7.1 Equipment and Plant Registers: Scaffolding, Ladders, and Portable Electrical Tools

Key Takeaways

  • Statutory registers mandated under the OHS Act and Construction Regulations 2014 serve as contemporaneous legal records demonstrating that plant, machinery, and temporary works are systematically inspected, maintained, and verified safe for use.
  • Scaffolding inspections under SANS 10085-1, incorporated by Construction Regulation 16(2) through section 44 of the OHS Act, must be executed before first use and at intervals not exceeding seven days, after inclement weather, following structural alterations, or after an incident, with inspection findings documented in the scaffold register and active status communicated via green 'Safe for Use' or red 'Unsafe / Do Not Use' tags.
  • General Safety Regulation 13A sets construction and use standards for ladders — sound material, non-skid feet or hooks or secure lashing, no nailed rungs, no damaged stiles or missing rungs, leaning ladders no longer than 9 m — but prescribes no inspection interval, so the monthly ladder register is a company control adopted to prove compliance, not a statutory frequency.
  • Construction Regulation 24(d) requires temporary electrical installations to be inspected at least once a week by an appointed competent person, while CR 24(e) requires the authorised operator to inspect electrical machinery daily before use against a checklist, verifying casing integrity, cord condition, industrial plug seals, earth continuity or double-insulation (Class II square-within-a-square symbol), and color-coded quarterly tagging.
  • Lifting tackle and machinery under Driven Machinery Regulation 18 require distinct statutory inspection tiers: lifting tackle examined at intervals not exceeding three months by a competent person appointed in writing (DMR 18(10)(e)); ropes, chains, hooks, sheaves, brakes and safety devices forming an integral part of a lifting machine examined at intervals not exceeding six months (DMR 18(6)); and a thorough examination and performance test of the whole installation at intervals not exceeding 12 months by a lifting machinery inspector of a lifting machinery entity (DMR 18(5)).
Last updated: September 2026

7.1 Equipment and Plant Registers: Scaffolding, Ladders, and Portable Electrical Tools

[!NOTE] SACPCMP Blueprint Focus: For the SACPCMP Construction Health and Safety Officer (CHSO) examination, candidates must master the statutory mechanics governing site registers, checklists, and equipment inspection logs. Under South African occupational health and safety jurisprudence, an unrecorded inspection legally equates to an inspection that never occurred. Statutory registers serve as contemporaneous documentary proof of due diligence under Section 8(2)(a) and Section 8(2)(d) of the Occupational Health and Safety Act (Act 85 of 1993).

On a construction site, mechanical wear, environmental exposure, heavy loading, and dynamic operational conditions rapidly degrade temporary works, access systems, and electrical machinery. To prevent catastrophic structural failures, electrocutions, and mechanical collapses, the Occupational Health and Safety Act 85 of 1993 (OHS Act) and its subordinate regulations mandate systematic inspection regimes. These inspections must be executed by formally appointed competent persons and logged in dedicated statutory registers retained in Divider 8 of the site Health and Safety File.


1. The Statutory Function and Evidentiary Value of Inspection Registers

Under Section 8(2)(a) of the OHS Act, an employer must provide and maintain plant, machinery, and systems of work that are safe and without risk to health. Section 8(2)(d) requires the employer to establish what precautionary measures must be taken. Statutory registers are the primary legal instrument through which the employer demonstrates compliance with these duties.

Legal Evidentiary Principles in South African Courts

If an equipment failure results in an injury or fatality, Department of Employment and Labour (DoEL) inspectors and statutory inquiry presiding officers evaluate the site registers against three evidentiary principles:

  1. Contemporaneous Recording: Entries must be made at the exact time the physical inspection occurs. Pre-signing registers for the upcoming week or completing inspection sheets retrospectively after an accident constitutes statutory fraud, forgery, and uttering under common law, invalidating the register as legal evidence.
  2. Defect Rectification Tracking: A register is not merely a tick-box formality. Where a defect is identified (such as a split ladder stile or damaged electrical cord), the register must record: the exact defect, the immediate stop-work/quarantine action taken, the repair work performed, the competent person who verified the repair, and the formal re-commissioning signature.
  3. Chain of Competency: The person inspecting the equipment must hold a valid, written legal appointment under the specific applicable regulation, accompanied by documented training certificates and proof of competence.

2. Scaffolding Inspection Registers (CR 16 & SANS 10085)

Access scaffolding on South African building sites is regulated under Construction Regulation 16 and the national technical standard SANS 10085-1: The design, erection, use and inspection of access scaffolding.

