10.3 Percentage, Profit-Loss (Kâr-Zarar), Mixture (Karışım) & Motion (Hareket) Problems

Key Takeaways

  • Set initial cost price (Maliyet) to 100x; successive percentage changes multiply factors (e.g., +30% markup then -20% discount yields 1.30 * 0.80 = 1.04, a 4% net profit).

  • When spoilage or shrinkage (Fire) reduces quantity from Q_initial to Q_remaining, total cost is invariant: Q_initial * P_initial = Q_remaining * P_new.

  • The Bowl Balance Equation (m_1 * c_1 + m_2 * c_2 = (m_1 + m_2) * c_final) solves every mixture problem; pure solute has c = 100%, pure water or evaporated water has c = 0%, and pouring out mixture leaves its concentration percentage unchanged.

  • Relative motion uses (v_1 + v_2) * t for opposite directions (approaching/separating) and |v_1 - v_2| * t for same-direction catch-up.

  • Average speed is Total Distance / Total Time; for an equal-distance round trip at speeds v_1 and v_2, average speed equals the harmonic mean 2v_1v_2 / (v_1 + v_2).

Last updated: October 2026

10.3 Percentage, Profit-Loss (Kâr-Zarar), Mixture (Karışım) & Motion (Hareket) Problems

The final pillar of TR-YÖS word problems unites Percentage and Profit-Loss (Yüzde ve Kâr-Zarar), Mixtures (Karışım), and Motion (Hareket / Hız). Each domain is governed by a conservation law: conservation of cost, conservation of pure solute mass, and conservation of relative displacement.


1. Percentage & Profit-Loss Problems (Yüzde ve Kâr-Zarar Problemleri)

Assigning Cost Price =100x= 100x & Multiplicative Scaling

Whenever a problem applies percentages without stating an initial price, set the Cost Price (Maliyet / Alış Fiyatı) to C=100xC = 100x:

  • Selling Price (Satış Fiyatı) with p%p\% profit: SP=C⋅(1+p100)=100x+pxSP = C \cdot \left(1 + \frac{p}{100}\right) = 100x + px.
  • Selling Price with d%d\% loss relative to cost (zarar): SP=C⋅(1−d100)=100x−dxSP = C \cdot \left(1 - \frac{d}{100}\right) = 100x - dx.
  • Profit or Loss Percentage (Kâr / Zarar Yüzdesi): Unless explicitly stated otherwise, profit and loss percentages are always calculated relative to the Cost Price (Maliyet):
Profit %=Selling Price−Cost PriceCost Price×100%\text{Profit \%} = \frac{\text{Selling Price} - \text{Cost Price}}{\text{Cost Price}} \times 100\%

Successive Percentage Trap: Never add or subtract successive percentages! A 30%30\% markup above cost (100x→130x100x \to 130x) followed by a 20%20\% discount off the label price (etiket fiyatı) multiplies by 0.800.80: 130x×0.80=104x130x \times 0.80 = 104x, resulting in a 4%4\% net profit (1.30×0.80=1.041.30 \times 0.80 = 1.04), never 10%10\%!

Batch-Price Comparison (Adet-Fiyat Eşitleme)

When a merchant buys aa items for bb TL and sells cc items for dd TL, equalize the number of items to N=EKOK(a,c)N = \text{EKOK}(a, c) before computing profit percentage:

  • For example, buying 44 lemons for 1010 TL and selling 55 lemons for 1616 TL: scale to EKOK(4,5)=20\text{EKOK}(4, 5) = 20 lemons.
  • Cost of 2020 lemons =5×10=50= 5 \times 10 = 50 TL; revenue from 2020 lemons =4×16=64= 4 \times 16 = 64 TL.
  • Profit on 5050 TL cost is 1414 TL   ⟹  1450×100%=28%\implies \frac{14}{50} \times 100\% = 28\% profit.

