A client wants a new illuminated monument sign and asks the BSC firm to pull a new 20-amp, 120-volt circuit from the building panel, through new underground conduit, to the sign. What is the correct scope decision?
- ABSC covers the new circuit because the sign will be permanently annexed to real property
- BBSC covers the new circuit if the run is shorter than 50 feet
- CBSC covers only the sign structure and a connection to an existing circuit; the new circu…
- DBSC covers the conduit and wire, but a master electrician must terminate only the breaker