General Administration
6%of exam
Building Planning
20%of exam
Footings and Foundations
8%of exam
Floor Construction
8%of exam
Wall Construction and Coverings
21%of exam
Roof and Ceiling Construction
6%of exam
Public Safety and Special Construction
31%of exam
Quick Facts
- Exam
- B2
- Credential
- Commercial Building Inspector
- Items
- 80 multiple choice
- Time
- 3.5 hours
- Pass
- 75 scaled
- Format
- Open book
- Fee
- Check ICC checkout
- Provider
- PRONTO
Field Administration
- Approved plans
- Compare before approving cover
- Field change
- Submit revised documents for approval
- Inspection records
- Document location and correction
- Stop work
- See §115 for authority
Construction Types
Match type to materials
Fire Wall vs Barrier
Fire wall
- Independent collapse
- Table 706.4 rating
- Separate building portions
Fire barrier
- Separates building areas
- Rating depends on use
- Opening limits
Collapse vs separation
Occupancy Picker
- Office work→Group B(Business)
- Retail sales→Group M(Mercantile)
- Restaurant dining→Group A-2(Check small assembly exceptions)
- School K-12→Group E(Educational)
- Hospital care→Group I-2(Institutional)
- Warehouse storage→Group S(Storage)
- Factory process→Group F(Industrial)
- Materials exceed applicable MAQ→Group H(Check control areas and exceptions)
Occupancy Groups
- Group A
- Assembly gathering
- Group B
- Business offices
- Group E
- Educational K-12
- Group F
- Factory industrial
- Group H
- High-hazard materials
- Group I
- Institutional care
- Group M
- Mercantile retail
- Group R
- Residential dwelling
Major Occupancies
A assembly B business E education
Type I vs Type V
Type I
- Noncombustible
- Highest ratings
- High-rise use
Type V
- Any permitted material
- Check Table 601
- Type V-A or V-B
Material and rating rules
Mixed Use
- Accessory
- Aggregate ≤10% of story area
- Incidental
- Protection per Table 509
- Separated
- Fire-rated division
- Nonseparated
- Check §508.3 scope and limits
- Occupant load
- Table 1004.5: net or gross
- Mezzanine
- Usually ≤⅓ room area
- Special use
- Chapter 4 provisions
- Change of use
- Trigger compliance review
Rated Separations
Match each wall to function
Group B vs M
Group B
- Office service
- Professional work
- Low hazard
Group M
- Merchandise display
- Retail sales
- Public shopping
Office vs retail
Construction Types
- Type I-A
- 3hr frame highest
- Type I-B
- 2-hour primary frame
- Type II-A
- 1hr protected noncomb
- Type II-B
- Unprotected noncombustible
- Type III-A
- Noncombustible exterior; check §602.3 exceptions
- Type IV
- Mass timber or noncombustible
- Type V-A
- Permitted materials; check Table 601
- Type V-B
- Zero-hour primary frame
Partition vs Barrier
Fire partition
- Usually 1 hour
- Corridors and unit separations
- Check §708 exceptions
Fire barrier
- Occupancy separation
- Check §707 continuity
- Rating depends on use
Tenant vs occupancy
Fire-Rated Assemblies
- Fire wall
- Resists collapse from either side
- Fire barrier
- Rating depends on required use
- Fire partition
- Usually 1 hour; exceptions apply
- Shaft enclosure
- 2 hours if connecting 4+ stories
- Opening protect
- Rated door frame
- Penetration
- Firestop required
- Table 601
- Type ratings source
- Table 508.4
- Occupancy separation
Accessibility
- A117.1
- ICC accessibility standard
- Accessible route
- 36 in indoors; 48 in outdoors
- Ramp slope
- 1:12 maximum running slope
- Clear floor space
- New: 30 × 52 inches
- Grab bars
- Side rear toilet
- Van parking
- 132 + 60 or 96 + 96
- Permanent room signs
- Tactile characters and braille
- Interior nonrated swinging door
- 5 lbf opening force
Structural Loads
- Live load
- Occupancy Table 1607
- Dead load
- Permanent structure weight
- Snow load
- Ground pg by map
- Wind load
- Speed exposure height
- Seismic
- SDC risk category
- Risk Category
- Use Table 1604.5
- ASCE 7
- Referenced load standard
- Special inspection
- Chapter 17 triggers
Height Area + Admin
- Table 504.3
- Allowable height
- Table 506.2
- Allowable area
- Unlimited area
- Section 507 conditions
- Permit
- Work authorization
- Inspection
- Required hold points
- CO
- Occupancy approval
- Stop work
- See §115; check local procedure