Spoilage, Shrinkage & Inflation (Fire, Çürüme ve Enflasyon)

  1. Spoilage / Shrinkage (Fire / Çürüme): When a merchant buys quantity QinitialQ_{\text{initial}} at unit price PinitialP_{\text{initial}} and loses a fraction to evaporation, breakage, or rot, the Total Cost (Toplam Maliyet) remains unchanged while the sellable quantity drops to QremainingQ_{\text{remaining}}:
Qinitial⋅Pinitial=Qremaining⋅PnewQ_{\text{initial}} \cdot P_{\text{initial}} = Q_{\text{remaining}} \cdot P_{\text{new}}

For example, if wet soap loses 20%20\% of its weight upon drying (Qremaining=0.80QinitialQ_{\text{remaining}} = 0.80 Q_{\text{initial}}), the unit break-even cost becomes Pnew=Pinitial0.80=1.25PinitialP_{\text{new}} = \frac{P_{\text{initial}}}{0.80} = 1.25 P_{\text{initial}} (a 25%25\% increase in unit cost). 2. Inflation & Real Purchasing Power (Enflasyon ve Alım Gücü): If annual inflation is rinflationr_{\text{inflation}} and a worker's nominal salary increases by rsalaryr_{\text{salary}}, the real purchasing power multiplier is:

1+rreal=1+rsalary1+rinflation1 + r_{\text{real}} = \frac{1 + r_{\text{salary}}}{1 + r_{\text{inflation}}}

2. Mixture Problems (Karışım Problemleri)

The Universal Bowl Balance Equation (Kutu / Kap Yöntemi)

Every homogeneous mixture problem is solved by equating the total mass of pure solute before and after mixing. If a mixture of mass m1m_1 with solute percentage c1%c_1\% is combined with a second mixture of mass m2m_2 with solute percentage c2%c_2\%:

m1⋅c1+m2⋅c2=(m1+m2)⋅cfinalm_1 \cdot c_1 + m_2 \cdot c_2 = (m_1 + m_2) \cdot c_{\text{final}}

Crucial Boundary Concentrations

When applying the Bowl Balance Equation, memorize four boundary rules:

  1. Adding pure solute (saf tuz / şeker / alkol ekleme): Treat the added mass as a mixture with concentration c=100%c = 100\%.
  2. Adding pure water (saf su ekleme): Treat the added water as a mixture with concentration c=0%c = 0\%.
  3. Evaporating water (su buharlaştırma): Subtract the evaporated water mass from total mass with concentration c=0%c = 0\%:
m1⋅c1−mevap⋅0=(m1−mevap)⋅cfinal  ⟹  m1⋅c1=(m1−mevap)⋅cfinalm_1 \cdot c_1 - m_{\text{evap}} \cdot 0 = (m_1 - m_{\text{evap}}) \cdot c_{\text{final}} \implies m_1 \cdot c_1 = (m_1 - m_{\text{evap}}) \cdot c_{\text{final}}
  1. Pouring out part of a homogeneous mixture (karışımdan bir miktar dökme): If 1k\frac{1}{k} of a 30%30\% salt solution is poured out or spilled, the remaining (1−1k)m1\left(1 - \frac{1}{k}\right)m_1 of liquid still has a 30%30\% salt concentration! Only its mass decreases.

3. Motion / Rate-Time-Distance Problems (Hareket / Hız Problemleri)

Fundamental Law, Relative Speed (Bağıl Hız) & Circular Tracks (Dairesel Pist)

The core equation is Distance=Speed×Time\text{Distance} = \text{Speed} \times \text{Time} (x=v⋅tx = v \cdot t). When two vehicles with speeds v1v_1 and v2v_2 move simultaneously:

  • Opposite Directions (Zıt Yönlü — approaching or separating): Their relative speed is the sum of their speeds:
Δx=(v1+v2)⋅t\Delta x = (v_1 + v_2) \cdot t
  • Same Direction (Aynı Yönlü — faster vehicle chasing slower vehicle): Their relative speed is the difference of their speeds:
Δx=∣v1−v2∣⋅t\Delta x = \lvert v_1 - v_2\rvert \cdot t
  • Circular Track (Dairesel Pist) of Circumference CC: If two runners start from the same point on a circular track of length CC, they first meet after t=Cv1+v2t = \frac{C}{v_1 + v_2} when running in opposite directions, and the faster runner first laps (tur bindirme) the slower runner after t=C∣v1−v2∣t = \frac{C}{\lvert v_1 - v_2\rvert} when running in the same direction.

