10.3 Percentage, Profit-Loss (Kâr-Zarar), Mixture (Karışım) & Motion (Hareket) Problems
Key Takeaways
Set initial cost price (Maliyet) to 100x; successive percentage changes multiply factors (e.g., +30% markup then -20% discount yields 1.30 * 0.80 = 1.04, a 4% net profit).
When spoilage or shrinkage (Fire) reduces quantity from Q_initial to Q_remaining, total cost is invariant: Q_initial * P_initial = Q_remaining * P_new.
The Bowl Balance Equation (m_1 * c_1 + m_2 * c_2 = (m_1 + m_2) * c_final) solves every mixture problem; pure solute has c = 100%, pure water or evaporated water has c = 0%, and pouring out mixture leaves its concentration percentage unchanged.
Relative motion uses (v_1 + v_2) * t for opposite directions (approaching/separating) and |v_1 - v_2| * t for same-direction catch-up.
Average speed is Total Distance / Total Time; for an equal-distance round trip at speeds v_1 and v_2, average speed equals the harmonic mean 2v_1v_2 / (v_1 + v_2).
10.3 Percentage, Profit-Loss (Kâr-Zarar), Mixture (Karışım) & Motion (Hareket) Problems
The final pillar of TR-YÖS word problems unites Percentage and Profit-Loss (Yüzde ve Kâr-Zarar), Mixtures (Karışım), and Motion (Hareket / Hız). Each domain is governed by a conservation law: conservation of cost, conservation of pure solute mass, and conservation of relative displacement.
1. Percentage & Profit-Loss Problems (Yüzde ve Kâr-Zarar Problemleri)
Assigning Cost Price & Multiplicative Scaling
Whenever a problem applies percentages without stating an initial price, set the Cost Price (Maliyet / Alış Fiyatı) to :
- Selling Price (
Satış Fiyatı) with profit: . - Selling Price with loss relative to cost (
zarar): . - Profit or Loss Percentage (
Kâr / Zarar Yüzdesi): Unless explicitly stated otherwise, profit and loss percentages are always calculated relative to the Cost Price (Maliyet):
Successive Percentage Trap: Never add or subtract successive percentages! A markup above cost () followed by a discount off the label price (
etiket fiyatı) multiplies by : , resulting in a net profit (), never !
Batch-Price Comparison (Adet-Fiyat Eşitleme)
When a merchant buys items for TL and sells items for TL, equalize the number of items to before computing profit percentage:
- For example, buying lemons for TL and selling lemons for TL: scale to lemons.
- Cost of lemons TL; revenue from lemons TL.
- Profit on TL cost is TL profit.
Spoilage, Shrinkage & Inflation (Fire, Çürüme ve Enflasyon)
- Spoilage / Shrinkage (
Fire / Çürüme): When a merchant buys quantity at unit price and loses a fraction to evaporation, breakage, or rot, the Total Cost (Toplam Maliyet) remains unchanged while the sellable quantity drops to :
For example, if wet soap loses of its weight upon drying (), the unit break-even cost becomes (a increase in unit cost).
2. Inflation & Real Purchasing Power (Enflasyon ve Alım Gücü): If annual inflation is and a worker's nominal salary increases by , the real purchasing power multiplier is:
2. Mixture Problems (Karışım Problemleri)
The Universal Bowl Balance Equation (Kutu / Kap Yöntemi)
Every homogeneous mixture problem is solved by equating the total mass of pure solute before and after mixing. If a mixture of mass with solute percentage is combined with a second mixture of mass with solute percentage :
Crucial Boundary Concentrations
When applying the Bowl Balance Equation, memorize four boundary rules:
- Adding pure solute (
saf tuz / şeker / alkol ekleme): Treat the added mass as a mixture with concentration . - Adding pure water (
saf su ekleme): Treat the added water as a mixture with concentration . - Evaporating water (
su buharlaştırma): Subtract the evaporated water mass from total mass with concentration :
- Pouring out part of a homogeneous mixture (
karışımdan bir miktar dökme): If of a salt solution is poured out or spilled, the remaining of liquid still has a salt concentration! Only its mass decreases.
