ICC B2 Commercial Building Inspector Cheat Sheet

General Administration

6%of exam

PermitsPlan ReadingInspection RecordsOccupancy Approval

Building Planning

20%of exam

OccupancyConstruction TypeAccessibilityBuilding Size

Footings and Foundations

8%of exam

Bearing SoilsFooting DepthFoundation WallsPiles and Piers

Floor Construction

8%of exam

Spans and BearingConnectionsSubflooringConcrete Slabs

Wall Construction and Coverings

21%of exam

Wood and SteelMasonry and ConcreteReinforcementWeather Protection

Roof and Ceiling Construction

6%of exam

Roof AssembliesTruss BracingRoof CoveringsDrainage

Public Safety and Special Construction

31%of exam

Means of EgressFire ProtectionSafety GlazingOpening Protectives

Quick Facts

Exam
B2
Credential
Commercial Building Inspector
Items
80 multiple choice
Time
3.5 hours
Pass
75 scaled
Format
Open book
Fee
Check ICC checkout
Provider
PRONTO

Field Administration

Approved plans
Compare before approving cover
Field change
Submit revised documents for approval
Inspection records
Document location and correction
Stop work
See §115 for authority

Construction Types

Match type to materials

I/II: mostly noncombustibleIII: noncombustible exterior baselineIV: mass timberV: any permitted material

Fire Wall vs Barrier

Fire wall

  • Independent collapse
  • Table 706.4 rating
  • Separate building portions

Fire barrier

  • Separates building areas
  • Rating depends on use
  • Opening limits

Collapse vs separation

Occupancy Picker

  1. Office work→Group B(Business)
  2. Retail sales→Group M(Mercantile)
  3. Restaurant dining→Group A-2(Check small assembly exceptions)
  4. School K-12→Group E(Educational)
  5. Hospital care→Group I-2(Institutional)
  6. Warehouse storage→Group S(Storage)
  7. Factory process→Group F(Industrial)
  8. Materials exceed applicable MAQ→Group H(Check control areas and exceptions)

Occupancy Groups

Group A
Assembly gathering
Group B
Business offices
Group E
Educational K-12
Group F
Factory industrial
Group H
High-hazard materials
Group I
Institutional care
Group M
Mercantile retail
Group R
Residential dwelling

Major Occupancies

A assembly B business E education

A: assemblyB: business officeE: educationalM: mercantile retail

Type I vs Type V

Type I

  • Noncombustible
  • Highest ratings
  • High-rise use

Type V

  • Any permitted material
  • Check Table 601
  • Type V-A or V-B

Material and rating rules

Mixed Use

Accessory
Aggregate ≤10% of story area
Incidental
Protection per Table 509
Separated
Fire-rated division
Nonseparated
Check §508.3 scope and limits
Occupant load
Table 1004.5: net or gross
Mezzanine
Usually ≤⅓ room area
Special use
Chapter 4 provisions
Change of use
Trigger compliance review

Rated Separations

Match each wall to function

Wall: independent collapseBarrier: occupancy separationPartition: rated corridor or unit

Group B vs M

Group B

  • Office service
  • Professional work
  • Low hazard

Group M

  • Merchandise display
  • Retail sales
  • Public shopping

Office vs retail

Construction Types

Type I-A
3hr frame highest
Type I-B
2-hour primary frame
Type II-A
1hr protected noncomb
Type II-B
Unprotected noncombustible
Type III-A
Noncombustible exterior; check §602.3 exceptions
Type IV
Mass timber or noncombustible
Type V-A
Permitted materials; check Table 601
Type V-B
Zero-hour primary frame

Partition vs Barrier

Fire partition

  • Usually 1 hour
  • Corridors and unit separations
  • Check §708 exceptions

Fire barrier

  • Occupancy separation
  • Check §707 continuity
  • Rating depends on use

Tenant vs occupancy

Fire-Rated Assemblies

Fire wall
Resists collapse from either side
Fire barrier
Rating depends on required use
Fire partition
Usually 1 hour; exceptions apply
Shaft enclosure
2 hours if connecting 4+ stories
Opening protect
Rated door frame
Penetration
Firestop required
Table 601
Type ratings source
Table 508.4
Occupancy separation

Accessibility

A117.1
ICC accessibility standard
Accessible route
36 in indoors; 48 in outdoors
Ramp slope
1:12 maximum running slope
Clear floor space
New: 30 × 52 inches
Grab bars
Side rear toilet
Van parking
132 + 60 or 96 + 96
Permanent room signs
Tactile characters and braille
Interior nonrated swinging door
5 lbf opening force