Average Speed (Ortalama Hız)

Average speed over a multi-stage journey is always total distance divided by total time:

Vavg=Total DistanceTotal Time=x1+x2+…t1+t2+…V_{\text{avg}} = \frac{\text{Total Distance}}{\text{Total Time}} = \frac{x_1 + x_2 + \dots}{t_1 + t_2 + \dots}

For a round trip (or two equal-distance halves of a journey) at speeds v1v_1 and v2v_2, VavgV_{\text{avg}} is the Harmonic Mean (Harmonik Ortalama) of v1v_1 and v2v_2:

Vavg=2v1v2v1+v2(NEVER v1+v22!)V_{\text{avg}} = \frac{2v_1 v_2}{v_1 + v_2} \quad \left(\text{NEVER } \frac{v_1 + v_2}{2}!\right)

Trains & Tunnels (Tren-Tünel) and Boats & Rivers (Akıntı Hızı)

  1. Trains & Tunnels: For a train of length LtrainL_{\text{train}} to completely pass through a tunnel (or bridge) of length LtunnelL_{\text{tunnel}}, the front of the train must travel the tunnel's length plus the train's own length:
Ltrain+Ltunnel=vtrain⋅tL_{\text{train}} + L_{\text{tunnel}} = v_{\text{train}} \cdot t

(Unit conversion reminder: 1 m/s=3.6 km/h1\text{ m/s} = 3.6\text{ km/h}, so multiply km/h\text{km/h} by 518\frac{5}{18} to get m/s\text{m/s}.) 2. Boats & Rivers (Nehir / Akıntı Problemleri): For a boat with still-water speed vbv_b in a river with current speed vcv_c (vb>vcv_b > v_c):

  • Downstream (Akıntıyla aynı yön): xdown=(vb+vc)⋅tdownx_{\text{down}} = (v_b + v_c) \cdot t_{\text{down}}
  • Upstream (Akıntıya karşı): xup=(vb−vc)⋅tupx_{\text{up}} = (v_b - v_c) \cdot t_{\text{up}}

4. Reference Table of Profit, Mixture & Motion Equations

CategoryScenarioFormula / Equation
Successive %Markup +p%+p\% then discount −d%-d\%SP=C⋅(1+p100)(1−d100)SP = C \cdot \left(1 + \frac{p}{100}\right)\left(1 - \frac{d}{100}\right)
Spoilage (Fire)Weight drops from Q1Q_1 to Q2Q_2Q1⋅P1=Q2⋅P2Q_1 \cdot P_1 = Q_2 \cdot P_2
Mixture BalanceMix (m1,c1%)(m_1, c_1\%) and (m2,c2%)(m_2, c_2\%)m1c1+m2c2=(m1+m2)cfinalm_1 c_1 + m_2 c_2 = (m_1 + m_2) c_{\text{final}}
Relative MotionOpposite vs. Same directionΔxopp=(v1+v2)t\Delta x_{\text{opp}} = (v_1 + v_2)t; Δxsame=∣v1−v2∣t\Delta x_{\text{same}} = \lvert v_1 - v_2\rvert t
Round-Trip VavgV_{\text{avg}}Outbound at v1v_1, return at v2v_2Vavg=2v1v2v1+v2V_{\text{avg}} = \frac{2v_1 v_2}{v_1 + v_2}
Train & TunnelTrain LtrainL_{\text{train}} exits tunnel LtunnelL_{\text{tunnel}}Ltrain+Ltunnel=v⋅tL_{\text{train}} + L_{\text{tunnel}} = v \cdot t

5. Worked Examples

Worked Example 10.5: Multi-Step Mixture with Spillage & Evaporation

Problem: A tank contains 500 g500\text{ g} of a 30%30\% salt solution. First, 15\frac{1}{5} of the solution is poured out. Next, 150 g150\text{ g} of a 40%40\% salt solution is added, and 50 g50\text{ g} of water is evaporated by heating. What is the final salt percentage of the mixture?

