All Practice Exams

100+ Free VA RFC QI Practice Questions

Prepare for the Virginia Recreational Facility Contracting Qualified Individual Examination exam with instant access — no signup required.

✓ No registration✓ No credit card✓ No hidden fees✓ Start practicing immediately
100+ Questions
100% Free

Loading practice questions...

2026 Statistics

Key Facts: VA RFC QI Exam

USD 85

PSI QI Specialty Fee

DPOR Board for Contractors / PSI Specialty CIB

Open Book

Book Policy

PSI Specialty CIB

RFC

Official Specialty Abbreviation

18VAC50-22-30

QI exam required

Technical Examination

DPOR A501-27EXINFO 09/01/2025

Virginia Recreational Facility Contracting Qualified Individual Examination is the official DPOR/PSI specialty exam for the RFC specialty (18VAC50-22-30). PSI fee is USD 85. Official item count is on the PSI specialty outline.

Sample VA RFC QI Practice Questions

Try these sample questions to test your VA RFC QI exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.

1Under 18VAC50-22-30, what work does Virginia's recreational facility contracting specialty (RFC) authorize?
A.Construction, repair, or improvement of any recreational facility, excluding paving and the construction of buildings, plumbing, electrical, and HVAC functions
B.Asphalt paving and sealcoating of tennis courts, running tracks, play areas, and parking lots
C.Construction of commercial and residential buildings that contain gymnasiums, including their electrical and plumbing systems
D.Installation of in-ground swimming pool circulation pumps, bonding grids, and HVAC dehumidifiers
Explanation: 18VAC50-22-30 defines recreational facility contracting (Abbr: RFC) as the service that provides for the construction, repair, or improvement of any recreational facility, excluding paving and the construction of buildings, plumbing, electrical, and HVAC functions. The CBC and H/H classifications also provide for this function.
2What official abbreviation does 18VAC50-22-30 assign to recreational facility contracting?
A.REC
B.RFC
C.RCF
D.POL
Explanation: The Board for Contractors regulation writes the specialty as "Recreational facility contracting" (Abbr: RFC). Candidates should match the three-letter code printed on a Virginia contractor license to this definition.
3Besides an RFC specialty, which Virginia license classifications also provide recreational facility contracting functions under 18VAC50-22-30?
A.ELE, PLB, and HVA only
B.RBC and HIC only
C.CBC and H/H
D.PAV and ROC only
Explanation: The RFC definition states that the CBC and H/H classifications also provide this function. A firm holding commercial building contractor or highway/heavy classification may perform recreational facility work without a separate RFC designation.
4A park owner wants a contractor to install and sealcoat a new asphalt tennis-court pavement. Why is that pavement work outside a stand-alone RFC specialty?
A.RFC covers only indoor gymnasiums
B.18VAC50-22-30 excludes paving from RFC; asphalt paving and sealcoating of tennis courts is the PAV specialty, and H/H also provides that function
C.Only the ELE classification may pave tennis courts
D.Paving is allowed under RFC if the contractor also paints the lines
Explanation: RFC expressly excludes paving. 18VAC50-22-30 defines asphalt paving and sealcoating contracting (PAV) to include asphalt paving or sealcoating on tennis courts, running tracks, and play areas. The H/H classification also provides the PAV function.
5Which functions does 18VAC50-22-30 expressly exclude from the RFC specialty?
A.Playground equipment installation and sports-field drainage
B.Bleacher assembly and chain-link fencing around courts
C.Paving and the construction of buildings, plumbing, electrical, and HVAC functions
D.Repair or improvement of an existing recreational facility
Explanation: The RFC definition excludes paving and the construction of buildings, plumbing, electrical, and HVAC functions. Construction, repair, or improvement of the recreational facility itself remains inside the specialty.
6An RFC contractor is hired to improve a community tennis facility. Which portion of the job is inside RFC, and which requires a different specialty or classification?
A.Applying a multi-coat acrylic color-finish system over an existing court is RFC; placing a new asphalt pavement course is PAV (or H/H), not RFC
B.Both the new asphalt pavement and the acrylic color finish are RFC because they are on a tennis court
C.Only the asphalt pavement is RFC; acrylic color finish requires an ELE license
D.Neither item is RFC; tennis courts may be built only under the ROC roofing specialty
Explanation: RFC is construction, repair, or improvement of a recreational facility but excludes paving. A color-finish system is recreational-surface improvement. New asphalt pavement or sealcoating on a tennis court is PAV work, and H/H also provides that function.
7How does 18VAC50-22-30 treat in-ground swimming pool construction relative to RFC?
A.In-ground pools are exclusive to POL; RFC may not perform that work
B.RFC is the only specialty that may build in-ground pools
C.POL is the swimming-pool specialty, and the CBC, RBC, and H/H classifications and the RFC specialty also provide that function
D.RFC may build pools only if it also installs the electrical bonding grid
Explanation: Swimming pool construction contracting (POL) is construction, repair, improvement, or removal of in-ground swimming pools. The regulation states that the CBC, RBC, and H/H classifications and the RFC specialty also provide for this function. No trade-related plumbing, electrical, backflow, or HVAC work is included in POL.
8Under 18VAC50-22-20, which classification's listed specialty functions include recreational facility contracting?
A.RBC only
B.CBC
C.ELE
D.SPR
Explanation: The commercial building contractor (CBC) classification includes recreational facility contracting among the specialty functions it carries out on commercial, institutional, governmental, and accessory-use buildings or structures. 18VAC50-22-30 separately states that CBC and H/H also provide the RFC function.
9How many years of RFC-classification experience must a Class C qualified individual have under 18VAC50-22-40?
A.Five years
B.Three years
C.One year
D.No experience if the firm posts a bond
Explanation: 18VAC50-22-40 requires the Class C qualified individual to have a minimum of one year of experience in the classification or specialty for which the individual is the qualifier, be at least 18, and be a full-time employee or a member of responsible management.
10A firm wants a Class A license with an RFC specialty. How many years of experience must the RFC qualified individual document under 18VAC50-22-60?
A.One year
B.Two years
C.Three years
D.Five years
Explanation: Class A qualified-individual experience is five years in the classification or specialty. Class B is three years and Class C is one year. The RFC specialty examination is the technical exam for that qualifier; Class A and B designated employees also take the business examination.