The Mandatory Appointment (CR 16(1))

Under Construction Regulation 16(1), a contractor must appoint in writing a competent person to supervise the erection, use, alteration, and dismantling of scaffolding, as well as a competent person to inspect scaffolding.

The Four Statutory Inspection Triggers (CR 16(1) & SANS 10085)

Scaffolding may never be treated as a permanent, static installation. A formal physical inspection and corresponding register entry are legally required at the following mandatory intervals:

+-------------------------------------------------------------------------------------------------+
|                        Scaffolding Statutory Inspection Triggers (CR 16)                        |
+-------------------------------------------------------------------------------------------------+
| 1. Baseline / Pre-Use  ───> Prior to initial commissioning and handover to work trades          |
| 2. Periodic Weekly     ───> At least once every 7 calendar days while erected on site            |
| 3. Post-Inclement Weather > Immediately following rain, storms, or gale-force winds (>40 km/h) |
| 4. Post-Modification   ───> Following any structural alteration, dismantling, or impact event    |
+-------------------------------------------------------------------------------------------------+

Core Engineering Inspection Criteria

The appointed scaffold inspector must conduct a physical hands-on inspection against SANS 10085 parameters, evaluating:

  • Foundation and Footings: Sole boards (minimum 225mm wide x 38mm thick) placed under base jacks on firm, compacted ground; no uncompacted fill, bricks, or scrap timber used as packing; base plates centrally positioned on jacks; no undermining from excavation slopes.
  • Vertical Standards and Horizontal Ledgers: Standards plumb within 1:500 tolerance; joints staggered; ledgers level and securely clamped at standard intersections; transoms spaced to properly support scaffold boards without excessive deflection.
  • Bracing Systems: Longitudinal (façade) bracing installed at an angle between 35° and 55° along the full height; ledger (cross) bracing installed on alternate bays; plan bracing installed where required to prevent racking and torsional twist.
  • Ties and Anchorages: Scaffolding securely tied into the permanent structure at minimum intervals: at least one tie per 20 m² of scaffold surface area, or vertically every 4 metres and horizontally every 8 metres. Positive mechanical ties (through-ties, box ties, or engineered anchor bolts into cured concrete) are mandatory. Wire ties and friction props are strictly prohibited.
  • Working Platforms: Decking boards fully boarded with no gaps exceeding 25mm; boards secured against wind uplift; overhang beyond transoms between 150mm and 250mm; damaged, split, or painted boards rejected.
  • Edge Protection and Access: Rigid guardrails comprising a top rail between 900mm and 1000mm, an intermediate rail between 450mm and 500mm, and a continuous solid toe-board at least 150mm high; internal access ladders tied off at 75 degrees with self-closing trapdoors.

The Dual Tagging System: Green vs. Red Tags

SANS 10085 mandates a visual tagging system placed at every physical access point to the scaffold:

  • Green Tag ("Safe for Use"): Displayed at the access ladder or stair tower. Must indicate the inspector's name, signature, date of inspection, maximum permissible working load (e.g., Light Duty 1.5 kN/m² or Heavy Duty 3.0 kN/m²), and validity date (maximum 7 days).
  • Red Tag ("Unsafe / Do Not Use"): Displayed during erection, alteration, dismantling, or when a structural defect is identified. Prohibits any unauthorized personnel from stepping onto the structure. Working on a red-tagged or untagged scaffold is an immediate ground for disciplinary action and a Section 30 Prohibition Notice by DoEL.

3. Ladder Inspection Registers (General Safety Regulation 13A)

Portable ladders account for a disproportionate number of severe falls in construction. General Safety Regulation 13A (GSR 13A) establishes precise statutory requirements for their construction, inspection, and use.

What GSR 13A Actually Requires

Read the regulation carefully, because it is commonly misquoted:

SubregulationRequirement
13A(1)Every ladder must be constructed of sound material, suitable for its purpose, and either fitted with non-skid devices at the bottom and hooks or similar devices at the top of the stiles, or lashed, held or secured to ensure stability at all times
13A(2)No employer may use, or permit use of, a ladder whose rungs are fastened to the stiles only by nails, screws or spikes, or are not properly let into the stiles (welded, bolted or riveted rungs excepted), or which has damaged stiles or damaged or missing rungs
13A(3)A leaning ladder may not exceed 9 m in length, and two or more ladders may not be lashed together to extend reach except with an inspector's approval (free-standing ladders excepted)
13A(4)Wooden ladders must be straight-grained, defect-free, and may not be painted or covered unless it has been established that there are no cracks or inherent weaknesses; oil, clear varnish or wood preservative is permitted
13A(5)Special precautions must prevent articles falling off, and suitable sheaths or receptacles must be provided for hand tools
13A(6)A fixed ladder longer than 5 m attached to a vertical structure at 75° or more must have rungs at least 150 mm clear of the structure and a cage extending from not more than 2.5 m above the lower level to at least 900 mm above the top landing, with no part of the cage more than 700 mm from the rungs — unless rest platforms not more than 8 m apart are provided