- Existing building
- Check the adopted IEBC
Foundation Inspection
- Bearing
- Check approved soils and depth
- Frost protection
- Check §1809.5 methods
- Foundation wall
- Check steel and backfill limits
- Deep foundation
- Compare installation to approved design
Floor Inspection
- Framing
- Verify spans, bearing and connectors
- Penetrations
- Check boring and notching limits
- Subfloor
- Check grade, span and fastening
- Slab placement
- Check reinforcement before concrete
Wall Systems
- Masonry
- Check grout, mortar and reinforcement
- Steel framing
- Check approved markings and connections
- Concrete wall
- Check reinforcement and cover
- Exterior covering
- Check flashing and water-resistive barrier
Roof and Ceiling
- Trusses
- Check bearing, connections and bracing
- Sheathing
- Check thickness, span and fastening
- Roof covering
- Check slope and assembly classification
- Drainage
- Check roof drains and overflow
Egress Components
Access Exit Discharge public way
Exit Access vs Exit
Exit access
- Path to exit
- Common path check
- Travel distance
Exit
- Enclosed stairway
- Fire-rated path
- Exit discharge
Find the exit boundary
Egress Picker
- Exits from one space→Table 1006.2.1(Load and common path)
- Exits from a story→Table 1006.3.3(Check §1006.3.4 for one exit)
- Story load 501–1,000→Three exits(Keep required capacity)
- Story load above 1,000→Four exits(Keep required capacity)
- A/E load 50+; latched→Panic or fire exit hardware(Check §1010.2.8 and exceptions)
- General corridor width→44 inches baseline(Check §1020.3 and capacity)
- General stair geometry→7-inch riser; 11-inch tread(Maximum riser; minimum tread)
- Required exit pair→½ diagonal baseline(⅓ with qualifying sprinklers)
Egress Core
- Exit access
- Path to exit door
- Exit
- Protected path to discharge
- Exit discharge
- Exit end to public way
- Story exit count
- Table 1006.3.3; single-exit exceptions
- Common path
- Travel before two distinct paths
- Travel distance
- Table 1017.2 limit
- Remoteness
- ½ diagonal; ⅓ if qualified
- Dead end
- 20 ft baseline; check exceptions
Height vs Area Increase
Height increase
- Tables 504.3 and 504.4
- Height and story limits
- Match sprinkler designation
Area increase
- Table 506.2 area factors
- Separate §506.3 frontage
- Match sprinkler designation
Vertical vs horizontal
Stairs + Doors
- 7/11 rule
- Max 7 riser 11 tread
- 44 in corridor
- OL 50 or more
- 32 in door
- Min clear width
- Handrail height
- 34-38 inches
- Guard height
- 42 inches min
- Panic hardware
- Latched A/E exits serving 50+
- Door swing
- Egress direction for 50+ or H
- Door landing
- Wider of door or stair
Fire Systems
- NFPA 13
- Sprinkler standard
- NFPA 72
- Fire alarm standard
- NFPA 14
- Standpipe standard
- Area factor
- Table 506.2; §506.3 frontage
- Height and stories
- Tables 504.3 and 504.4
- Smoke control
- Pressurize exhaust
- Fire pump
- Adequate water pressure
- Emergency lighting
- 90 min backup
Common Traps
B vs M occupancy
B = office work ≠ M = retail sales
Wall vs barrier
Wall = collapse rated ≠ Barrier = occupancy sep
Exit access vs exit
Access = open path ≠ Exit = protected enclosure
Height vs area
504.3: height table ≠ 506.2: area factors
Type I vs V
Type I mostly noncombustible ≠ Type V any permitted materials
Scaled Score
75 scaled ≠ No published raw cutoff
Last Minute
- 1.Largest domain: Public Safety 31%
- 2.Open book: practice with references
- 3.Passing score: 75 scaled
- 4.Room exits differ from story exits
- 5.Corridor: check width and capacity
- 6.General stair: 7/11 baseline
- 7.Use Table 601 and footnotes
- 8.Check height, stories and area separately
- 9.A117.1 gives technical accessibility criteria
- 10.Match rated separation to its function
Third-party resources · We may earn a commission from purchases.

ICC Commercial Building Inspector Exam Prep (B2): Study Guide with Code Navigation Strategies, Practice Questions, and Inspection Scenarios to Pass the ICC Building Inspector Certification
By Mike L Turner, Tom Brooks, Mike L Turner
Buy on Amazon
Explore More ICC Certifications
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
More From This Family
Videos and articles for deeper review.