About the VA RFC QI Exam

The Virginia Recreational Facility Contracting Qualified Individual Examination is the official PSI technical examination for the RFC specialty. 18VAC50-22-30 defines the specialty as construction, repair, or improvement of any recreational facility, excluding paving and the construction of buildings, plumbing, electrical, and HVAC functions. The PSI specialty examination fee is USD 85. The examination is open book. Official scored item count, time, and passing score appear on the PSI specialty content outline. This bank is an English-language MCQ study adaptation. It does not replace required trade experience, pre-license education, board approval, or the official examination.

Assessment

Computer-based open-book multiple-choice Qualified Individual examination for the RFC specialty. Official 18VAC50-22-30 scope: construction, repair, or improvement of any recreational facility, excluding paving and the construction of buildings, plumbing, electrical, and HVAC functions.

Time Limit

120 minutes

Passing Score

70% (35 of 50 correct)

Exam Fee

USD 85 (PSI Services (for the Virginia Board for Contractors / DPOR))

VA RFC QI Exam Content Outline

study

RFC Scope

RFC Scope within the official RFC specialty definition

study

Courts and Playgrounds

Courts and Playgrounds within the official RFC specialty definition

study

Site Amenities

Site Amenities within the official RFC specialty definition

study

Drainage and Fencing

Drainage and Fencing within the official RFC specialty definition

study

Jobsite Safety

Jobsite Safety within the official RFC specialty definition

How to Pass the VA RFC QI Exam

What You Need to Know

  • Passing score: 70% (35 of 50 correct)
  • Assessment: Computer-based open-book multiple-choice Qualified Individual examination for the RFC specialty. Official 18VAC50-22-30 scope: construction, repair, or improvement of any recreational facility, excluding paving and the construction of buildings, plumbing, electrical, and HVAC functions.
  • Time limit: 120 minutes
  • Exam fee: USD 85

Keys to Passing

  • Work through all 100 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

VA RFC QI Study Tips from Top Performers

1Study the official 18VAC50-22-30 RFC specialty definition
2Use the PSI specialty content outline and listed references
3Permanent tabs are allowed in listed code books; study guides are not permitted in the PSI center
4This bank is an English-language MCQ study aid, not an official PSI form

Frequently Asked Questions

How many questions are on the Virginia RFC Qualified Individual exam?

The DPOR-approved PSI specialty content outline lists 50 scored questions, 120 minutes, and a minimum passing score of 70% (35 of 50 correct). PSI may also administer 5 to 10 unscored experimental items. Those numbers are published on the individual specialty content outline linked from the Contractor Specialty Examination CIB, not in the main bulletin.

How much does the Virginia RFC QI exam cost?

PSI charges USD 85 for a Qualified Individual specialty examination (DPOR Board for Contractors page and PSI Specialty CIB).

What work does a Virginia RFC specialty cover?

18VAC50-22-30 defines this specialty as construction, repair, or improvement of any recreational facility, excluding paving and the construction of buildings, plumbing, electrical, and HVAC functions.

Is this practice bank the official PSI exam?

No. This is an English-language multiple-choice study adaptation. It is not an official translation, format simulation, or substitute for the PSI examination or required field experience.