[!IMPORTANT] GSR 13A prescribes no inspection interval and no ladder register. The monthly inspection and numbered Ladder Register described below are the standard South African site control used to demonstrate continuing compliance with 13A(1) and 13A(2) and with the employer's general duty under section 8 of the OHS Act. Treat the monthly cycle as good practice you must implement — not as a rule you can attribute to the regulation. Ladders in harsh service (plastering, steel fixing) should also be checked visually by the user before every use.

Asset Identification and Register Structure

Every ladder mobilized onto site must be assigned a unique indelible identification number (e.g., LAD-01, LAD-02). For wooden ladders GSR 13A(4)(b) prohibits painting or covering unless it has been established that there are no cracks or other inherent weaknesses, because opaque coatings conceal splits, fatigue and dry rot; oil, clear varnish and wood preservative are expressly permitted.

Structural Inspection Checklist

  • Stiles (Side Rails): Free from bends, dents, cracks, corrosion, chemical pitting, or twisting;
  • Rungs (Steps): Intact, completely rigid, free from grease, mud, or mortar; non-slip serrations unworn; no makeshift wire or nailed wooden replacement rungs;
  • Safety Feet (Shoes): High-grip rubber or polyurethane anti-slip feet present, firmly attached, and not excessively worn down;
  • Hinges, Stay-Bars, and Spreaders: On stepladders, metal locking spreaders must engage fully without slop; stepladders must never be used in a closed position as leaning ladders;
  • Rope and Pulley Systems: On extension ladders, hoisting ropes must be free of fraying, and gravity locking dogs must seat securely on rungs.

Golden Operational Rules for Site Ladder Safety

These four rules are industry good practice drawn from SANS 10085-1 and manufacturer instructions, not text you will find in GSR 13A. Apply them; cite them correctly.

  1. The 1:4 Slope Rule (approximately 75° Pitch): For every 4 metres of vertical rise to the support point, the base of the ladder is placed 1 metre horizontally out from the structure.
  2. The 1-Metre Landing Extension: A leaning ladder giving access to a floor, roof, or scaffold platform should extend at least 1 metre (about 3 rungs) above the stepping-off surface, unless adequate handholds are provided.
  3. Lashing and Tie-Off: Ladders must be firmly secured at the top stiles to prevent slipping sideways. If top lashing is impossible, the base must be staked or a worker must foot the ladder while the top is being lashed.
  4. Three Points of Contact: Workers must maintain two hands and one foot, or two feet and one hand, on the ladder at all times when climbing or descending. Carrying tools or building materials by hand while ascending is prohibited.

4. Portable Electrical Tools & Distribution Registers (EMR 10 & CR 24)

Portable electrical tools (such as angle grinders, circular saws, rotary hammer drills, and demolition breakers) operate under aggressive site conditions and represent an acute electrocution and laceration risk. Their management is governed by Electrical Machinery Regulation 10 (EMR 10) and Construction Regulation 24.

The Two Statutory Inspection Cycles in CR 24

Construction Regulation 24 sets two distinct, frequently confused intervals, and both are far shorter than the monthly cycle many candidates assume:

ProvisionWhat is inspectedWhoHow oftenRecord
CR 24(c)Control of all temporary electrical installations on siteCompetent person appointed in writingContinuous designationLetter of appointment in the H&S file
CR 24(d)All temporary electrical installations used by the contractorThat competent personAt least once a weekFindings recorded in a register kept on site
CR 24(e)All electrical machinery (including portable electrical tools)The authorised operator or userDaily, prior to use, against a relevant checklistFindings recorded in a register kept on site

[!WARNING] Do not answer "monthly" for site electrical inspections. CR 24(d) is weekly for the temporary installation, and CR 24(e) is daily pre-use by the operator for electrical machinery. CR 24 applies in addition to the Electrical Installation Regulations, 2009 and the Electrical Machinery Regulations, 1988. Many sites run a monthly colour-coded tool-tagging cycle on top of these duties; that colour code is a company control, not the statutory interval.

