TermClick to flip

What is optimum moisture content in a soil compaction test?

Tap to reveal definition
Card 1 of 50Sitework

Filter by Topic

Jump to Card

About These AZ General Contractor Flashcards

These 50 flashcards are designed to help you memorize key terms and definitions for the Arizona General Contractor License Exam (Commercial and Dual Trade). Each card shows a term on the front and its definition on the back—the classic flashcard format for vocabulary memorization. Use these alongside our practice questions to build both recall and comprehension.

Topics Covered

Sitework5 cards
Concrete7 cards
Masonry5 cards
Metals7 cards
Carpentry6 cards
Thermal and Moisture Protection5 cards
Doors and Windows2 cards
Finishes3 cards
Safety6 cards
General Building Code4 cards

Complete Flashcard Reference

Review every term in this set. Open any term to reveal its definition.

What is optimum moisture content in a soil compaction test?

It is the moisture content at which the soil reaches its highest dry density for the specified compactive effort. A different compaction effort can change the result.

Field dry density is 114 pcf and the lab maximum is 120 pcf. What is the relative compaction?

95%. Divide the field dry density by the laboratory maximum dry density, then multiply by 100. Compare that percentage with the project specification.

What must you do about buried utilities before opening an excavation?

Identify the estimated locations of utilities you could encounter and contact the utility owners before digging. As work approaches an estimated location, determine the exact location by safe means.

How do erosion controls and sediment controls differ?

Erosion controls, such as mulch, keep soil from being dislodged. Sediment controls, such as a silt fence, capture soil that runoff is already carrying.

The finished grade drops 6 inches over a horizontal run of 10 feet. What is the percent slope?

5%. Convert 10 feet to 120 inches, then divide the 6-inch drop by 120 inches and multiply by 100.

What does a conventional concrete slump test measure?

It measures the consistency of fresh concrete by how far the sample settles after the cone is lifted. Compressive strength is measured by a separate test.

What must be checked before adding water to ready-mixed concrete at the jobsite?

Confirm the project permits the addition and that the adjusted mix will stay within its slump and water limits. Excess water can reduce strength and durability.

Why does concrete need curing after placement?

Managing moisture and temperature allows cement hydration to continue. That improves strength and durability and limits the effects of early drying.

What does a contraction joint do in a concrete slab?

It creates a weakened plane where shrinkage cracking can occur in a planned location. Place and time the joints according to the slab detail and conditions.

How much concrete is in a 15 ft × 18 ft slab that is 4 inches thick, before waste?

3⅓ cubic yards. Convert 4 inches to ⅓ foot. The slab is 15 × 18 × ⅓ = 90 cubic feet. Divide by 27 to get cubic yards.

Why maintain the specified concrete cover over reinforcing bars?

Cover helps protect the steel from its exposure environment. Use the specified distance from the concrete surface to the nearest reinforcement surface and maintain it during placement.

Which concrete cylinders are generally used for specified-strength acceptance?

Standard-cured cylinders are used for acceptance testing. Field-cured cylinders help estimate how the concrete in the structure is developing strength under jobsite conditions.

What is the job of mortar in a concrete masonry wall?

Mortar beds and bonds the units at their joints. Grout fills designated spaces or cells and bonds to any reinforcing steel inside.

What makes a masonry course a bond beam?

It contains horizontal reinforcement embedded in grout. The reinforced course ties the wall together and can transfer loads as detailed.

What does a masonry lintel do above an opening?

It spans the opening and transfers the load above it to bearing on each side. The window or door frame can then serve its intended function.

Why are control joints placed in concrete masonry walls?

They accommodate drying shrinkage so movement occurs at planned locations. Their placement and reinforcement detailing follow the project design.

How do flashing and weeps work together in a masonry wall?

Flashing collects water inside the wall and directs it to the exterior. Weeps provide outlets at the flashing so trapped water can drain.

How does a steel column base plate transfer gravity load?

It spreads column compression over a bearing area on the supporting concrete. The bearing surface and grout beneath the plate must provide the specified support.

Who must approve a field modification to a steel column anchor rod?

The project structural engineer of record must approve repairs, replacements, or field modifications under OSHA § 1926.755(b). Bring the discrepancy to that engineer before altering the rod.

What is the role of bridging in an open-web steel joist system?

Bridging provides lateral restraint to the joists. Follow the erection details and OSHA requirements for when bridging must be installed and secured.

When does steel deck act as a diaphragm?

When detailed and attached as a diaphragm, the deck and its connections transfer in-plane forces to the building’s lateral-resisting system.

What changes when a bolted steel joint requires pretensioning?

The specified installation method must develop a prescribed minimum bolt tension. Snug tightening brings connected plies into firm contact and is the starting condition for pretensioning.

What is the difference between steel shop drawings and erection drawings?

Shop drawings describe how individual pieces are fabricated. Erection drawings identify where those pieces go and how the assembly is arranged in the field.

Why are headed shear studs installed on a composite steel beam?

They transfer horizontal shear across the steel–concrete interface. This lets the beam and concrete slab act together in bending.

What makes a load path continuous in a wood-framed building?

Connected members and fasteners carry forces from where they act, such as the roof, through the walls and into the foundation. A missing connection breaks the path.

What does a header above a framed opening do?

It carries the load across the opening to supports at each end, commonly jack studs. Size and bearing depend on the loads, span, and framing details.

How do you read a 32/16 span rating on APA Rated Sheathing?

The first number is the maximum roof-support spacing and the second is the maximum subfloor-support spacing, in inches on center, under the rating’s installation conditions.

Why does APA recommend a gap at wood structural panel ends and edges?

