What should a scaled site plan show for a new Minnesota home?

Tap to reveal definition
Card 1 of 50Plans & Specifications

Filter by Topic

Jump to Card

About These Minnesota General Contractor Flashcards

These 50 flashcards are designed to help you memorize key terms and definitions for the Minnesota Residential Building Contractor Qualifying Builder (QB) Exam. Each card shows a term on the front and its definition on the back—the classic flashcard format for vocabulary memorization. Use these alongside our practice questions to build both recall and comprehension.

Topics Covered

Plans & Specifications2 cards
Energy Code4 cards
Building Planning & Life Safety5 cards
Sitework3 cards
Concrete & Foundations4 cards
Carpentry4 cards
Roofing3 cards
Exterior Finishes2 cards
Foam & Interior Finishes2 cards
Plumbing Coordination1 cards
Contractor Licensing7 cards
Contracts & Warranties4 cards
Mechanics Liens4 cards
Employment & Insurance2 cards
Jobsite Safety3 cards

Complete Flashcard Reference

Review every term in this set. Open any term to reveal its definition.

What should a scaled site plan show for a new Minnesota home?

Show the sizes and locations of proposed and existing structures, distances from lot lines, established street grades and proposed finished grades. Base the plan on an accurate boundary survey (Minn. R. 1300.0130).

What must happen before work proceeds on a change that departs from the approved construction documents?

Submit the change to the building official for approval before doing the affected work. The revised construction documents give the inspector a basis for checking the change under Minn. R. 1300.0130.

What does a lower window U-factor tell you?

The window transmits less heat per unit area for the same temperature difference. Minnesota’s prescriptive Table R402.1.1 lists a maximum of 0.32 for fenestration other than skylights in climate zones 6 and 7.

What does 13+5 mean in Minnesota’s prescriptive wood-frame wall insulation table?

It means R-13 insulation in the wall cavity plus R-5 continuous insulation or insulated siding. This is one listed option for climate zone 6 in Table R402.1.1.

Where should you place the air barrier and vapor retarder when insulating the inside of a basement foundation wall with fiberglass batts?

On the warm-in-winter side of the wall assembly. Seal it to the framing and around utility boxes and other penetrations so the air barrier stays continuous (R402.1.1.7).

What makes a dwelling’s mechanical ventilation system balanced?

Its outdoor air intake is within 10% of its exhaust output. That is the definition of a balanced system in Minn. R. 1322.0202.

How do you measure the minimum clear width of a dwelling’s required egress door?

Open the side-hinged door 90 degrees. The space from the door face to the stop must be at least 32 inches under R311.2.

Where is an emergency escape and rescue opening required when adding a bedroom to an existing unsprinklered basement?

Provide a compliant operable opening in the new bedroom. An opening in a neighboring recreation room does not serve the bedroom (Minn. R. 1309.0310).

What is the standard minimum headroom for a new straight residential stairway?

6 feet 8 inches. Measure vertically from the sloping line along the tread nosings or from the walking surface of the landing (R311.7.2).

What smoke-alarm requirement is triggered by adding a sleeping room to an existing home?

Equip the dwelling with smoke alarms in the locations required for new construction. Adding a bedroom can trigger alarm installation elsewhere in the dwelling (R314.2.2).

Can a private garage have a door directly into a bedroom?

No. Minnesota prohibits a direct opening from a private garage into a sleeping room (R302.5.1). The door specifications in that section apply to other openings between the garage and dwelling.

What is the standard grade fall away from a foundation where the lot allows it?

At least 6 inches in the first 10 feet. The fall carries surface water away from the foundation wall (R401.3).

Can a footing bear on soil that is frozen when the concrete is placed?

No. The footing must bear on unfrozen soil. For permanent supports that need frost protection, Minnesota allows several methods, including setting the footing below the applicable frost line (R403.1.4.1).

How much notice does Gopher State One Call need before routine excavation?

Give at least 48 hours’ notice. Exclude the day of notification, Saturdays, Sundays and holidays. Minn. Stat. § 216D.04 also limits advance notice to 14 calendar days.

What is unbalanced backfill height for a basement wall with soil on its exterior side?

It is the height difference between the outside finished grade and the top of the interior concrete slab. Use it with wall height and soil class to select the applicable foundation wall requirements (R404.1).

What embedment is generally required for a prescriptive sill-plate anchor bolt?

At least 7 inches into concrete or into a grouted masonry cell under R403.1.6. Check the applicable anchorage table as well when the connection provides lateral support to a foundation wall.

Which below-grade foundation walls must be waterproofed under Minnesota’s R406.2?

