When a contractor will perform land-disturbing activity under a construction contract, who is responsible for preparing, submitting, and obtaining approval of the erosion and sediment control plan?
- AThe local building official, automatically, when the building permit is issued
- BThe excavation subcontractor only, because the prime contractor never disturbs land
- CThe owner
- DThe Board for Contractors as a condition of Class A licensure