Cheat sheet

Minnesota General Contractor Cheat Sheet

Quick Facts

Exam
Qualifying Builder (QB)
Administrator
Minnesota DLI
Format
110 multiple-choice questions
Time limit
5 hours 30 minutes
Passing score
70%
Exam application fee
$50
Test format
Open book, provided materials only
Provided code
2020 Minnesota Residential Code
Provided manual
DLI contractor exam reference manual
Question mix
About 60% residential code
Other questions
Industry statutes and rules
Language options
English or Spanish
Provided calculator
Standard desktop calculator
Scoring
Equal points, no partial credit

Escape, Exit, Guard

Escape 310, exit 311, guard 312

R310 emergency escapeR311 means of egressR312 fall protection

Egress Door vs Escape Opening

R311 egress

  • Normal exit route
  • Required side-hinged door

R310 escape and rescue

  • Emergency access and escape
  • Check clear opening dimensions

Check both applicable sections

Life Safety Lookup

  1. Adding a basement bedroom→R310.6.1 and R314.2.2(Check escape and alarm exceptions)
  2. Checking required exit door→R311.2(Verify clear opening)
  3. Measuring altered basement stairs→R305.2.2(Existing basement headroom)
  4. Checking a raised open edge→R312.1.1(Measure vertical drop)
  5. Checking low operable window openings→§326B.106 subd. 7(b)(Check floor and exterior grade)
  6. Opening connects garage and dwelling→R302.5.1(Check room use and door)

Plans and Inspections

Permit triggers
Minnesota Rules 1300.0120
Construction documents
Minnesota Rules 1300.0130
Site plan
Scaled lot lines and grades
Reviewed plan revisions
Building official approval before proceeding
Footing inspection
After excavation and reinforcement setup
Slab inspection
Before concrete covers embedded work
Inspection sequence
Minnesota Rules 1300.0210
Occupancy approval
Minnesota Rules 1300.0220

Guard vs Handrail

Guard

  • Limits falls at open edges
  • R312 open-side protection

Handrail

  • Provides a graspable stair support
  • R311.7.8 stair handrails

A stair can require both

Egress and Falls

Emergency escape opening
R310 basements, habitable attics, bedrooms
Required egress door
R311.2 side-hinged, ≥32-inch clear width
Standard stair headroom
R311.7.2 minimum 6 ft 8 in
Existing basement stair alteration
R305.2.2 minimum 6 ft 4 in
Open-side guard trigger
R312.1.1 drop over 30 inches
Window device exemption, interior
Lowest opening ≥24 inches above floor§326B.106 subd. 7(b)
Window device exemption, exterior
Lowest opening ≤72 inches above grade§326B.106 subd. 7(b)
Hazardous glazing locations
R308.4 safety glazing lookup
New habitable ceiling
R305.1 generally 7 ft minimum

Alarms and Garage Separation

Smoke alarms
R314 bedrooms, nearby, each story
Carbon monoxide alarms
R315 outside sleeping areas
CO alarm proximity
Within 10 ft of sleeping areas
New dwelling CO triggers
Fuel-fired appliance or communicating garage
Garage opening into bedroom
Prohibited by R302.5.1
Garage separation from residence
½-inch gypsum or equivalentGarage side
Habitable rooms over garage
⅝-inch Type X gypsum or equivalentTable R302.6

Footing vs Foundation Wall

Footing

  • Spreads load to ground
  • R403 sizing and frost protection

Foundation wall

  • Carries loads and retains soil
  • R404 reinforcement and backfill

Match table to component

Structural Lookup

  1. Digging near buried facilities→Gopher State One Call(Request utility locations first)
  2. Selecting depth for frost protection→R403.1.4.1(Confirm frost zone and exceptions)
  3. Sizing a footing→R403 footing tables(Use loads and soil bearing)
  4. Designing a backfilled foundation wall→R404 foundation tables(Match material, height, soil pressure)
  5. Retaining earth around below-grade space→R406.2 waterproofing(Concrete or masonry walls)
  6. Attaching a deck to structure→R507.9(Check vertical and lateral connections)

