Hazard + Risk Control
36-37%of exam
Emergency + Incident Response
19-20%of exam
Programs + Sustainment
22-23%of exam
Leadership + Training
21%of exam
Quick Facts
- Exam
- CHST
- Credential
- Construction Safety Technician
- Owner
- BCSP
- Questions
- 200 MCQ
- Time
- 4 hours
- Delivery
- Pearson VUE
- Eligibility
- 3 years construction SHE
- Duty Rule
- 35% technical SHE
- Scoring
- Criterion-referenced
- Beta
- Roughly 12%
Control Ladder
E-S-E-A-P: remove before protect
Elimination vs PPE
Elimination
- Remove hazard
- Most effective
- Design out
PPE
- Protect worker
- Least effective
- Last layer
Remove before protect
JHA Flow
- New task→Break steps
- Each step→Identify hazards
- Hazard found→Rate risk
- High risk→Eliminate first
- Cannot eliminate→Substitute/engineer
- Residual risk→Admin + PPE
- Controls set→Train crew
- Work changes→Revise JHA
Hazard Controls
- Elimination
- Remove hazard
- Substitution
- Safer alternative
- Engineering
- Isolate people
- Administrative
- Change work
- PPE
- Protect worker
- JHA
- Task hazard control
- Risk
- Severity x likelihood
- Corrective action
- Prioritized risk reduction
JHA vs Inspection
JHA
- Before task
- Step hazards
- Planned controls
Inspection
- During work
- Field conditions
- Correct deviations
Plan vs verify
Construction Hazards
- Hot work
- Fire watch
- Electrical
- Shock arc control
- Excavation
- Cave-in control
- Heights
- Fall prevention
- Confined space
- Entry controls
- Struck-by
- Line-of-fire
- Caught-between
- Crush points
- Rigging
- Load control
- Cranes
- Lift planning
- Concrete
- Formwork hazards
Scaffold vs General Fall
Scaffold
- 10 ft trigger
- Subpart L
- Platform rules
General fall
- 6 ft trigger
- Subpart M
- Walking surfaces
Read surface type
Health Hazards
- Asbestos
- Fiber exposure
- Lead
- Heavy metal
- Noise
- Dose control
- Silica
- Respirable dust
- Chemicals
- SDS + label
- GHS
- Hazard communication
- Heat
- Extreme climate
- Vibration
- Impact exposure
- Biological
- Pathogen controls
OSHA Numbers
- Construction falls
- 6 ft
- Scaffold falls
- 10 ft
- Excavation protection
- 5 ft
- Excavation design
- >20 ft RPE
- PFAS freefall
- 6 ft max
- Positioning freefall
- 2 ft max
- Scaffold capacity
- 4x intended load
- Wall opening
- 39 in trigger
Incident Loop
Stabilize, notify, investigate, correct, verify
ICS vs EAP
ICS
- Command system
- Active incident
- Responder coordination
EAP
- Site plan
- Before event
- Roles procedures
Command vs plan
Emergency Picker
- Before event→EAP(Plan roles)
- Fire risk→Prevention(Remove fuel)
- Active event→ICS(Command)
- Medical need→First aid(Immediate care)
- Blood exposure→Universal precautions
- External help→Emergency services
- Practice needed→Exercise(Evaluate)
- After control→Resume operations
Emergency Response
- EAP
- Site emergency plan
- Fire prevention
- Ignition fuel control
- ICS
- Command structure
- Crisis management
- Stabilize event
- Equipment
- Ready response tools
- First aid
- Immediate care
- Universal precautions
- Bloodborne protection
- Exercises
- Drill evaluate improve
Incident Response
- Mitigation
- Control consequences
- Notification
- Established communication
- Emergency services
- Call when required
- Coordination
- Align responders
- Stabilization
- Stop worsening
- Resumption
- Return operations
- Investigation
- Determine causation
- Follow-up
- Verify corrective actions
Blueprint Order
Hazards first; programs and leadership close
Inspection vs Audit
Inspection
- Worksite condition
- Immediate hazards
- Field correction
Audit
- Program system
- Conformance evidence
- Management review
Condition vs system
Program Picker
- Site starts→SSSP
- Regulatory question→Applicable standard
- Equipment question→Manufacturer manual
- Find conditions→Inspection
- Check system→Audit
- Incident occurs→Investigation
- Repeated losses→Trend analysis
- Action assigned→Track closure
Eligibility
- Work type
- Construction safety
- Experience
- 3 years minimum
- Duty share
- 35% SHE minimum
- Education
- No degree listed
- Application
- $140
- Exam
- $300
- Combo
- $426
- Renewal
- $145
Test Day
ID, rules, ethics, tutorial, exam
Root Cause vs Blame
Root cause
- System weakness
- Fix process
- Prevent recurrence
Blame
- Person focus
- Stops learning
- Weak prevention
System before person
Exam Rules
- Format
- Four options
- Answer
- One best answer
- Clock
- 4 hours
- Calculator
- On-screen TI-30XS
- Formula sheet
- Not permitted
- Beta items
- Unscored, hidden
- Retake
- 6 weeks minimum
- Approval
- One-year window
Program Systems
- Standards
- Applicable requirements
- SSSP
- Site-specific plan
- Inspection
- Field condition check
- Audit
- System conformance check
- Authority
- Roles responsibilities
- Manuals
- Manufacturer directions
- Risk management
- Identify assess control
- Means methods
- Construction execution
Investigation + Records
- Data gathering
- Facts before conclusions
- Documentation
- Objective evidence
- Recordkeeping
- Required retention
- Causation
- Contributing factors
- Root cause
- System weakness
- Trend
- Repeated pattern
- Report
- Post-incident summary
- Closure
- Action verified
Coach vs Enforce
Coach
- Improve behavior
- Explain risk
- Build buy-in
Enforce
- Stop danger
- Apply rules
- Document action
Influence then intervene
Training Picker
- New hazard→Task training
- Short reminder→Toolbox talk
- Complex equipment→Manufacturer input
- Unknown condition→SME consult
- Unsafe behavior→Coaching
- Imminent danger→Stop work
- Sensitive data→Confidential handling
- Wellbeing concern→TWH approach
Leadership + Training
- Delivery
- Training method
- Materials
- Instructional aids
- Motivation
- Behavior influence
- Communication
- Audience message channel
- SME
- Consult expert
- Confidentiality
- Need-to-know
- At-risk behavior
- Unsafe action
- TWH
- Total Worker Health
Common Traps
Fixed percent trap
No public cut score ≠ Criterion-referenced scoring
Formula sheet trap
Calculator provided ≠ Formula sheet banned
Beta item trap
Beta hidden ≠ Answer every item
Scaffold height trap
Scaffold is 10 ft ≠ General construction 6 ft
Inspection trap
Inspection finds conditions ≠ Audit tests systems
PPE trap
PPE is last ≠ Eliminate first
Investigation trap
Find system causes ≠ Avoid blame focus
Last Minute
- 1.Weights: 36.6 / 19.9 / 22.5 / 21
- 2.Eligibility: 3 years, 35% SHE
- 3.200 questions, 4 hours
- 4.One best answer
- 5.TI-30XS; no formula sheet
- 6.Roughly 12% beta
- 7.Retake wait: 6 weeks
- 8.Controls: E/S/E/A/P
- 9.JHA before work; inspect during
- 10.Scaffold 10 ft; general 6 ft
- 11.EAP plans; ICS commands
- 12.Root cause beats blame
Explore More BCSP Certifications
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
More From This Family
Videos and articles for deeper review.