Exterior concrete and masonry foundation walls that retain earth and enclose below-grade interior space, including crawl spaces. The baseline coverage extends from the top of the footing to finished grade, or follows the manufacturer’s installation instructions.

What air content does Table R402.2 specify for a weather-exposed concrete porch when the standard air-entrainment requirement applies?

5% to 7% of the concrete volume. Entrained air improves the concrete’s resistance to freeze-thaw damage.

Which inputs do you need to select a conventional floor-joist span from the code table?

Use the required live and dead loads, lumber species and grade, joist size and on-center spacing. Then compare the actual span with the allowable span in the applicable R502.3 table.

What does a braced wall panel do in wood-frame construction?

It helps the wall resist in-plane lateral loads, such as wind, that would rack the frame. Match the sheathing and fastening to the bracing method used under R602.10.

Who must approve cutting a roof truss to make room for a duct?

A registered design professional must approve a field alteration to a truss member under R802.10.4. The change can affect how the truss carries loads.

Can brick veneer support a deck ledger?

No. The ledger needs a structural load path to appropriate framing or backing. Where a compliant attachment is unavailable, a separately supported deck is an option under R507.

What underlayment does the residential code require under asphalt shingles on a 3:12 roof?

Double underlayment installed under R905.1.1. A 3:12 pitch is within the low-slope range covered by R905.2.2.

On a 6:12 asphalt-shingle roof where an ice barrier is required, how far inboard must it extend?

From the lower roof edge to at least 24 inches inside the exterior wall line. Use the wall line as the reference point (R905.1.2).

When does Minnesota require kick-out flashing at an existing eave-to-sidewall intersection during exterior work?

When the wall is re-sided, including a project that also replaces the roof. A roof-only replacement is excepted. The flashing diverts roof runoff away from the wall (R903.2.1.1).

How should the wall’s water-resistive barrier overlap the required flashing?

Lap the barrier over the flashing by at least 2 inches under Minnesota’s R703.2. The overlap lets water drain outward along the flashing.

What clearances keep a stucco weep screed above soil or paving?

Keep it at least 4 inches above soil or 2 inches above paving under R703.7.2.1. The screed gives water behind the stucco a way to exit.

What is a common thermal barrier between foam plastic insulation and the building interior?

Approved ½-inch gypsum wallboard is one option under R316.4. The barrier delays heat exposure to the foam in a fire. R316.5 sets out specific exceptions.

How do you protect an enclosed under-stair closet that has an access door?

Install ½-inch gypsum board on the closet side of its walls, the underside of the stairs and any soffits (R302.7).

What fixtures are the minimum for basic sanitation in a new Minnesota single-family home?

Provide a flushing toilet, a lavatory, a kitchen sink and either a bathtub or a shower. DLI identifies these as the minimum under Minnesota’s residential and plumbing codes.

Which residential license covers building a new detached house in Minnesota?

The Residential Building Contractor license (BC), for which the qualifying person takes the QB exam. The Residential Remodeler license (CR) covers work on existing structures.

What generally triggers Minnesota residential contractor licensing when you contract directly with an owner?

Offering work in more than one special skill area on residential real estate with one to four units generally requires a residential building contractor or remodeler license, depending on the work. Roofing has its own licensing trigger even as a single skill.

What is a Minnesota qualifying builder’s QB registration number used for?

The person can use it to track continuing education and provide it for the business’s BC license application. DLI issues the business license separately before the business can contract under that license.

When can one qualifying person serve two licensed Minnesota LLCs?

The LLCs must share at least 25% common ownership, and the individual must be eligible in each LLC. For an LLC, the qualifying person must be its chief manager or a qualifying managing employee (Minn. Stat. § 326B.805, subd. 4).

How much continuing education does a qualifying builder need to renew the Q registration?

14 approved hours per two-year cycle. Include at least one hour on the Minnesota Energy Code and one on business management strategies.

What are Minnesota’s minimum split liability limits for a residential building contractor?

$100,000 per occurrence and $300,000 aggregate for bodily injury, plus $25,000 for property damage. A combined limit of $300,000 per occurrence and $300,000 aggregate also qualifies (Minn. Stat. § 326B.86, subd. 2).

What type of loss can Minnesota’s Contractor Recovery Fund cover?

Eligible claimants may recover direct, documented out-of-pocket losses caused by misconduct or failure to perform by a licensed residential building contractor or remodeler. A final docketed judgment is among the application requirements.

How must a licensed Minnesota contractor document a customer change order?

Put it in writing and have both sides sign and date it. Identify the changed work, the materials or standard features, and the price or how to calculate it (Minn. Stat. § 326B.809).

