Legislation and Work Limits
Not publishedof exam
Wiring Rules and Installation
Not publishedof exam
Testing and Safe Work
Not publishedof exam
Certification and Connection
Not publishedof exam
Companion Standards and Codes
Not publishedof exam
Quick Facts
- Exam
- Electrician Regulations
- Format
- Open-book multiple choice
- Delivery
- Aspeq testing venues
- Prescription
- November 2026, version 1
- Minimum pass mark
- 60 (EWRB written exam)
- References
- Follow Aspeq booking instructions
- Booking ID
- Electrical Worker (EW) number
- Fee
- NZ$149.50 + GST
- Results
- Within 24 hours
- Retake trigger
- Three failures within three months
- Stand-down
- Three months from third failure
- Length and item count
- Check Aspeq sitting details
Find the Governing Rule
Schedule 1 defines, r6A classifies, Schedule 2 cites
Registration vs Practising Licence
Registration
- Identifies class
- Defines work limits
Practising licence
- Current authority to practise
- Work within class and competence
Check both before accepting PEW
Risk Picker
- Work described in Schedule 1→Check clause 2 exclusions(ESR r6)
- Fitting replacement in existing installation→Check low-risk criteria(ESR r6A(1))
- Ordinary new socket circuit→General PEW(Issue CoC)
- Mains or new PV work→High-risk PEW(Check work authorisation)
- New hazardous-area installation work→High-risk PEW(Check endorsement and inspection)
- Homeowner-occupier exemption claimed→Act s79 and ESR r57(Apply NZECP 51)
Legal Map
- Electricity Act 1992
- Registration and PEW authorityB
- ESR 2010
- Electricity (Safety) Regulations 2010A
- ESR r5
- Electrically safe and unsafe
- ESR r13
- Keep electrical work safe
- ESR r17
- Electrical safe distances
- ESR r19
- Report immediate danger to WorkSafe
- ESR Schedule 1
- PEW inclusions and exclusions
- ESR Schedule 2
- Cited standards and codes
- ESR Schedule 4
- Fitting and appliance standards
PEW Risk
- ESR r6
- Check Schedule 1 first
- ESR r6A
- Classify covered PEW by risk
- Low risk
- Existing fitting maintenance or replacement
- Replacement-related conductor change
- May qualify as low risk
- General risk
- Remaining installation PEW under r6A
- Ordinary new socket circuit
- Typically general risk
- Mains work
- High risk
- PV installation work
- New installation or settings adjustmentHigh risk
- New hazardous-area installation work
- High risk
- New mains parallel generation work
- High risk
- LV/ELV non-Part 2 installation
- High risk when installing or adjusting
Part 1 vs Part 2
Part 1
- Essential safety requirements
- Certified design route where permitted
Part 2
- Detailed installation practices
- Mandatory in specified cases
Check ESR r59–61 first
Design Route Picker
- New domestic within r59(1) limits→AS/NZS 3000 Part 2(Check demand per phase)
- Other LV/ELV installation→Part 2 or certified design(Check r60 overrides)
- Installation requires Part 2→Apply Part 2(Add cited companion if required)
- Part 1 certified design applies→ESR r58 and r61(Use specified verification)
- Repair of existing safe installation→Check ESR r59(3)(Check Schedule 1AA savings)
- New installation from 13 November 2026→Use updated cited standards(Check NZ modifications)
Applicable Wiring Rules
- Cited Wiring Rules
- AS/NZS 3000:2018 + A1–A3
- NZ modifications
- Check ESR Schedule 2
- General transition ended
- 12 November 2026
- New work from 13 November 2026
- Use updated cited edition
- Qualifying pre-13 November 2025 work
- Check Schedule 1AA savings
- Safe existing installations
- Check repair and savings rules
- PEN
- Protective earth and neutral conductor
- PEN switching prohibition
- Restored 2 October 2026
- CoC edition entry
- Record year and amendments used
- Exam reference editions
- Check Aspeq booking instructions
Basic vs Fault Protection
Basic protection
- Normal conditions
- Insulation or barriers
Fault protection
- Single fault conditions
- Earthing and automatic disconnection
Identify the contact scenario
Wiring Rule Lookups
- Part 1
- Essential safety requirements
- Part 2
- Deemed-to-comply installation methods
- Section 2
- Circuit control and protection
- Section 3
- Wiring systems
- Section 4
- Selection and installation of equipment
- Section 5
- Earthing and bonding
- Section 6
- Damp situations
- Section 7
- Special installations
- Section 8
- Inspection and testing
- ESR r59 domestic threshold
- Maximum demand per phase