Structural Loads

Live load
Occupancy Table 1607
Dead load
Permanent structure weight
Snow load
Ground pg by map
Wind load
Speed exposure height
Seismic
SDC risk category
Risk Category
Use Table 1604.5
ASCE 7
Referenced load standard
Special inspection
Chapter 17 triggers

Height Area + Admin

Table 504.3
Allowable height
Table 506.2
Allowable area
Unlimited area
Section 507 conditions
Permit
Work authorization
Inspection
Required hold points
CO
Occupancy approval
Stop work
See §115; check local procedure
Existing building
Check the adopted IEBC

Foundation Inspection

Bearing
Check approved soils and depth
Frost protection
Check §1809.5 methods
Foundation wall
Check steel and backfill limits
Deep foundation
Compare installation to approved design

Floor Inspection

Framing
Verify spans, bearing and connectors
Penetrations
Check boring and notching limits
Subfloor
Check grade, span and fastening
Slab placement
Check reinforcement before concrete

Wall Systems

Masonry
Check grout, mortar and reinforcement
Steel framing
Check approved markings and connections
Concrete wall
Check reinforcement and cover
Exterior covering
Check flashing and water-resistive barrier

Roof and Ceiling

Trusses
Check bearing, connections and bracing
Sheathing
Check thickness, span and fastening
Roof covering
Check slope and assembly classification
Drainage
Check roof drains and overflow

Egress Components

Access Exit Discharge public way

Access: to exitExit: to dischargeDischarge: to public way

Exit Access vs Exit

Exit access

  • Path to exit
  • Common path check
  • Travel distance

Exit

  • Enclosed stairway
  • Fire-rated path
  • Exit discharge

Find the exit boundary

Egress Picker

  1. Exits from one space→Table 1006.2.1(Load and common path)
  2. Exits from a story→Table 1006.3.3(Check §1006.3.4 for one exit)
  3. Story load 501–1,000→Three exits(Keep required capacity)
  4. Story load above 1,000→Four exits(Keep required capacity)
  5. A/E load 50+; latched→Panic or fire exit hardware(Check §1010.2.8 and exceptions)
  6. General corridor width→44 inches baseline(Check §1020.3 and capacity)
  7. General stair geometry→7-inch riser; 11-inch tread(Maximum riser; minimum tread)
  8. Required exit pair→½ diagonal baseline(⅓ with qualifying sprinklers)

Egress Core

Exit access
Path to exit door
Exit
Protected path to discharge
Exit discharge
Exit end to public way
Story exit count
Table 1006.3.3; single-exit exceptions
Common path
Travel before two distinct paths
Travel distance
Table 1017.2 limit
Remoteness
½ diagonal; ⅓ if qualified
Dead end
20 ft baseline; check exceptions

Height vs Area Increase

Height increase

  • Tables 504.3 and 504.4
  • Height and story limits
  • Match sprinkler designation

Area increase

  • Table 506.2 area factors
  • Separate §506.3 frontage
  • Match sprinkler designation

Vertical vs horizontal

Stairs + Doors

7/11 rule
Max 7 riser 11 tread
44 in corridor
OL 50 or more
32 in door
Min clear width
Handrail height
34-38 inches
Guard height
42 inches min
Panic hardware
Latched A/E exits serving 50+
Door swing
Egress direction for 50+ or H
Door landing
Wider of door or stair

Fire Systems

NFPA 13
Sprinkler standard
NFPA 72
Fire alarm standard
NFPA 14
Standpipe standard
Area factor
Table 506.2; §506.3 frontage
Height and stories
Tables 504.3 and 504.4
Smoke control
Pressurize exhaust
Fire pump
Adequate water pressure
Emergency lighting
90 min backup

Common Traps

B vs M occupancy

B = office work ≠ M = retail sales

Wall vs barrier

Wall = collapse rated ≠ Barrier = occupancy sep

Exit access vs exit

Access = open path ≠ Exit = protected enclosure

Height vs area

504.3: height table ≠ 506.2: area factors

Type I vs V

Type I mostly noncombustible ≠ Type V any permitted materials

Scaled Score

75 scaled ≠ No published raw cutoff

Last Minute

  1. 1.Largest domain: Public Safety 31%
  2. 2.Open book: practice with references
  3. 3.Passing score: 75 scaled
  4. 4.Room exits differ from story exits
  5. 5.Corridor: check width and capacity
  6. 6.General stair: 7/11 baseline
  7. 7.Use Table 601 and footnotes
  8. 8.Check height, stories and area separately
  9. 9.A117.1 gives technical accessibility criteria
  10. 10.Match rated separation to its function
Same family resources