Technical Inspection Verification Points

  • Casing and Handles: The tool housing must be structurally sound, free from cracks, heat distortion, or missing assembly screws. Side auxiliary handles must be present and secured to ensure two-handed control.
  • Cable and Flexible Cords: The entire cord length must be inspected for cuts, abrasion, exposed copper conductors, or crushing. Tape repairs on electrical cords are strictly illegal on construction sites. Any damaged cord must be replaced with a new, continuous, vulcanized or rubber-sheathed flexible cable.
  • Plug Tops and Seals: Plugs must be industrial 3-pin standard or industrial blue CEE-form connectors. The outer cable sheath must enter deep into the plug body and be securely clamped by the cord grip; exposed individual insulated conductors outside the plug are prohibited.
  • Safety Guards: Cutting, grinding, and circular saw guards must be securely fitted, correctly aligned, and undamaged. Removing the guard from an angle grinder to fit an oversized cutting disc is a fatal site practice and an immediate dismissible safety offense.
  • Class I vs. Class II Verification:
    • Class I Tools: Metal-cased tools relying on an earth wire for shock protection. Must undergo an earth continuity resistance test (must not exceed 0.2 ohms) and an insulation resistance test (minimum 1.0 megohm).
    • Class II Tools: Double-insulated tools marked with the international concentric square symbol (square-within-a-square). These tools do not require an earth wire, but their non-conductive reinforced casing must be thoroughly verified for cracks or breaches.

Quarterly Color-Coding System

To allow immediate visual confirmation by the CHSO and supervisors, construction sites implement a quarterly color-coding tag affixed to the cord near the plug:

+-------------------------------------------------------------------------------------------------+
|                       Standard South African Site Electrical Color Codes                        |
+-------------------------------------------------------------------------------------------------+
| Quarter 1 (January - March)      ───> RED Tag                                                   |
| Quarter 2 (April - June)         ───> BLUE Tag                                                  |
| Quarter 3 (July - September)     ───> GREEN Tag                                                 |
| Quarter 4 (October - December)   ───> YELLOW Tag                                                |
+-------------------------------------------------------------------------------------------------+

Any tool found on site with an expired color tag, a damaged tag, or no tag must be removed immediately from service and placed in a locked quarantine store.


5. Fire Fighting Equipment Registers (CR 29 & ERW)

Construction Regulation 29(g) requires suitable and sufficient fire-extinguishing equipment at strategic locations (or as recommended by the Fire Chief or local authority), maintained in good working order. Construction Regulation 29(h) then requires that this equipment be inspected by a competent person appointed in writing, "in the manner indicated by the manufacturer thereof". Environmental Regulations for Workplaces 9(2) imposes the parallel duty to provide an adequate supply of suitable fire-fighting equipment at strategic locations, maintained in good working order.

The Two-Tiered Inspection Regime

  1. Routine Visual Inspection (CR 29(h)): CR 29(h) fixes the inspector (an appointed competent person) and the method (the manufacturer's instructions) but not a calendar interval. Manufacturers and SANS 10105-1 practice call for a monthly walk-round, which is therefore the standard site cycle recorded in the Fire Equipment Register.
  2. Annual Service (SANS 1475-1 / SANS 10105-1): Portable fire extinguishers are serviced annually — external and internal examination, pressure testing and recharge as required — by a service provider whose personnel are registered with the South African Qualification Certification Committee for Fire (SAQCC Fire). This annual cycle comes from the incorporated standards and the manufacturer's instructions referred to in CR 29(h), not from a numeric interval written into CR 29.

Monthly Visual Inspection Parameters

  • Physical Accessibility: Extinguisher mounted in a designated, signposted location, mounted between 1.0m and 1.5m above finished floor level; must have a 1-metre clear, unobstructed radius (never blocked by timber, bricks, or equipment);
  • Pressure Gauge: Needle resting firmly in the green operable zone (indicating sufficient nitrogen propellant pressure);
  • Safety Pin and Tamper Seal: Plastic tamper seal intact, securing the metal pull-pin in place;
  • Hose and Nozzle: Rubber discharge hose free of dry rot, cracks, and insect blockages; horn intact on CO2 units;
  • External Shell: Cylinder free from dents, deep gouges, rust, or corrosive pitting;
  • Signage: Accompanied by an approved photoluminescent SANS 1186 symbolic safety sign positioned at least 2 metres high for visibility across the site floor.

