NCIDQ Cheat Sheet (IDFX, IDIX, IDPX)

Quick Facts

Exam
IDFX + IDIX + IDPX
Owner
CIDQ
Sections
3 (IDFX, IDIX, IDPX)
Total Items
360 (315 scored)
Total Time
10 hrs (3+4+3)
Pass Score
500 scaled (200-800)
Item Types
MC, drag-place, fill-blank, hot spot
Provider
Prometric (center or remote)

Programming Diagram Progression

Matrix to bubble to stacking to block

Adjacency matrix: proximity gridBubble diagram: graphic versionStacking diagram: floor allocationBlock diagram: massing level

Universal Design vs Code Minimum

Universal Design

  • Usable by widest range
  • Best-practice goal
  • Can exceed code

Code Compliance

  • Enforceable legal minimum
  • Specific measured conditions
  • Must be met

Aspirational vs mandatory floor

On-Screen Code Lookup Picker

  1. Need egress or occupancy rule→IBC 2021(Ch 10 means of egress)
  2. Need fixture count ratio→IPC 2021(Table 403.1, split by sex)
  3. Need one- or two-family rule→IRC 2021(Residential-specific code)
  4. Need clearance or reach range→ICC A117.1 (2017)(Accessibility standard)
  5. Need HVAC/electrical scope only→ASHRAE, NEC, NFPA(Conceptual, not on-screen)
  6. Searching is slow→Browse by chapter/section(Faster than keyword search)

Existing Conditions

Site Analysis
Location, zoning, orientation14%
Occupant Load
Code-based headcount, not client count
Change of Use
Triggers permit and CO review
Hazardous Materials
Flagged before design starts
Environmental Impacts
Seismic, air quality, weather, sound

Pre-Design

Evidence-Based Design
Research-backed, not opinion15%
Universal Design
Widest-range use; can exceed code
Market Sectors
Workplace, hospitality, healthcare, retail
Wayfinding
Full navigation system, not just signage
Benchmarking
Compare against precedent projects

Programming

Adjacency Matrix
Grid of required proximities16%
Bubble Diagram
Graphic version of adjacency matrix
Stacking Diagram
Floor-by-floor function allocation
Net Assignable vs Gross
Usable area vs usable plus circulation
Programmed Occupancy Load
Drives exits and egress width

Space Planning

Primary Circulation
Main path; usually the egress route19%
Secondary Circulation
Branches off primary into rooms
Reflected Ceiling Plan
Ceiling mirrored onto floor view
Structural Grid
Fixed column and bay constraint

FF&E and Finishes

FF&E Lead Time
Order-to-delivery; can govern schedule16%
Hue, Value, Chroma
Color, lightness, intensity
Material Sustainability
Separate issue from indoor air quality
Millwork vs FF&E
Scope boundary call on a project

Schematics

Design Concept Statement
Qualitative intent, not the program20%
Program Document vs Concept
Quantitative record vs qualitative intent
Visualization Tools
Software, renderings, physical mockups
Wayfinding Strategy
Part of the refine-intent task

Heaviest Domains Per Section

CDs 32%, Permitting 28%, Schematics 20%

IDIX Construction Docs: 32%IDPX Contracts/Permitting: 28%IDFX Schematics: 20%

IDIX vs Old PRAC

PRAC (pre-2026)

  • Hand-drafted practicum
  • Case studies
  • Half-day format

IDIX (2026+)

  • Computer-based items
  • No case studies
  • 130 Q / 4 hrs

Design dev now, not drafting

Design-Phase Study Order

  1. Want design-phase study order→IDFX(Programming to schematic design)
  2. After IDFX content mastered→IDIX(Design dev + CDs)
  3. After IDIX content mastered→IDPX(CA + project mgmt)
  4. Exam scheduling only→Any order allowed(CIDQ sets no sequence)
  5. Early-career, no experience→Start IDFX(Matches ID coursework)
  6. Experienced, all reqs met→Route 1, any order(Apply once)