- Single-phase threshold
- ≤80 A per phaser59(1)
- Multiphase threshold
- ≤50 A per phaser59(1)
Earthing and Protection
- MEN
- Multiple earthed neutral
- MEN link
- Neutral-to-earth connection at main switchboard
- Protective bonding
- Limits hazardous potential differences
- Basic protection
- Guards against contact with live parts
- Fault protection
- Addresses exposed parts becoming live
- RCD
- Residual current device
- Residual current
- Imbalance in monitored conductors
- Circuit breaker
- Overload and short-circuit protection
- RCBO
- Residual-current and overcurrent protection
- Shock versus property RCDs
- Check applicable ESR r24 criteria
- Installation shock-protection RCD types
- A, F or BSchedule 2
- RCD selection
- Match loads and fault waveformsSchedule 2
Cable and Load
- Maximum demand
- Design load under applicable method
- Cable selection
- AS/NZS 3008.1.2 NZ conditions
- Current capacity
- Account for installation and derating
- Voltage drop
- Point of supply to load
- Cable route
- Assess heat and mechanical damage
- Short-circuit withstand
- Check thermal withstand
- Earth fault loop
- Check protective device disconnection
- Board markings
- Identify circuits and isolation points
Prove Test Prove
Prove the tester, test, prove the tester again
Residual vs Overcurrent Protection
RCD function
- Detects current imbalance
- Residual-current protection
Breaker function
- Detects excess circuit current
- Overload and short-circuit protection
An RCBO combines both functions
Test Selection
- Before electrical verification→Visual inspection(AS/NZS 3000 Section 8)
- Check protective earth path→Earth continuity test
- Check insulation condition→Insulation resistance test(Use applicable equipment exceptions)
- Check active switching and termination→Polarity test
- Check conductors belong together→Correct circuit connections
- Check automatic fault disconnection→Earth fault loop impedance(Calculate where permitted)
- Check residual protection operates→RCD operation test(Apply device-specific limits)
Safe Isolation
- AS/NZS 4836
- Safe work on or near LV
- Isolation scope
- Identify every possible supply
- Backfeed
- Check alternate sources
- Lock and tag
- Secure against unintended re-energisation
- First prove
- Prove tester on known source
- Test for dead
- Check relevant conductors before touch
- Second prove
- Recheck tester on known source
- PPE
- Match protection to the hazard
- Live work default
- Isolate before work
Polarity vs Circuit Connections
Polarity
- Check correct conductor terminals
- Confirm active switching
Circuit connections
- Check associated active and neutral
- Check neutral and earth arrangement
Verify both before energising
Section 8 Verification
- Visual inspection
- Check installation before electrical tests
- Earth continuity
- Verify protective earthing path
- Insulation resistance
- Check insulation integrity
- Polarity
- Verify active and neutral placement
- Correct circuit connections
- Check arrangement and conductor association
- Earth fault loop impedance
- Verify disconnection conditions
- Loop impedance calculation
- Permitted in some situations
- RCD operation test
- Measure trip time and verify function
- RCD verification in NZ
- Check applicable DC leakage testsSchedule 2
- ESR r63
- LV/ELV installation PEW testing
- ESR r64
- HV installation PEW testing
- AS/NZS 3017
- Installation verification methods
- RCD integral test button
- Supplementary checkNZ modification
Work Inspection Use
CoC covers work, RoI inspection, ESC safe use
CoC vs ESC
CoC
- Certifies prescribed work
- Lawful and safe work
ESC
- Certifies installation safety
- After connection where applicable
Work compliance and safe use
Paperwork Picker
- Low-risk installation PEW→CoC optional(Testing still applies)
- General installation PEW→Issue CoC(Check maintenance system exception)
- High-risk installation PEW→CoC and independent RoI(Check r71 conflicts)
- Installation ready for connection→Check r73A requirements(Sight required current documents)
- Installation connected after PEW→Issue ESC where required(Check ESR r74B exception)
- High-risk inspection recorded→Inspector lodges details(Within 20 working days)
- Reconnecting after over six months→AS/NZS 3019 certificate(No general or high-risk PEW)
Evidence Chain
- CoC
- Certificate of Compliancer65–68
- CoC declaration
