10.4 Construction Documents: Construction Plans

Key Takeaways

  • Every partition on a construction plan is keyed to a wall-type schedule via a type symbol; fire-rated partitions must have the rating visible on the plan for plan reviewers and building inspectors.
  • Door symbols on plans show type (single, double, pocket, bifold, sliding) and swing direction via an arc from the hinge point to the open position; accessible doors require 32" minimum clear opening and 34"-48" AFF hardware height.
  • The accessible route must be continuous and unobstructed: 36" minimum clear width, 60" diameter turning space, and doors that do not swing into required clear floor space at accessible toilet rooms per A117.1 604.3.
  • Enlarged plans (typically 1/2"=1'-0" or 1"=1'-0") show critical areas — toilet rooms, kitchens, server rooms, entry vestibules — where standard-scale plans cannot convey sufficient dimensioning.
  • General notes apply sheet-wide; key notes are numbered and location-specific, flagged at the point of reference with text listed in a legend on the same sheet.
Last updated: August 2026

Why Construction Plans Matter

The construction plan (sometimes called the new-work plan) is the primary drawing showing all new construction — partitions, doors, fixtures, and finishes — laid out on the floor plate. It is the contractor's primary reference for building the interior. On the IDIX exam, construction plans test the designer's ability to communicate partition types, door symbols, accessible routes, clearances, and note conventions accurately and unambiguously.


Partition Types and the Wall Schedule

Every partition on a construction plan is keyed to a wall-type schedule. The plan shows the wall with a type code (e.g., "A," "B-1," "C") and the schedule provides the assembly details:

Wall TypePlan SymbolAssemblyRatingUse
AA5/8" Type X, both sides; 2-1/2" studs1 hrCorridor, tenant separation
B-1B-1Double 5/8" Type X; 3-5/8" studs2 hrExit enclosure, shaft
CC1/2" gyp, both sides; 2-1/2" studsNon-ratedGeneral office partition
DDCH-stud shaft wall1-2 hrArea separation

The plan drawing shows each wall with the type symbol in a hexagon or circle at the wall midpoint. The contractor reads the symbol, looks up the type in the schedule, and builds that assembly. Fire-rated partitions are always noted on the plan — the rating must be visible to the plan reviewer and the building inspector.


Door Symbols and Swing

Doors on construction plans use standard symbols to indicate type and swing:

Door TypePlan SymbolSwing Indication
Single doorRectangle with arcArc shows swing direction (into/out of room)
Double doorTwo rectangles with arcsTwo arcs, one per leaf
Pocket doorRectangle sliding into wall pocketArrow or note indicates slide direction
Bifold doorHinged rectangles foldingV-shape indicating fold direction
Sliding doorRectangle parallel to wallArrow indicating slide direction

The swing direction is shown by an arc from the hinge point to the door's open position. The arc indicates whether the door swings into or out of the room — critical for accessibility (doors must not swing into the required clear floor space at an accessible toilet room per A117.1 Section 604.3, except at a single-occupant room where the door may swing inward if the turning space is beyond the door swing). The door number (e.g., 101, 102) is keyed to the door schedule, which provides the size, material, fire rating, hardware, and frame type.

Loading diagram...
Door Symbols on Construction Plans

Accessible Route

The construction plan must show the accessible route — the continuous, unobstructed path connecting all accessible elements and spaces. Key requirements:

  • Clear width: 36" minimum (32" minimum clear opening at doorways per A117.1 404.2.3)
  • Turning space: 60" diameter circle or T-shaped space in rooms requiring a turn
  • Surface: stable, firm, slip-resistant; changes in level ≤1/4" vertical, 1/4"–1/2" beveled at 1:2 max slope
  • Doors: 32" clear opening minimum; hardware 34"–48" AFF; opening force ≤5 lbf (interior)
  • Passing spaces: every 200 ft on routes less than 60" wide, a 60"×60" passing space is required

On the plan, the accessible route may be shown with a dashed line and arrow or simply implied by the continuous accessible path. The designer verifies that no element (a planter, a piece of furniture, a column) obstructs the required width.


Clearances

The construction plan must maintain required clearances at fixtures, doors, and accessible elements:

ElementRequired ClearanceReference
Door maneuvering (forward, pull side)60" deep × door width + 18" latch sideA117.1 404.2.4
Door maneuvering (forward, push side)48" deep × door widthA117.1 404.2.4
Wheelchair space at fixtures30" × 48" minimumA117.1 305
Water closet centerline to side wall16"–18"A117.1 604.2
Accessible stall width60" minimumA117.1 604.8.1.1
Lavatory knee clearance27" min height, 30" min width, 19"–25" min depthA117.1 606.2

Enlarged Plans

Enlarged plans (also called large-scale plans or detail plans) show critical areas at a larger scale — typically 1/2"=1'-0" or 1"=1'-0" instead of the standard 1/8"=1'-0" or 1/4"=1'-0". Areas requiring enlarged plans:

  • Toilet rooms — fixture dimensions, grab bar locations, clearances, turning space
  • Kitchens / break rooms — countertop layout, appliance clearances, accessible reach ranges
  • Server rooms / IDF closets — rack clearance, cable tray routing, HVAC
  • Entry vestibules — door sequences, mat well, accessible route

The enlarged plan references the general plan with a match line or callout indicating where the enlarged area is located.


General Notes vs Key Notes

Construction plans use two types of notes, and the distinction matters:

General notes apply to the entire sheet or project. They appear in a block on the drawing, typically in the upper-left or lower-right corner. Examples:

  • "Verify all existing conditions before proceeding with new work."
  • "All dimensions to face of stud unless otherwise noted."
  • "Coordinate all penetrations through rated assemblies with firestopping details."

Key notes (also called keyed notes or specific notes) are numbered notes that apply to a specific location on the plan. They appear as a numbered flag (e.g., 1, 2, 3) at the specific point, with the text listed in a legend on the same sheet. Examples:

  • Note 1: "Provide 1-hr rated partition — see wall type A on sheet A-101"
  • Note 2: "Existing door to remain — refinish to match new"
  • Note 3: "Provide firestopping at all penetrations — see detail 7/A-501"

Both general and key notes must be coordinated with the specifications to avoid conflicts. If a note contradicts a specification, the specification typically governs per the General Conditions.


Exam Scenario

A typical IDIX construction-plan question shows a partial plan with a door symbol and asks the candidate to interpret the swing direction or identify the clearance deficiency. For example: a door swings into an accessible single-occupant toilet room, and the required turning space is within the door swing. The correct answer identifies that the door may not swing into the required turning space per A117.1 Section 604.3, unless the turning space is provided beyond the door swing. The designer must either reverse the door swing or relocate the turning space.

Test Your Knowledge

On a construction plan, how are fire-rated partitions typically identified so that plan reviewers and building inspectors can verify compliance?

A
B
C
D
Test Your Knowledge

What is the minimum clear width for an accessible route on a construction plan, as required by ICC A117.1?

A
B
C
D
Test Your Knowledge

A door on a construction plan swings into an accessible single-occupant toilet room, and the required 60-inch turning space is entirely within the door swing. Does this comply with accessibility requirements?

A
B
C
D
Test Your Knowledge

What scale is typically used for an enlarged plan of a toilet room to show fixture dimensions, grab bar locations, and clearances?

A
B
C
D