Codes and Life Safety

Exit Access Travel Distance
Varies by occupancy and sprinklers16%
Plumbing Fixture Count
Split load by sex; round up
Fire Barrier
Rated wall assembly; IBC 707
Smoke Barrier
Smoke membrane; IBC 709
Smoke Partition
Unrated smoke wall; IBC 710

Fire Wall Rating Ladder

Fire barrier rated; smoke barrier rated; partition unrated

Fire barrier: IBC 707Smoke barrier: IBC 709Smoke partition: IBC 710, unrated

Fire Barrier vs Smoke Barrier

Fire Barrier (IBC 707)

  • Rated wall assembly
  • Stops fire spread
  • Rating set by use

Smoke Barrier (IBC 709)

  • Continuous membrane
  • Stops smoke movement
  • Usually 1-hr rated too

Unrated version is a smoke partition

Integration and FF&E

Plenum
Air-distribution cavity; limits combustibles19%
Low-Voltage vs Line-Voltage
Data and security vs general power
Vertical Transportation
Elevators fixed early in layout
Furniture Clearances
Must not block egress routes

Open Spec vs Closed Spec

Open Spec

  • Substitutions allowed
  • Or-equal language
  • Performance criteria option

Closed Spec

  • Only named product allowed
  • No substitutions allowed
  • Manufacturer-specific requirement

Allows alternates vs locks product

Construction Documents

Demolition Plan
Separate sheet; remove vs retain32%
Partition Type
Assembly and fire rating per wall
Keynotes vs General Notes
Numbered refs vs sheet-wide notes
Finish Transition Detail
Where two floor materials meet
Critical Elevations
Feature wall, wet wall, glazing

Drawing Coordination

Hierarchy of Information
Resolves conflicts, not the designer alone18%
Specialty Consultants
Architect, civil, electrical, lighting, mechanical, plumbing
Power, Data, Comm Plan
Designer locates; engineer sets circuits
Signage Coordination
Code-required signage design task

Specs and Schedules

CSI MasterFormat
Division 09 finishes, 12 furnishings15%
Open vs Closed Spec
Substitutions allowed vs named-only
Basis of Design
Reference product plus or-equal language
Schedule Types
Door, finish, hardware, equipment

Completion Milestones in Order

Substantial, punch list, final completion, payment

Substantial: usable, minor items leftPunch list: deficiencies to fixFinal completion: all obligations doneFinal payment: released after final

Change Order vs CCD

Change Order

  • Owner+CA+contractor agree first
  • Sets price and time
  • Then work proceeds

CCD

  • Owner+architect order first
  • Work starts before price set
  • Formalized later as change order

Agree-first vs proceed-first

Feasibility Studies

Feasibility Study
Tests viability before design spend17%
Due Diligence
Verify actual as-built conditions
Stakeholder Mapping
Every interested party, not just client
Manage Project Team
Roles: owner, CM, code official

Substantial vs Final Completion

Substantial Completion

  • Space usable now
  • Minor items still open
  • Starts warranty/occupancy clock

Final Completion

  • All obligations done
  • Punch list cleared
  • Triggers final payment

Usable now vs fully closed out

Scheduling and Budgeting

Critical Path Method
Longest chain of dependent tasks17%
Contingency vs Allowance
Unknown reserve vs unselected item budget
Value Engineering
Cut cost, keep required performance
Manage Project Schedule
Approvals, lead times, phasing

RFP vs RFQ

RFP

  • Solicits approach + price
  • For a defined project
  • Scope already known

RFQ

  • Solicits firm qualifications
  • Builds a shortlist
  • Used before fees discussed

Price ask vs credentials ask

Contracts and Permitting

Design-Bid-Build vs Design-Build
Separate contracts vs single contract28%
RFP vs RFQ
Proposal and price vs qualifications only
Bid Alternates
Optional priced scope items
Permit vs Sign-Off
Code review vs owner approval