What do the 1-, 2- and 10-year Minnesota new-home warranties cover?

From the warranty date, the periods cover workmanship and material defects for 1 year, faulty installation of plumbing, electrical, heating or cooling systems for 2 years, and major construction defects for 10 years, when caused by noncompliance with building standards (Minn. Stat. § 327A.02).

How soon should a buyer report a loss under Minnesota’s statutory home warranty?

Send written notice to the vendor within six months of discovering the loss or when it should have been discovered. Minn. Stat. § 327A.03 provides an exception if the buyer establishes that the vendor had actual notice.

When may an insured customer cancel a qualifying insurance-funded roofing contract after the claim is denied?

Within 72 hours after the insurer notifies the customer of the denial. Minn. Stat. § 326B.811 applies to covered written contracts for work to be paid from property or casualty insurance proceeds.

Where does a prime contractor put the pre-lien notice when using subcontractors on a job with a written owner contract and no notice exemption?

Include the statutory notice in the written contract and give the owner a copy. The notice alerts the owner to possible claims by unpaid contributors (Minn. Stat. § 514.011, subd. 1).

What starts the 45-day clock for a subcontractor’s required Minnesota pre-lien notice?

The first time the subcontractor furnishes labor, skill or materials for the improvement. Deliver the notice to the owner or authorized agent in person or by certified mail (Minn. Stat. § 514.011, subd. 2).

By when must a Minnesota mechanics lien claimant record and serve the lien statement?

Within 120 days of the claimant’s last work or contribution. Record with the county recorder or the registrar of titles for registered land. Serve a copy personally or by certified mail as specified in Minn. Stat. § 514.08.

What date starts Minnesota’s one-year period for asserting a mechanics lien in court?

The date of the last item of the claim shown in the recorded lien statement. Assert the lien within one year by filing a complaint or answer (Minn. Stat. § 514.12).

Does a Form 1099 establish independent contractor status on a Minnesota construction job?

No. For covered construction services, the worker is treated as an employee unless the business entity through which the worker operates meets all 14 statutory requirements (Minn. Stat. § 181.723, subd. 4).

How does a private Minnesota employer that owes workers’ compensation secure payment?

Obtain workers’ compensation insurance from an authorized carrier or get written approval to self-insure from the commissioner of commerce (Minn. Stat. § 176.181, subd. 2).

What certification applies to paid window replacement that disturbs lead paint in a covered pre-1978 Minnesota home?

The firm needs certification under the EPA Renovation, Repair and Painting rule. Use a certified renovator and lead-safe work practices. Minn. Stat. § 326B.106, subd. 14, ties the contractor requirement to the federal rule.

At what height does the residential construction fall protection rule generally apply?

At 6 feet or more above a lower level. Use a guardrail, safety net or personal fall arrest system unless a specific allowed alternative applies (29 CFR 1926.501(b)(13)).

Does a 5-foot-deep trench in soil need a cave-in protective system for workers?

Yes. At 5 feet or deeper, protect workers with an appropriate system such as sloping, shoring or shielding. The stable-rock exception applies only when the excavation is entirely in stable rock.

Frequently Asked Questions

Which Minnesota contractor exam do these flashcards cover?

They cover DLI’s Qualifying Builder (QB) exam for the qualifying person of a Residential Building Contractor (BC) license applicant. Minnesota has separate qualifying exams for residential remodelers and roofers.

How long is the Minnesota Qualifying Builder exam?

DLI gives candidates 5 hours and 30 minutes for 110 multiple-choice questions. The passing score is 70%. DLI does not publish a current candidate pass rate on its exam page or in its exam guide.

What references does DLI provide at the exam?

DLI supplies the 2020 Minnesota Residential Code and its reference manual for residential building contractor and remodeler exams. The exam guide also describes a DLI-provided calculator. Practice finding the relevant section or table in each reference before exam day.

What topics does the Minnesota Qualifying Builder exam cover?

DLI describes a test with about 60% residential code questions and the balance on statutes and rules. Code topics include plan review, energy, life safety, sitework, foundations, carpentry, roofing and finishes. Review the state’s licensing, warranty and lien rules alongside the code.

Do I need construction experience or sponsorship to apply?

You can apply directly to DLI without employer sponsorship. DLI lists no experience or education prerequisites for the exam. The business license application is a separate step that uses the designated qualifying person’s QB number.

When can I reapply after failing the exam?

Wait 30 days after receiving your results before reapplying. Submit a new application and pay the fee again. DLI lists no separate waiting period for a third failure.