3. Motion / Rate-Time-Distance Problems (Hareket / Hız Problemleri)
Fundamental Law, Relative Speed (Bağıl Hız) & Circular Tracks (Dairesel Pist)
The core equation is (). When two vehicles with speeds and move simultaneously:
- Opposite Directions (
Zıt Yönlü— approaching or separating): Their relative speed is the sum of their speeds:
- Same Direction (
Aynı Yönlü— faster vehicle chasing slower vehicle): Their relative speed is the difference of their speeds:
- Circular Track (
Dairesel Pist) of Circumference : If two runners start from the same point on a circular track of length , they first meet after when running in opposite directions, and the faster runner first laps (tur bindirme) the slower runner after when running in the same direction.
Average Speed (Ortalama Hız)
Average speed over a multi-stage journey is always total distance divided by total time:
For a round trip (or two equal-distance halves of a journey) at speeds and , is the Harmonic Mean (Harmonik Ortalama) of and :
Trains & Tunnels (Tren-Tünel) and Boats & Rivers (Akıntı Hızı)
- Trains & Tunnels: For a train of length to completely pass through a tunnel (or bridge) of length , the front of the train must travel the tunnel's length plus the train's own length:
(Unit conversion reminder: , so multiply by to get .)
2. Boats & Rivers (Nehir / Akıntı Problemleri): For a boat with still-water speed in a river with current speed ():
- Downstream (
Akıntıyla aynı yön): - Upstream (
Akıntıya karşı):
4. Reference Table of Profit, Mixture & Motion Equations
| Category | Scenario | Formula / Equation |
|---|---|---|
| Successive % | Markup then discount | |
Spoilage (Fire) | Weight drops from to | |
| Mixture Balance | Mix and | |
| Relative Motion | Opposite vs. Same direction | ; |
| Round-Trip | Outbound at , return at | |
| Train & Tunnel | Train exits tunnel |
5. Worked Examples
Worked Example 10.5: Multi-Step Mixture with Spillage & Evaporation
Problem: A tank contains of a salt solution. First, of the solution is poured out. Next, of a salt solution is added, and of water is evaporated by heating. What is the final salt percentage of the mixture?
Solution:
- Pouring out of the solution leaves of solution, still at concentration.
- Apply the Bowl Balance Equation with (), (), and evaporated water ():
- Compute both sides:
Worked Example 10.6: Circular Track & River Round-Trip Motion
Problem: A motorboat with a still-water speed of travels downstream and immediately returns upstream to its starting dock in a total of hours. What is the speed of the river current ?
Solution:
- Downstream speed is and upstream speed is .
- Set up the total time equation :
- Combine the fractions over the common denominator :
- Divide both sides by :
A discount is applied to the stated label or current price, which may differ from cost. The mixture equations assume homogeneous mixtures, a consistent concentration basis, and only the named component lost in evaporation. Motion formulas assume the stated constant rates and units. The harmonic and arithmetic means agree when the two speeds are equal.
Review the Method
Average speed is Total Distance / Total Time; for an equal-distance round trip at speeds v_1 and v_2, average speed equals the harmonic mean 2v_1v_2 / (v_1 + v_2).
A wholesaler buys fresh figs at 30 TL per kilogram. During drying, the figs lose 25% of their weight to moisture evaporation (fire). At what price per kilogram must the wholesaler sell the dried figs to achieve a 20% net profit on total cost?
45 TL
48 TL
50 TL
54 TL
A 400 g sugar solution has a 20% sugar concentration by mass. First, 1/4 of the mixture is poured out. Next, 80 g of a 50% sugar solution and 20 g of pure sugar are added to the remaining mixture. What is the final sugar concentration of the new mixture?
25%
28%
32%
30%
A driver travels from City A to City B at a constant speed of 60 km/h and immediately returns from City B to City A along the same route at a constant speed of 90 km/h. What is the driver's average speed for the entire round trip?
72 km/h
75 km/h
70 km/h
76 km/h
A train of length 240 m traveling at a constant speed of 72 km/h enters a tunnel and completely exits the tunnel in 45 seconds. What is the length of the tunnel in meters?
540 m
600 m
660 m
720 m
Sections you finish are checked off in the contents.