The gap allows the panels to expand as their moisture content rises. Tight joints can contribute to buckling. Follow the panel manufacturer’s spacing instructions.

Where can a service opening go in a wood I-joist?

Locate and size holes in the web using the specific manufacturer’s hole chart. Keep both flanges intact.

What does a rim board do at the edge of an engineered wood floor?

It closes the joist ends and helps transfer bearing-wall loads across the floor depth to the supporting wall or foundation. It also provides edge restraint for the joists.

What distinguishes an air barrier from a vapor retarder?

An air barrier limits airflow through the assembly. A vapor retarder limits water vapor diffusion through materials. One layer can serve both roles if it meets both requirements.

How does continuous exterior insulation reduce thermal bridging?

It covers framing members that would otherwise conduct heat around the cavity insulation. This reduces the impact of the studs on overall wall heat flow.

How should water-resistive barrier layers overlap behind siding?

Lap the upper layer over the lower layer so water drains toward the exterior. Reverse laps can funnel water behind the drainage plane.

Why place a capillary break below a slab on ground?

It interrupts liquid water movement from the soil into the slab. A free-draining, coarse aggregate layer can provide this break.

What does the underlayment do beneath asphalt shingles?

It provides a secondary drainage layer over the roof deck if water gets past the shingles. The roof covering and underlayment work together to shed water.

What does a window sill pan do?

It catches water that reaches the rough sill and directs it outward. Lap it over the wall drainage plane below and preserve the intended drainage path.

Why check door hardware against the fire door assembly listing?

A rated opening depends on the complete assembly, including the door, frame, and hardware. Replacement hardware must be permitted for that assembly to preserve its rating.

What does Level 5 gypsum-board finishing add to Level 4?

A skim coat over the entire surface. It helps hide joints and fasteners under glossy finishes or strong light striking the wall at a shallow angle.

Why prime finished drywall before painting?

Drywall primer reduces the difference in absorption between the panel face and joint compound. That helps the paint dry with a more uniform appearance.

Why test a concrete slab for moisture before installing resilient flooring?

Moisture can damage the adhesive or flooring after installation. Compare results from the specified test method with the flooring and adhesive manufacturers’ limits.

At what height does OSHA’s general unprotected-edge rule require construction fall protection?

At 6 feet or more above a lower level under § 1926.501(b)(1). Some activities, including scaffold work, have separate rules.

When does OSHA’s scaffold standard trigger fall protection?

When an employee on a scaffold is more than 10 feet above a lower level. The type of scaffold determines the required means of protection.

When may workers enter an OSHA-covered excavation without a cave-in protective system?

When it is entirely in stable rock, or when it is less than 5 feet deep and a competent person finds no sign of a potential cave-in.

What safe-exit rule applies to trenches at least 4 feet deep?

Provide a ladder, stairway, ramp, or another safe means of exit. Place it so employees travel no more than 25 feet laterally to reach it.

How far out should the foot of an ordinary non-self-supporting ladder be set?

About one-quarter of its working length from the upper support, measured horizontally. Working length is the distance along the ladder from its foot to that support.

When can OSHA Table 1 be used for construction silica exposure control?

For a task listed in Table 1, fully implement its specified controls, work practices, and respiratory protection. Unlisted tasks or incomplete controls follow the standard’s alternative exposure-control requirements.

Under the 2018 IBC, what occupancy group generally applies to an ordinary office?

Group B, Business. Occupancy is based on how the space is used, and it helps determine applicable building and life-safety requirements.

What does 2018 IBC Table 601 tell you about a construction type?

It gives the required fire-resistance ratings for building elements by construction type, including structural frames, bearing walls, floors, and roofs.

What are the three parts of a means of egress, in order?

Exit access leads to an exit. The exit leads to the exit discharge, which provides a route to a public way.

Who generally engages the approved agency for IBC special inspections?

The owner or the owner’s authorized agent, subject to the code’s exceptions. The agency verifies specified work or materials that require special inspection.

Frequently Asked Questions

Which Arizona license classifications share this PSI trade exam?

B-1 General Commercial, B-2 General Small Commercial, KB-1 Dual Building, and KB-2 Dual Residential and Small Commercial share one PSI trade exam. Arizona uses a separate trade exam for the B General Residential, B-3, and CR-61 group.

What is the format and passing score for the combined trade exam?

The outline lists 100 scored questions, 240 minutes, and a 70% passing score. PSI may include 5–10 additional unscored questions within the same time. AZ ROC does not publish a cohort pass rate.

Which references can I bring to a PSI test center for this exam?

The outline allows the 2018 International Building Code, the 2018 International Residential Code, and an approved version of OSHA’s 29 CFR Part 1926. PSI allows permanent tabs and requires printed downloads to be bound. Use the listed code editions when studying for the exam.

How do the Statutes and Rules Exam and NASCLA fit into Arizona licensing?

Arizona’s Statutes and Rules Exam (SRE) is an online course and exam through GMetrix. AZ ROC accepts NASCLA Commercial General Building exam credit toward the trade requirement for B-1, B-2, KB-1, and KB-2. Passing NASCLA leaves any applicable Arizona SRE requirement in place.

When may a qualifying party be eligible for an exam waiver?

Arizona law provides a waiver for a current or former qualifying party on an Arizona license in the same classification within the preceding five years. AZ ROC may waive the trade exam for someone who served as a qualifying party in the same or a comparable classification in another state within that period and meets the conditions in A.A.C. R4-9-106(E).

How long do I wait after failing the PSI trade exam?

Wait 30 calendar days after the first or second failure and 90 days after the third or any later failure. GMetrix’s SRE course includes one final-exam attempt per purchase.