Sitework and Soils

Boundary survey
Basis for scaled site plan
Surface drainage
R401.3 grade away from foundation
Bearing soil
Table R401.4.1 presumptive bearing values
Frost depth
R301.2(1) climate table
Excavation utility notice
Gopher State One CallMinn. Stat. §216D.04
Underground facilities
Confirm operator markings before excavation
Unbalanced backfill
Foundation reinforcement table input

Footings and Foundations

Footing sizing
R403 load and bearing capacity
Footing bearing surface
Keep footings off frozen soil
Frost protection methods
R403.1.4.1 and Rule 1303.1600
Foundation walls
R404 wall and reinforcement tables
Foundation anchorage
R403.1.6 sill attachment
Foundation drainage
R405 perimeter drain lookup
Below-grade retaining foundation walls
R406.2 waterproof concrete and masonry
Residential slabs
R506 fill, base, vapor retarder
Concrete strength
Table R402.2 28-day strength
Specified air entrainment
Table R402.2 note d, 5–7%
Rule 1303.1600 frost depth
Zone I 5′, Zone II 3½′Absent engineer’s soil determination

Framing and Decks

Decay protection
R317 treated or durable wood
Conventional floor framing
R502 joist sizing and spans
Engineered floor members
Use approved product specifications
Wood wall bracing
R602.10 braced wall panels
Roof trusses
R802.10 design and bracing
Roof uplift connections
R802.11 uplift resistance
Deck footings
R507.3 tributary area and soil
Deck ledger fastening
R507.9.1 approved attachment
Deck ledger lateral loads
R507.9.2 hold-down connections
Unverifiable deck attachment
Provide a self-supporting deck
Wood foundations
R404.2 design lookup
Masonry chimneys
R1003 chimney requirements

Remember R Up, U Down

Resist more with R, transfer less with U

Insulation: higher RFenestration: lower U

Air Barrier vs Vapor Retarder

Air barrier

  • Controls air leakage
  • Seal joints and penetrations

Vapor retarder

  • Controls vapor diffusion
  • Check material permeance

Identify the moisture transport mechanism

Envelope Lookup

  1. Selecting prescriptive windows→Table R402.1.1(Energy code U-factor column)
  2. Sealing air barrier penetrations→Energy R402.4.1.1(Check component sealing details)
  3. Roof eave meets sidewall→R903.2.1 kick-out flashing(Divert runoff away from wall)
  4. Choosing asphalt shingle assembly→R905.2(Check slope and substrate)
  5. Draining water behind siding→R703.2 and R703.4(Connect barrier and flashing)
  6. Foam plastic faces building interior→R316.4 and R316.5(Check protection and exceptions)

Energy Envelope

Residential energy rules
Minnesota Rules chapter 1322
Insulation R-value
Higher means more thermal resistance
Fenestration U-factor
Lower means less heat transfer
Prescriptive window U-factor
0.32 maximum, zones 6–7
Prescriptive skylight U-factor
0.55 maximum, zones 6–7
Prescriptive ceiling insulation
R-49 table value, zones 6–7
Interior air barrier
Limits airflow through assembly
Wind wash barrier
Protects insulation from moving air
Vapor retarder
Limits vapor diffusion
Blower-door testing
R402.4.1.2 measures envelope leakage

R-Value vs U-Factor

R-value

  • Resistance to heat flow
  • Prescriptive insulation minimums

U-factor

  • Rate of heat transfer
  • Prescriptive fenestration maximums

Higher R, lower U

Roof Coverings and Flashing

Roof weather protection
R903 drainage and flashing
Roof covering requirements
R905 by covering type
Asphalt shingle sheathing
Solid deck or nominal 1-inch boards
Wood shingles and shakes
Check R905.7 and R905.8
Ice barrier
R905.1.2 eave protection
Kick-out flashing
R903.2.1 diverts roof runoff
Attic ventilation
R806 vented roof spaces
Attic access opening
R807.1 minimum 22 × 30 inWhere access required