- Work lawfully and safely done
- Low-risk CoC
- Optional under r65(2)
- General PEW
- CoC before treated as complete
- High-risk PEW
- CoC and required RoI
- RoI
- Record of Inspectionr72
- RoI sign-off
- Authorised independent inspector
- Connection checks
- Apply ESR r73A before energising
- MEN supply connection
- Verify main earthing system
- ESC
- Electrical Safety Certificater74A
- ESC declaration
- Installation safe to use
- Maintenance management system
- Check CoC and ESC exceptions
- LV supply checks
- Polarity, phase rotation, rating, compatibilityr73A
- Tests by another worker
- Sight signed tests and resultsr73A
Count the Clock
CoC calendar days, RoI and ESC working days
Inspection vs Testing
Statutory inspection
- High-risk PEW
- Independent authorised inspector
Installation testing
- Checks operational electrical safety
- Applies across PEW risk classes
High risk adds independent inspection
Document Deadlines
- CoC copy
- 20 calendar days from completionr74E
- RoI copy
- 20 working days from issuer72A
- ESC issue after connection
- Promptly, maximum 20 working daysr74C
- ESC copy
- 20 working days from issuer74G
- High-risk database entry
- 20 working days from RoIr74F
- CoC, RoI and ESC retention
- At least seven years
- Specified copy requests
- 10 working days from request
- Required CoC at connection
- Issued within previous six monthsr73A
- Sighted RoI at connection
- Issued within previous six monthsr73A
- Non-consented small stand-alone dwelling
- CoC and ESC to owner
Verification Certificate vs Fitness Warrant
Verification certificate
- Certain reconnections after extended disconnection
- AS/NZS 3019 Section 3
Fitness warrant
- Required supply condition
- Connectable installations
Check ESR r74 or r76–78
Reference Picker
- Working near overhead lines→NZECP 34(Check distance context)
- Recessed luminaire installation→NZECP 54(EWRB knowledge level B)
- Construction site power→AS/NZS 3012(Use with Wiring Rules)
- In-service portable equipment→AS/NZS 3760(Check applicable inspection interval)
- Electrical equipment after repair→AS/NZS 5762(ESR r90)
- Second-hand equipment for sale→AS/NZS 5761(Check product scope)
Electrical Codes
- NZECP
- New Zealand Electrical Code of Practice
- NZECP 34
- Electrical safe distancesA
- NZECP 54
- Recessed luminaires and auxiliary equipmentB
- NZECP 50
- Domestic appliance repairs by owner
- NZECP 51
- Homeowner-occupier domestic wiring
- NZECP 60
- LV AC railway signalling testing
Installation Standards
- AS/NZS 3012
- Construction and demolition sitesC
- AS/NZS 3019
- Periodic assessment of electrical installationsC
- AS/NZS 3001.1
- Sites supplying connectable installations
- AS/NZS 3001.2
- Connectable installations such as caravans
- AS/NZS 3003
- Patient-area electrical installations
- AS/NZS 60079.14
- Hazardous-area electrical installations
- AS/NZS 5033
- Photovoltaic array installation and safety
- AS/NZS 4777.1
- Grid-connected inverter installation requirements
Appliance Standards
- AS/NZS 3760
- In-service equipment testing and taggingB
- AS/NZS 5761
- Second-hand equipment before saleB
- AS/NZS 5762
- Electrical equipment after repairB
- ESR r26
- In-service appliance safety pathway
- ESR r90
- Testing after certain appliance work
- Fit-for-purpose instrument
- Match instrument to test
Common Traps
Fixed wiring risk
Existing socket replacement ≠ Ordinary new socket circuit
Authorisation
Registration class ≠ Current practising licence
Editions
Current field citation ≠ Aspeq permitted exam edition
Earthing verification
Earth continuity test ≠ Earth fault loop impedance
RCD evidence
Built-in test button ≠ Required trip-time and function tests
Independence
Worker’s own tests ≠ Independent high-risk inspection
Document clocks
CoC copy from completion ≠ ESC copy from issue
Connection documents
r73A pre-connection checks ≠ r74A electrical safety certification
Last Minute
- 1.Confirm Aspeq’s permitted reference editions
- 2.Find PEW exclusions in Schedule 1
- 3.Classify PEW with ESR r6A
- 4.Check Wiring Rules’ NZ modifications
- 5.Secure isolation and prove–test–prove
- 6.Use AS/NZS 3000 Section 8
- 7.High-risk PEW requires independent inspection
- 8.CoC copy 20 days after completion
- 9.ESC within 20 working days post-connection
- 10.High-risk lodgement ≤20 working days post-RoI
- 11.Retain CoC, RoI, ESC seven years
- 12.Check r73A before connecting supply