7.3 Inspections and Tests: DWV, Water, Sewers, Storm, Shower Pans & Backflow
Key Takeaways
A DWV water test fills the system, or each section, to at least a 10-foot head, retests the upper 10 feet of the section below, and holds for 15 minutes (IPC 312.2).
A DWV air test holds 5 psi, or enough to balance a 10-inch mercury column, for 15 minutes, and plastic piping may not be tested with air (IPC 312.3).
A final smoke test fills all traps, introduces pungent smoke, closes the stack openings when smoke appears, and holds 1 inch of water column for 15 minutes (IPC 312.4).
A water supply system is tested with potable water at no less than working pressure, or (for piping other than plastic) with air at no less than 50 psi, for 15 minutes (IPC 312.5).
A gravity building sewer is tested with at least a 10-foot head of water for 15 minutes, a forced sewer at 5 psi above the pump rating for 15 minutes, and a shower liner with 2 inches of water at the threshold for 15 minutes (IPC 312.6, 312.7, 312.9).
Why this section matters
Testing questions fall under System Installation and General Knowledge. Almost every number lives in IPC 312, and 15 minutes is the hold time for every DWV, water, sewer and shower-pan test. The hard part is matching the right medium and pressure to each system, and remembering what the 2021 code no longer allows, such as air-testing plastic.
Inspection stages
The IPC's administrative chapter (Chapter 1, "Required Inspections and Testing"), as adopted by the local jurisdiction, calls for:
- Underground inspection: after trenches are dug and bedded and piping is installed, before backfill.
- Rough-in inspection: after the roof, framing, fireblocking, firestopping, draftstopping and bracing are in place and all sanitary, storm and water piping is roughed in, before wall or ceiling membranes go on.
- Final inspection: after the building is complete, all fixtures are set and connected, and the structure is ready for occupancy.
The permit holder must request inspections and keep the work visible and accessible until it is approved. Work may not proceed past an inspection point without approval. In Alabama, local building departments issue permits and inspect, while the Board licenses the workers. Under rule 720-X-11-.01, a registered apprentice works under the direct supervision of a journeyman or master who stays on the job site. One supervisor may oversee up to 5 apprentices on a residential jobsite and up to 3 on other jobsites.
General test rules (312.1)
- The permit holder performs the tests, gives the code official reasonable notice, and furnishes the equipment, materials, power and labor.
- Piping is tested with water, or, for piping other than plastic, with air.
- After fixtures are set and traps filled, the whole drainage system gets its final test.
- The code official may require cleanouts to be removed to confirm that the pressure reached every part of the system.
Test gauges (312.1.1):
| Test pressure | Gauge increments |
|---|---|
| 10 psi or less | 0.10 psi or finer |
| Over 10 up to 100 psi | 1 psi or finer |
| Over 100 psi | 2 psi or finer |
DWV tests (312.2–312.4)
Water test (312.2):
- Whole system: close every opening except the highest, and fill to the point of overflow.
- In sections: plug every opening except the highest in the section, and give each section at least a 10-foot head of water. When testing the next section up, retest at least the upper 10 feet of the section below. That way every joint except the top 10 feet of the system sees a 10-foot head.
- Hold for at least 15 minutes, with the system tight at all points.
- A 10-foot head is about 4.3 psi at the bottom of the section (10 × 0.433).
Air test (312.3):
- Plastic piping shall not be tested using air. If plastic fails under compressed air it can shatter, so plastic DWV is water-tested.
- Pump air to a uniform 5 psi, or enough to balance a 10-inch column of mercury, and hold for 15 minutes.
- Make any adjustments for temperature changes or gasket seating before the test period starts.
Final test (312.4):
- The final test of the completed drainage and vent system is visual, in enough detail to confirm code compliance.
- Where a smoke test is used:
- Fill all traps with water.
- Introduce pungent, thick smoke from one or more smoke machines.
- When smoke appears at the stack openings on the roof, close them.
- Hold 1 inch of water column for 15 minutes.
(Older codes also described a peppermint test. It is not in the 2021 IPC.)
Water supply test (312.5)
- Test a completed section or the whole system under a water pressure no less than the system's working pressure.
- Or, for piping other than plastic, use an air test of at least 50 psi.
- Hold for 15 minutes. Water for the test must come from a potable source.
- A 50 to 100 psi test needs a gauge in 1-psi increments.
- After testing, disinfect the system per 610.1 before it is used.
Sewer, storm, shower pan and backflow tests
| Test | Requirement | Section |
|---|---|---|
| Gravity building sewer | Plug at the public sewer connection, fill, and hold at least a 10-foot head for 15 minutes | 312.6 |
| Forced (pumped) sewer | Plug at the connection and apply 5 psi above the pump rating for 15 minutes | 312.7 |
| Storm drains inside a building | Water or air tests as in 312.2 or 312.3 (no air on plastic) | 312.8 |
| Shower liner | Plug the drain, fill to at least 2 inches at the threshold (build a temporary dam if the threshold is lower), hold 15 minutes with no leakage | 312.9 |
| Backflow assemblies and air gaps | Annual inspection. RP, double check, PVB, detector, spill-resistant and hose-connection assemblies tested at installation, after repair or relocation, and annually, with ASSE 1064 gauges | 312.10 |
| Vacuum drainage | Vacuum test at 19 inches of mercury | 715.3 |
| Fuel gas piping | 1.5 × working pressure, at least 3 psig. Duration at least 10 minutes for a single-family dwelling or a system under 10 cubic feet, otherwise 1/2 hour per 500 cubic feet (IFGC 406.4) | IFGC 406 |
Common failure points
- Water test leaks at unglued plastic joints, loose hubless couplings, cracked fittings and the test plugs themselves. Recheck the plugs first.
- A dropping air gauge on metal piping may be temperature change. That is why adjustments are made before the timed period starts.
- Shower pans leak where the liner was nailed below the threshold or the drain clamp ring was not tightened. Section 421.5.2 bans nails within 1 inch above the threshold.
- Never cover or conceal work that failed a test or has not been approved.
Exam traps
- No air test on plastic (312.3). Use the water test.
- DWV air test 5 psi; water supply air test 50 psi (and not on plastic).
- Water supply water test is at working pressure, not a fixed 50 psi.
- Gravity sewer: 10-foot head of water only. Forced sewer: 5 psi above the pump rating.
A plumber wants to air test a newly installed PVC drain, waste and vent system. What does IPC 312.3 say?
Air test it at 10 inches of mercury for 30 minutes
Do not air test plastic; use the water test instead
Air test it at 5 psi for 15 minutes using a 0.10-psi gauge
Air test it at 50 psi for 15 minutes using a 1-psi gauge
What test does IPC 312.6 require for a gravity building sewer?
Fill to at least a 10-foot head of water and hold 15 minutes
Smoke test at 1 inch of water column for 15 minutes
Air test at 5 psi for 15 minutes with a 0.10-psi gauge
Apply 5 psi above the pump rating for 15 minutes
What water depth and test time does IPC 312.9 require for a shower liner test?
1 inch at the drain, held for 30 minutes
2 inches at the threshold, held for 15 minutes
A 10-foot head of water, held for 15 minutes
4 inches at the threshold, held for 1 hour