Solution:

  1. Pouring out 15\frac{1}{5} of the 500 g500\text{ g} solution leaves 500−100=400 g500 - 100 = 400\text{ g} of solution, still at 30%30\% concentration.
  2. Apply the Bowl Balance Equation with m1=400 gm_1 = 400\text{ g} (c1=30%c_1 = 30\%), m2=150 gm_2 = 150\text{ g} (c2=40%c_2 = 40\%), and evaporated water m3=−50 gm_3 = -50\text{ g} (c3=0%c_3 = 0\%):
400(30)+150(40)−50(0)=(400+150−50)⋅cfinal400(30) + 150(40) - 50(0) = (400 + 150 - 50) \cdot c_{\text{final}}
  1. Compute both sides:
12,000+6,000=500⋅cfinal  ⟹  18,000=500⋅cfinal  ⟹  cfinal=36%12{,}000 + 6{,}000 = 500 \cdot c_{\text{final}} \implies 18{,}000 = 500 \cdot c_{\text{final}} \implies c_{\text{final}} = 36\%

Worked Example 10.6: Circular Track & River Round-Trip Motion

Problem: A motorboat with a still-water speed of vb=20 km/hv_b = 20\text{ km/h} travels 48 km48\text{ km} downstream and immediately returns 48 km48\text{ km} upstream to its starting dock in a total of 55 hours. What is the speed of the river current vcv_c?

Solution:

  1. Downstream speed is 20+vc20 + v_c and upstream speed is 20−vc20 - v_c.
  2. Set up the total time equation tdown+tup=5t_{\text{down}} + t_{\text{up}} = 5:
4820+vc+4820−vc=5\frac{48}{20 + v_c} + \frac{48}{20 - v_c} = 5
  1. Combine the fractions over the common denominator (20+vc)(20−vc)=400−vc2(20 + v_c)(20 - v_c) = 400 - v_c^2:
48(20−vc)+48(20+vc)400−vc2=5  ⟹  48⋅40400−vc2=5\frac{48(20 - v_c) + 48(20 + v_c)}{400 - v_c^2} = 5 \implies \frac{48 \cdot 40}{400 - v_c^2} = 5
  1. Divide both sides by 55:
400−vc2=48⋅8=384  ⟹  vc2=16  ⟹  vc=4 km/h400 - v_c^2 = 48 \cdot 8 = 384 \implies v_c^2 = 16 \implies v_c = 4\text{ km/h}

A discount is applied to the stated label or current price, which may differ from cost. The mixture equations assume homogeneous mixtures, a consistent concentration basis, and only the named component lost in evaporation. Motion formulas assume the stated constant rates and units. The harmonic and arithmetic means agree when the two speeds are equal.

Review the Method

Average speed is Total Distance / Total Time; for an equal-distance round trip at speeds v_1 and v_2, average speed equals the harmonic mean 2v_1v_2 / (v_1 + v_2).

Loading diagram...
Mixture & Motion Decision Flowchart
Test Your Knowledge

A wholesaler buys fresh figs at 30 TL per kilogram. During drying, the figs lose 25% of their weight to moisture evaporation (fire). At what price per kilogram must the wholesaler sell the dried figs to achieve a 20% net profit on total cost?

A

45 TL

B

48 TL

C

50 TL

D

54 TL

Test Your Knowledge

A 400 g sugar solution has a 20% sugar concentration by mass. First, 1/4 of the mixture is poured out. Next, 80 g of a 50% sugar solution and 20 g of pure sugar are added to the remaining mixture. What is the final sugar concentration of the new mixture?

A

25%

B

28%

C

32%

D

30%

Test Your Knowledge

A driver travels from City A to City B at a constant speed of 60 km/h and immediately returns from City B to City A along the same route at a constant speed of 90 km/h. What is the driver's average speed for the entire round trip?

A

72 km/h

B

75 km/h

C

70 km/h

D

76 km/h

Test Your Knowledge

A train of length 240 m traveling at a constant speed of 72 km/h enters a tunnel and completely exits the tunnel in 45 seconds. What is the length of the tunnel in meters?

A

540 m

B

600 m

C

660 m

D

720 m

Sections you finish are checked off in the contents.