A per phase
G98 applies up to 16 A per phase; above this G99 applies and needs DNO approval first
Energy Networks Association EREC G98/G99
LO4 = 53%
Design and installation considerations is the most heavily weighted knowledge-test outcome
City & Guilds 2922-34 test specification
100
Free original practice questions in this bank
OpenExamPrep
City & Guilds 2922-34 is a Level 3 Award that qualifies competent electricians to install and maintain small solar PV systems and progress toward MCS registration. Assessment is an online multiple-choice knowledge test of about 30 questions (unit 301, roughly 60 minutes, commonly around a 75 percent pass standard, open book) plus a separate practical assignment (unit 302). Entry requires an existing Level 3 electrotechnical qualification plus 18th Edition, or an equivalent ECS Gold Card, and learners must be 18 or over. The knowledge test is weighted toward design and installation considerations (LO4, 53 percent) and PV characteristics, components and architectures (LO3, 30 percent), with BS 7671 Section 712, the IET Code of Practice and MCS/G98/G99 requirements running throughout. This 100-question bank gives original practice across PV principles, components, electrical safety, design and siting, and commissioning, testing and maintenance.
Sample C&G 2922-34 Solar PV Practice Questions
Try these sample questions to test your C&G 2922-34 Solar PV exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1In a solar cell, what physical process converts sunlight directly into electrical energy?
2Solar irradiance at a site is normally expressed in which units?
3PV modules are rated at Standard Test Conditions (STC). Which set of values defines STC?
4On a module I-V curve, which point represents the condition where the module delivers its greatest power output?
5What happens to a crystalline silicon module's open-circuit voltage (Voc) as the cell temperature falls below 25 C?
6Three identical 12 V, 8 A PV modules are connected in series. What is the approximate output voltage and current of the string?
7Two PV strings, each producing 30 V at 9 A, are connected in parallel. What is the combined output?
8A roof has space for 10 PV modules each rated at 410 Wp. What is the nominal peak power (array rating) of the installation?
9What does the term 'peak power' or Wp of a PV module describe?
10Why is the current produced by a PV array described as direct current (DC) rather than alternating current (AC)?
About the C&G 2922-34 Solar PV Exam
The City & Guilds 2922-34 Level 3 Award is a specialist CPD qualification that lets already-qualified electricians install and maintain small solar photovoltaic (PV) systems in domestic and small commercial settings and work toward Microgeneration Certification Scheme (MCS) registration. It is assessed by an online (e-volve) multiple-choice knowledge test (unit 301) plus a practical assignment (unit 302). The syllabus aligns with BS 7671 (the 18th Edition IET Wiring Regulations, including Section 712 for solar PV) and the IET Code of Practice for Grid-Connected Solar Photovoltaic Systems, and covers PV principles, components, system design and siting, electrical safety, MCS requirements, G98/G99 DNO notification and commissioning, testing and maintenance.
Assessment
Two parts: unit 301 online multiple-choice knowledge test (about 30 questions on the City & Guilds e-volve platform) and unit 302 centre-assessed practical assignment. Knowledge-test outcomes are weighted LO1-LO2 PV/EESS introduction 7%, LO3 characteristics/components/architectures 30%, LO4 design and installation considerations 53% and LO6 microgeneration/EESS prosumer 10%.
Time Limit
The online knowledge test is typically about 60 minutes; the practical assignment is timed separately within the course.
Passing Score
Graded pass/fail. The online knowledge test is marked against the City & Guilds e-volve pass standard for unit 301 (commonly around 75 percent), and the practical assignment must also be passed.
Exam Fee
Registration fees are set by approved centres; the typical instructor-led course including assessment is around GBP 500-GBP 1,200 depending on the provider. (City & Guilds)
C&G 2922-34 Solar PV Exam Content Outline
PV principles, EESS introduction and operating theory
Practice on the photovoltaic effect, irradiance and its units, cell-module-array hierarchy, the I-V and power curves, DC versus AC, temperature effects on voltage, and an introduction to electrical energy storage systems (EESS).
PV systems, components and architectures
Practice on PV modules and ratings, string and micro inverters, power optimisers, mounting and racking systems, DC and AC cabling and connectors (such as MC4), DC and AC isolators, generation metering and overall system architectures including AC-coupled and DC-coupled storage.
Design, siting and installation considerations
Practice on orientation, tilt and shading analysis, irradiance and yield estimation, roof structure and wind/snow loading, BS 7671 Section 712 requirements, DC isolation, earthing, bonding and surge protection, working at height and roof safety, and commissioning, inspection, testing and documentation to the IET Code of Practice and IEC 62446-1.
Microgeneration and prosumer EESS integration
Practice on MCS requirements and MIS 3002, DNO notification under EREC G98 and G99 and the 16 A per phase threshold, integration of battery storage and self-consumption, and the documentation a prosumer installation must provide.
How to Pass the C&G 2922-34 Solar PV Exam
What You Need to Know
- Passing score: Graded pass/fail. The online knowledge test is marked against the City & Guilds e-volve pass standard for unit 301 (commonly around 75 percent), and the practical assignment must also be passed.
- Assessment: Two parts: unit 301 online multiple-choice knowledge test (about 30 questions on the City & Guilds e-volve platform) and unit 302 centre-assessed practical assignment. Knowledge-test outcomes are weighted LO1-LO2 PV/EESS introduction 7%, LO3 characteristics/components/architectures 30%, LO4 design and installation considerations 53% and LO6 microgeneration/EESS prosumer 10%.
- Time limit: The online knowledge test is typically about 60 minutes; the practical assignment is timed separately within the course.
- Exam fee: Registration fees are set by approved centres; the typical instructor-led course including assessment is around GBP 500-GBP 1,200 depending on the provider.
Keys to Passing
- Complete 500+ practice questions
- Score 80%+ consistently before scheduling
- Focus on highest-weighted sections
- Use our AI tutor for tough concepts
C&G 2922-34 Solar PV Study Tips from Top Performers
Frequently Asked Questions
How is the City & Guilds 2922-34 qualification assessed?
There are two parts: an online (e-volve) multiple-choice knowledge test (unit 301) of about 30 questions, and a centre-assessed practical assignment (unit 302). Both must be passed and the qualification is graded pass/fail.
How many questions are on the 2922-34 knowledge test and how long is it?
The online knowledge test has approximately 30 multiple-choice questions and typically lasts about 60 minutes. It is open book, so candidates can refer to BS 7671 and the IET Code of Practice.
What pass mark do I need?
The knowledge test is graded pass/fail against the City & Guilds e-volve pass standard for unit 301, which is commonly around 75 percent. The practical assignment must also be passed separately.
What are the entry requirements for 2922-34?
You must already hold a Level 3 electrotechnical qualification (such as C&G 2357 or 5357) plus an 18th Edition (BS 7671) qualification, or an equivalent ECS Gold Card, and be aged 18 or over. It is a specialist CPD award, not an entry-level course.
Which standards does the 2922-34 syllabus cover?
It covers BS 7671 (the 18th Edition IET Wiring Regulations, especially Section 712 for solar PV), the IET Code of Practice for Grid-Connected Solar Photovoltaic Systems, MCS requirements (including MIS 3002), and G98/G99 DNO notification.
Does passing 2922-34 make me MCS certified?
No. The qualification demonstrates the competence required for MCS, but MCS certification is a separate process applied for through an MCS certification body, usually alongside membership of a Competent Person Scheme.