6. Lifting Tackle and Machinery Registers (DMR 18)

Lifting operations represent one of the most hazardous activities on a construction site. Driven Machinery Regulation 18 (DMR 18) establishes rigorous statutory thresholds for lifting machines (cranes, material hoists, telehandlers) and lifting tackle (slings, shackles, chains, spreader beams).

Three-Tiered Statutory Inspection Matrix

+-------------------------------------------------------------------------------------------------+
|                     DMR 18 Statutory Inspection and Testing Schedule                            |
+-------------------------------------------------------------------------------------------------+
| 1. Every 3 Months (Quarterly) ───> Visual Inspection of Lifting Tackle (DMR 18(10)(e))           |
|                                     (Synthetic slings, alloy chain slings, shackles, eyebolts)  |
|                                     By appointed competent Lifting Tackle Inspector             |
|                                                                                                 |
| 2. Every 6 Months (Bi-Annual) ───> Thorough Examination of Ropes & Chains (DMR 18(5))           |
|                                     (Steel wire hoisting ropes, winches, hoist chains)          |
|                                     By appointed competent Lifting Machinery Inspector          |
|                                                                                                 |
| 3. Every 12 Months (Annual)   ───> Performance Proof Load Testing (DMR 18(5))                   |
|                                     (Tower cranes, mobile cranes, hoists, batch plant lifters) |
|                                     Conducted exclusively by DoEL-registered LME and LMI       |
+-------------------------------------------------------------------------------------------------+

Critical Definitions: LME and LMI

  • Lifting Machinery Entity (LME): A corporate body formally accredited and registered with the Department of Employment and Labour to conduct testing and certification of lifting machinery.
  • Lifting Machinery Inspector (LMI): An individual practitioner registered with the Engineering Council of South Africa (ECSA) under the DMR who possesses the specialized engineering competence to certify load test results.

Rejection and Discard Criteria for Lifting Tackle

  • Synthetic Webbing Slings: Cut edges, tears, acid/alkali chemical etching, core fibers exposed through outer jacket, melted or charred fibers from hot works, missing or illegible Safe Working Load (SWL) capacity label.
  • Alloy Steel Chain Slings: Stretch exceeding 5% of original link length; wear exceeding 10% of nominal bar diameter; bent, gouged, or twisted links; heat discoloration.
  • Steel Wire Ropes: More than 10% broken wires within 8 diameters length; severe corrosion; localized bird-caging, core protrusion, or kinking.
  • Shackles and Eyebolts: Bent shackle bodies; damaged, cross-threaded, or homemade replacement pins (using a bolt in place of a genuine shackle pin is strictly illegal); missing stamped Working Load Limit (WLL).

7. Comparative Statutory Equipment Register Matrix

Equipment TypeGoverning Statutory RegulationMinimum Inspection FrequencyMandatory Inspector CompetencyPhysical Control / Tagging SystemKey Non-Compliance Hazard
Access ScaffoldingConstruction Regulation 16(1) & SANS 10085Weekly, post-weather, post-alteration, post-incidentAppointed Scaffold Inspector (CR 16(1))Dual Green / Red Scaff-Tag at all access pointsMissing ties; incomplete decking; unanchored base jacks
Industrial LaddersGeneral Safety Regulation 13AMonthly formal inspection; daily user visual checkAppointed Ladder Inspector (GSR 13A)Unique painted/stamped ID number; inspection log sheetSplit stiles; painted wood hiding cracks; missing rubber shoes
Portable Electrical ToolsElectrical Machinery Reg 10 & CR 24Monthly formal inspectionAppointed Electrical Tool Inspector (EMR 10 / CR 24)Quarterly color-coded vinyl tags on flexible power cordsTaped cord joints; removed blade/disc guards; failed earth continuity
Firefighting EquipmentConstruction Regulation 29 & ERW 9Monthly visual; Annual service under SABS 1475Appointed Fire Inspector (monthly); SAQCC/SABS 1475 LME (annual)Service collar; punched annual metal ring; monthly checklistBlocked access; depressurized cylinder; missing tamper pin
Lifting TackleDriven Machinery Regulation 18(10)(e)3-Monthly (Quarterly) visual inspectionAppointed Lifting Tackle InspectorQuarterly color code; stamped steel capacity tagUnstamped WLL; torn webbing; cracked chain link; makeshift bolts
Lifting MachineryDriven Machinery Regulation 18(5)6-Monthly (ropes); 12-Monthly (load test)Competent person (6-mo); Registered LME / ECSA LMI (annual)Stamped load chart in cab; formal LME proof load test certificateExpired load certificate; bypassed anti-two-block limit switch