Cladding and Interior Finishes

Water-resistive barrier
R703.2 behind exterior cladding
Wall flashing
R703.4 routes water outside
Vinyl siding
R703.11 installation lookup
Exterior stucco
R703.7 lath, plaster, weep screed
Brick veneer
R703.8 flashing and weeps
Gypsum board application
R702.3 fasteners and spacing
Foam plastic
R316 flame spread and protection
Foam thermal barrier
R316.4 separates foam from interior

Renovation vs Abatement

Covered renovation

  • Paint disturbance during improvement work
  • EPA renovation certification rules

Abatement

  • Designed to permanently eliminate hazards
  • Separate lead activity requirements

Identify the project purpose

Trade and Safety Lookup

  1. Electrical code question→Minnesota Rules 1315
  2. Plumbing code question→Minnesota Rules 4714
  3. Dwelling mechanical ventilation question→Minnesota Rules 1322 or 1346(See R303.4)
  4. Covered pre-1978 renovation→Verify lead certification(Check federal exemptions first)

Trade Code Map

Electrical
Minnesota Rules chapter 1315
Plumbing
Minnesota Rules chapter 4714
Mechanical and fuel gas
Minnesota Rules chapter 1346
Dwelling ventilation
R303.4 refers to 1322 or 1346
Residential energy
Minnesota Rules chapter 1322
Mechanical ventilation details
R403.5 dwelling ventilation systemsEnergy code

Lead-Safe Renovation

Covered pre-1978 residential renovation
Check lead certification and exemptions
State lead statute
§326B.106 subdivisions 13 and 14
Permit qualification check
Municipality verifies required lead certification
EPA renovation firm
Firm certification for covered work
Certified renovator
Trained individual oversees lead-safe practices
Work area containment
Keep dust within work area
Cleanup and verification
Remove debris and verify cleaning

Warranty 1–2–10

One workmanship, two systems, ten major defects

New-home covered defectsTime from warranty date

QB Registration vs BC License

QB registration

  • Individual qualifying person
  • Tracks continuing education

BC license

  • Business authorization
  • New and existing residential structures

Use QB to apply for BC

Licensing Decisions

  1. Direct owner contract, new dwelling→Check BC license scope(Multiple special skills)
  2. Direct owner contract, existing dwelling→Check BC or CR scope(Multiple special skills)
  3. Direct owner contract, roofing only→Check BC, CR, or RR
  4. Contracting through a general contractor→Check contractor registration(Confirm applicable exemptions)
  5. Residential receipts below $15,000→Check Certificate of Exemption(Use gross annual receipts)
  6. Qualifying person passed QB→Apply for business BC license(Use individual QB number)

Residential License Scope

BC business license
New construction and existing work
CR business license
Existing structures only
RR business license
Roofing scope only
Residential real estate
One to four dwelling units
Direct owner contract
Generally license multiple special skills
One nonroofing special skill
Check registration and trade rules
Commercial contracting
Check contractor registration and local rules
Gross receipts exemption
Below $15,000 annually with certificate
Roofing-only owner contract
BC, CR, or RR license
Residential resale or speculation
Owner-builder generally needs license

Lien 45–120–1

First furnish, last furnish, last item

45 days: covered subcontractor notice120 days: record and serve1 year: assert lien in court

Prime vs Subcontractor Lien Notice

Covered prime contractor

  • Contracts directly with owner
  • Notice in written contract

Covered subcontractor

  • Works through another contractor
  • 45 days after first furnishing

Identify who contracted with owner

Contract and Lien Decisions

  1. Owner contract uses subs or suppliers→Add statutory notice to contract(Check §514.011 exceptions)
  2. Covered prime has oral agreement→Serve notice within 10 days(Check statutory applicability)
  3. Subcontractor first furnishes work→Calendar 45-day owner notice(Check §514.011 exceptions)
  4. Last lienable item furnished→Calendar recording and service(Both within 120 days)
  5. Enforcing recorded lien→File complaint or answer(Within one year of last item)
  6. Covered warranty defect reported→Inspect within 30 days(Written offer follows inspection)