Construction Process

Shop Drawing vs Submittal
Fabricator detail vs broader review set21%
Change Order vs CCD
Agreed change vs ordered-before-agreed
CFA vs Strike-Off
Dye-lot sample vs pattern sample
Facilitate Construction
RFIs, submittals, mockups, prototypes

Site Observation Closeout

Substantial vs Final Completion
Usable now vs fully done17%
Punch List
Remaining deficiencies before final pay
Post-Occupancy Evaluation
After-move-in performance review
Field Reports
Site-visit record of quality and safety

Design-Phase Order

IDFX then IDIX then IDPX

IDFX: front-end designIDIX: middle, construction docsIDPX: back-end, CA + PM

Route 1 vs Route 2

Route 1

  • All 3 sections at once
  • Needs edu + experience done
  • 10 admin window (~5 yrs)

Route 2

  • IDFX first, then IDIX/IDPX
  • Students/new grads can start
  • 4 admin window for IDFX

Already qualified vs still qualifying

Eligibility Route Picker

  1. Meet both education + experience→Route 1(All 3 sections together)
  2. Final-year student, no experience yet→Route 2 Part 1(IDFX only)
  3. Route 2 experience now complete→Route 2 Part 2(IDIX + IDPX)
  4. No qualifying ID degree→ARP(8,800 hrs + dossier)
  5. Degree outside US/Canada→WES or ECE eval(Course-by-course)
  6. Passed section, application lapses→Reapply + retake all(Scores void)

Fees

Route 1 Application
$235 non-refundable
IDFX Exam Fee
$305
IDIX Exam Fee
$470
IDPX Exam Fee
$365
Annual Renewal
$85 per year

Four Item Types

MC, drag-place, fill-blank, hot spot

Multiple choice: most itemsDrag-and-place: plans/schedulesFill-in-blank: numeric/text keyHot spot: click the point

Codes On Screen

IBC 2021
Searchable; building code
IRC 2021
Searchable; residential code
IPC 2021
Searchable; plumbing code
ICC A117.1 (2017)
Searchable; accessibility standard
ASHRAE, ASTM, BIFMA, OSHA, UL
Know scope; not on-screen

Common Traps

PRAC vs IDIX

PRAC: hand-drafted, case studies ≠ IDIX: computer-based, no case studies

Occupant Load vs Headcount

Occupant load is code math ≠ Headcount is the client's number

Contingency vs Allowance

Contingency: unknown-cost reserve ≠ Allowance: budget for unselected item

Change Order vs CCD

Change order: all three sign first ≠ CCD: work starts before price set

Shop Drawing vs Submittal

Shop drawing: fabricator's build detail ≠ Submittal: broader review category

CFA vs Strike-Off

CFA: confirms color/dye-lot match ≠ Strike-off: confirms pattern accuracy

Fire Barrier vs Smoke Partition

Fire barrier: rated, stops fire ≠ Smoke partition: unrated smoke wall

Last Minute

  1. 1.360 items total; 315 scored
  2. 2.IDFX: 115 Q, 3 hrs
  3. 3.IDIX: 130 Q, 4 hrs
  4. 4.IDPX: 115 Q, 3 hrs
  5. 5.Pass score = 500 (200-800 scale)
  6. 6.4 item types on every section
  7. 7.Types: MC, drag-place, fill-blank, hotspot
  8. 8.IDIX replaced PRAC in 2026
  9. 9.No case studies on IDIX
  10. 10.No ethics/business-structure domain in 2026
  11. 11.On-screen: IBC, IRC, IPC, A117.1
  12. 12.IDFX $305; IDIX $470; IDPX $365
  13. 13.Renewal = $85/year after passing
  14. 14.Angoff method sets passing score
Same family resources

Explore More NCIDQ Interior Design Certification (CIDQ)

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

More From This Family

Videos and articles for deeper review.