8. Practical Site Scenarios & Exam Pitfalls

Practical Scenario 1: The Wind-Blown Scaffold Collapse

Following an intense afternoon highveld thunderstorm in Midrand with sustained winds exceeding 65 km/h, the site manager orders bricklaying teams to resume work on an external 12-metre tube-and-coupler scaffold the following morning. The site safety officer notices that several ledger braces have loosened and two sole boards have slipped. The bricklaying foreman insists that because the regular weekly inspection was completed three days earlier on Tuesday, no new inspection is legally required until next Tuesday.

  • Legal Analysis: The foreman's assertion violates Construction Regulation 16(1) and SANS 10085. The law mandates that scaffolding must be thoroughly inspected immediately following inclement weather (rain or wind storms), irrespective of when the last periodic weekly inspection occurred. The CHSO must halt all work, replace the green tag with a red "Unsafe - Do Not Use" tag, and require the appointed scaffold inspector to re-inspect the structure, tighten all couplers, and re-certify the scaffold in the register before any artisan steps onto the platform.

Practical Scenario 2: The Repaired Grinder Cord Electrocution

During a weekend concrete slab pour in Durban, an artisan uses a 230mm heavy-duty angle grinder. The cord was accidentally nicked by a rebar bender the previous day, and the electrician wrapped three layers of black PVC insulation tape around the exposed copper wires. The tool bears an expired quarterly green tag from six months prior. While grinding concrete in wet boots, the artisan touches a metal handrail and receives a debilitating electric shock.

  • Legal Analysis: The contractor committed direct statutory violations of Electrical Machinery Regulation 10 and Construction Regulation 24. Wrapping electrical cables with PVC tape is strictly unlawful on construction sites; damaged cords must be replaced in their entirety. Furthermore, the tool was operated with an expired inspection tag, demonstrating a complete breakdown in the monthly inspection register system. Both the site construction manager and appointed electrical inspector face personal liability under Section 38 for gross negligence.

9. Common SACPCMP Exam Pitfalls & Traps

[!CAUTION] Avoid These Critical Exam Errors:

  1. Assuming Weekly Scaffold Inspections Suffice After Storms: Do not fall for exam questions that state: "A scaffold was inspected on Monday; a severe storm hit on Wednesday; is it compliant to wait until next Monday?" Inclement weather instantly resets the statutory clock and mandates an immediate re-inspection.
  2. Permitting Painted Timber Ladders: In scenario questions regarding ladder procurement, an option stating that "wooden ladders must be painted bright yellow for high visibility" is false. GSR 13A prohibits paint on ladders because it hides structural rot, fractures, and defects.
  3. Confusing LME and LMI Roles Under DMR 18: The LME is the registered corporate entity/company, while the LMI is the individual professional inspector registered with ECSA who conducts and signs off the proof load test.
  4. Overlooking the 1-Metre Ladder Extension: SANS 10085-1 and manufacturer guidance require a leaning access ladder to extend at least 1 metre above the stepping-off landing surface unless adequate handholds exist. Know the figure — but do not attribute it to GSR 13A, which contains no such clause.
  5. Treating Fire Extinguisher Servicing as a Purely Internal Task: Site personnel may only perform the monthly visual checks. The annual service must be conducted by an accredited SABS 1475 registered fire technician.
Loading diagram...
Equipment & Plant Statutory Inspection Matrix (Frequencies, Competencies, Standards, and Action Protocols)
Test Your Knowledge

Under SANS 10085-1 as incorporated by Construction Regulation 16(2), which combination of circumstances obligates the appointed scaffold inspector to re-inspect an erected scaffolding platform and update the scaffolding register?

A
B
C
D
Test Your Knowledge

A safety officer inspecting a newly mobilized wooden straight leaning ladder notices that the contractor's maintenance team has painted the entire ladder with thick, opaque grey oil-based enamel paint to protect it from rainwater. Why does this violate General Safety Regulation 13A?

A
B
C
D
Test Your Knowledge

Driven Machinery Regulation 18 establishes strict periodic inspection and testing frequencies for lifting tackle and lifting machinery. What are the correct statutory intervals for the visual inspection of lifting tackle (slings, shackles), the thorough examination of steel wire hoisting ropes, and the proof load testing of lifting machinery, respectively?

A
B
C
D