Eight Special Skills

Excavation
Trenching and grading
Masonry and concrete
Footings and foundation walls
Carpentry
Framing, windows, deck framing
Interior finishing
Cabinets, flooring, insulation
Exterior finishing
Siding, gutters, soffit, fascia
Drywall and plaster
Taping and finishing
Roofing
Roof coverings and sheathing
General installation specialties
Garage doors, pools, paving

Qualifying Person and Renewal

Qualifying builder
QB exam for BC license
Qualifying remodeler
QC exam for CR license
Qualifying roofer
QR exam for RR license
Managing employee qualifier
Actively engaged company employee
Shared qualifying person
25% common ownership plus eligibility
Qualifying person registration
Individual Q number after passing
Q registration term
Two years from passing date initially
Q renewal education
14 approved hours per cycle
Required CE topics
1 hour energy, 1 business hour
Exam retake
Reapply 30 days after results
Business license renewal
Separate March 31 expiration cycle

Contracts and Insurance

Residential written contract
Work, materials, price or pricing basis
Change order
Written, signed and dated
Required commercial general liability
Premises, operations, products, completed operations
Combined liability policy option
$300k occurrence and aggregate minimums
Workers’ compensation
Submit compliance documentation
Residential roofer bond
$15,000 minimum
Contractor Recovery Fund
Eligible residential customer losses
Covered insurance-funded contract
Cancel within 72 hours of notificationInsurer denies claim
Performance guidelines
Provide before agreement and incorporate
License number display
Advertisements, permits, and licensed contracts
Contractor transaction records
Keep ≥3 years after completion

Statutory Home Warranties

New home workmanship or materials
1 year for covered defects
New home system installation
2 years for covered defects
New home major construction defects
10 years for covered defects
Home improvement work
Match coverage to §327A.02 subd. 3
Written warranty notice
Within 6 months of discoveryActual notice exception
Inspection after notification
Within 30 days
Written repair offer
Within 15 days after inspection
New home warranty begins
Earlier of first occupancy or title
Improvement warranty begins
When improvement work is completed

Mechanics Lien Timeline

Prime using subs or suppliers
Required notice in written contract
No written contract
Prime notice within 10 daysAfter work agreement
Subcontractor notice
Within 45 days of first furnishing
Lien statement deadline
120 days after last contribution
Preserve lien
Record and serve lien statement
Enforce lien
Within one year of last item
Prelien notice exceptions
See §514.011 subdivisions 4a–4c

Common Traps

Provided References

Open-book exam ≠ Bring-your-own references

Exam and License

QB qualifying registration ≠ BC business license

Remodeler Scope

Existing structure remodel ≠ New detached garage

Licensing Units and Code Scope

One-to-four-unit licensing definition ≠ Residential code building scope

Window Fall Protection

Current 24-inch interior exemption ≠ Printed 36-inch sill language

Roofing Special Skill

Roof covering work ≠ Gutter and soffit installation

Notice Clocks

45 days from first furnishing ≠ 120 days from last furnishing

Warranty Clock

Years from warranty date ≠ Months from defect discovery

Last Minute

  1. 1.QB qualifies for BC application
  2. 2.DLI supplies both exam references
  3. 3.110 questions in 330 minutes
  4. 4.Select the requested answer count
  5. 5.Apply Minnesota amendments to IRC
  6. 6.Find escape openings under R310
  7. 7.Find deck attachment under R507.9
  8. 8.Check current window protection statute
  9. 9.Check lead rules before renovation
  10. 10.Record AND serve lien statement
  11. 11.Match warranty duration to defect
  12. 12.Budget three minutes per question
Same family resources

Explore More General Contractor License

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.