  • The Level I written exam is 60 questions in 60 minutes, calculator not permitted, with domain weights of 15% Scope, 13% Technical, 30% Inspection, and 42% Execution.
  • The current CCO handbook does not publish a numeric written passing score; do not plan around an unsupported scaled score of 70.
  • Level I verifies supplied load weight and attachment points and applies tags and tables; material-density, center-of-gravity, and sling-tension calculations are Level II topics.
  • High-value exact rules include OSHA's wire-rope 10/5 criterion, chain wear table, metal-mesh criteria, material temperature limits, and personnel trial/proof-test distinction.
  • Use scenarios to practice source selection, removal decisions, compatible application, hazard communication, and safe landing—not formula memorization.
Last updated: August 2026

Written Exam Final Review and Scenarios

Exam facts

The current CCO Rigger Level I written exam contains 60 multiple-choice questions, allows 60 minutes, and does not permit a calculator. The official domain weights are:

  • Scope of the Rigging Activity: 15%
  • Technical Knowledge: 13%
  • Rigging Inspection: 30%
  • Execution of Rigging Activity: 42%

The current handbook does not publish a numeric written passing score. A “scaled score of 70” should not guide preparation. Learn every listed duty and use CCO's official result reporting.

Level I works with known or provided load weight, center of gravity, attachment points, and rigging configuration. The formula-heavy subjects of determining weight from dimensions, calculating center of gravity, and calculating sling tensions appear in Level II. No density table or trigonometric formula sheet belongs at the center of Level I review.

One-minute question method

Read the stem for the governing condition: general industry or construction, sling material, pre-use or periodic inspection, material or personnel lift, hitch, angle, temperature, and named standard. Then:

  1. Identify the item or operation.
  2. Locate the correct source family.
  3. Apply the exact marking, removal criterion, or supplied table.
  4. Reject choices that guess a rating, continue after an unresolved hazard, or alter gear.
  5. Flag a genuinely slow question and return after completing direct questions.

A cautious answer is not automatically correct; it must match the facts. “Remove from service” is correct when a criterion is met. It is not a substitute for knowing whether a mark is cosmetic or whether the stated threshold applies to that material.

Final Scope review

Be able to trace the travel path and identify fall zone, pinch points, side loading, shock loading, electrical exposure, landing hazards, and need for sling protection. Verify the provided weight and approved attachment points. Recognize special loads and state the hazard clearly.

For an unknown overhead-line voltage, remember the 20-foot OSHA planning clearance. When voltage is known, use Table A; do not use an invented 0.4-inch-per-kV formula. No one may stand directly under a suspended load.

If the load reacts contrary to the supplied plan, stop and return it to stable support rather than calculating a new configuration.

Final Technical review

Know the seven Level I sources: B30.9, B30.10, B30.20, B30.26, OSHA 1910.184, OSHA 1926.251, and OSHA 1926.1431. B30.5 is identified for Level II only in the current handbook's reference list.

Distinguish WLL from proof load, breaking strength, and design factor. Ratings depend on exact product and configuration. Manufacturer-specific shackle side loads, eyebolt angles, hoist-ring capacities, bend diameters, and termination efficiencies are not universal percentages.

For personnel hoisting, conventional access must be more hazardous or impossible. Equipment capacity is limited to 50%. The unoccupied trial lift uses at least anticipated lift weight; the separate proof test uses 125% of platform rated capacity for five minutes.

Final Inspection review

Memorize exact OSHA criteria only with their material:

  • Wire rope: 10 random broken wires in one lay or 5 in one strand in one lay; one-third wear of outside individual wires; kink, crush, birdcage, heat, damaged end attachment, or corrosion.
  • Alloy chain: use Table N-184-1, not 10%; nominal 1/2-inch chain is removed below 25/64 inch. Above 1,000°F means permanent removal; above 600°F requires manufacturer reduction.
  • Metal mesh: broken edge weld or braze; 25% wire loss from abrasion or 15% from corrosion; lost flexibility; specified 10% handle-slot or eye change, 15% handle-eye area loss, or out-of-plane handle.
  • Synthetic web: acid or caustic burn, melting or charring, snag, puncture, tear or cut, broken or worn stitching, or distorted fitting.
  • Hooks: identify whether the question uses OSHA's 15% throat and 10° twist criteria or B30.10/manufacturer gauges that can be more restrictive.

Check required tags first. A missing rating is not solved by half-capacity use.

Final Execution review

Identify the six sling groups and use the tagged capacity for vertical, choker, basket, or bridle configuration. A basket is not automatically 200%, and a choker is not automatically 75%. A flatter sling angle increases force, but Level I reads the supplied tag or table rather than calculating tension.

Seat hooks in the bowl, use correct pins, preserve alignment, protect damaging edges, and keep latches unloaded. Know how the Level I hardware families fit into the load path: shackles, adjustable devices, links, rings, swivels, blocks, hooks, hoists, movement devices, compression hardware, beam clamps, softeners, eyebolts, hoist rings, and jacks.

Secure the landed load, make all rigging slack, disconnect clear of pinch points, and do not pull a sling from beneath a resting load. Inspect and segregate damaged gear before storage.

Scenario 1: inspection

A 1/2-inch alloy-chain link measures 3/8 inch at its most worn point. The correct comparison is 25/64 inch, not a universal 10%. Because 3/8 equals 24/64, it is below the OSHA minimum and the sling is removed.

Scenario 2: personnel platform

The unoccupied platform completes a route check at anticipated lift weight, but no jobsite proof test has been conducted. Employees are not hoisted. The trial lift did not replace the 125% proof test and five-minute hold.

Scenario 3: hitch selection

A sling tag provides a two-leg bridle rating at 60° from horizontal, but the planned configuration is 45°. The 60° value does not apply. Stop and obtain the correct rated value or revised configuration; do not compute an unofficial factor.

Scenario 4: practical knowledge

A proposed Level I practice station asks for emergency-stop hand signals. Reject the premise: current Level I practical tasks are inspection, hitches, connections, and five knots. Use official task instructions to focus preparation.

Final readiness check

You are ready when you can explain why each answer follows its source, not just recite a number. Complete mixed sets under a one-hour limit, review every missed choice, and classify the error: wrong standard, wrong material, wrong task level, missed qualifier, or unsafe assumption. That method transfers directly to field decisions.

Test Your Knowledge

What is the correct written-exam format?

A
B
C
D
Test Your Knowledge

What should a Level I candidate do with an unknown sling tension?

A
B
C
D
Test Your Knowledge

Which value is the OSHA minimum for a nominal 1/2-inch alloy-chain link?

A
B
C
D
Test Your Knowledge

Which Level I review item is out of scope?

A
B
C
D
Congratulations!

You've completed this section

Continue exploring other exams