Cheat sheet

NZ EWRB Electrician Regulations Cheat Sheet

Quick Facts

Exam
Electrician Regulations
Format
Open-book multiple choice
Delivery
Aspeq testing venues
Prescription
November 2026, version 1
Minimum pass mark
60 (EWRB written exam)
References
Follow Aspeq booking instructions
Booking ID
Electrical Worker (EW) number
Fee
NZ$149.50 + GST
Results
Within 24 hours
Retake trigger
Three failures within three months
Stand-down
Three months from third failure
Length and item count
Check Aspeq sitting details

Find the Governing Rule

Schedule 1 defines, r6A classifies, Schedule 2 cites

Schedule 1 → is it PEW?Regulation 6A → which risk?Schedule 2 → which edition?

Registration vs Practising Licence

Registration

  • Identifies class
  • Defines work limits

Practising licence

  • Current authority to practise
  • Work within class and competence

Check both before accepting PEW

Risk Picker

  1. Work described in Schedule 1→Check clause 2 exclusions(ESR r6)
  2. Fitting replacement in existing installation→Check low-risk criteria(ESR r6A(1))
  3. Ordinary new socket circuit→General PEW(Issue CoC)
  4. Mains or new PV work→High-risk PEW(Check work authorisation)
  5. New hazardous-area installation work→High-risk PEW(Check endorsement and inspection)
  6. Homeowner-occupier exemption claimed→Act s79 and ESR r57(Apply NZECP 51)

Work Authority

PEW
Prescribed electrical work
EWRB registration
Class and work limits
Practising licence
Current authority within work limits
Competence
Stay within actual capability
Base Electrician supervision
Up to two at once2025 Notice
Endorsed supervision
More than two at once
Restricted settings
Check relevant endorsed class
Trainee Limited Certificate
Supervised trainee work
NZ experience pathway
Three practical assessment stages
Domestic wiring exemption
Act s79 and ESR r57
New Electrician applicants
2025 Notice from 1 September 2026
Existing Electrician holders
2025 Notice at qualifying renewal
Base class inspection
Requires separate inspection authority2025 Notice

PEW Risk

ESR r6
Check Schedule 1 first
ESR r6A
Classify covered PEW by risk
Low risk
Existing fitting maintenance or replacement
Replacement-related conductor change
May qualify as low risk
General risk
Remaining installation PEW under r6A
Ordinary new socket circuit
Typically general risk
Mains work
High risk
PV installation work
New installation or settings adjustmentHigh risk
New hazardous-area installation work
High risk
New mains parallel generation work
High risk
LV/ELV non-Part 2 installation
High risk when installing or adjusting

Part 1 vs Part 2

Part 1

  • Essential safety requirements
  • Certified design route where permitted

Part 2

  • Detailed installation practices
  • Mandatory in specified cases

Check ESR r59–61 first

Design Route Picker

  1. New domestic within r59(1) limits→AS/NZS 3000 Part 2(Check demand per phase)
  2. Other LV/ELV installation→Part 2 or certified design(Check r60 overrides)
  3. Installation requires Part 2→Apply Part 2(Add cited companion if required)
  4. Part 1 certified design applies→ESR r58 and r61(Use specified verification)
  5. Repair of existing safe installation→Check ESR r59(3)(Check Schedule 1AA savings)
  6. New installation from 13 November 2026→Use updated cited standards(Check NZ modifications)

Applicable Wiring Rules

Cited Wiring Rules
AS/NZS 3000:2018 + A1–A3
NZ modifications
Check ESR Schedule 2
General transition ended
12 November 2026
New work from 13 November 2026
Use updated cited edition
Qualifying pre-13 November 2025 work
Check Schedule 1AA savings
Safe existing installations
Check repair and savings rules
PEN
Protective earth and neutral conductor
PEN switching prohibition
Restored 2 October 2026
CoC edition entry
Record year and amendments used
Exam reference editions
Check Aspeq booking instructions

Basic vs Fault Protection

Basic protection

  • Normal conditions
  • Insulation or barriers

Fault protection

  • Single fault conditions
  • Earthing and automatic disconnection

Identify the contact scenario

Wiring Rule Lookups

Part 1
Essential safety requirements
Part 2
Deemed-to-comply installation methods
Section 2
Circuit control and protection
Section 3
Wiring systems
Section 4
Selection and installation of equipment
Section 5
Earthing and bonding
Section 6
Damp situations
Section 7
Special installations
Section 8
Inspection and testing
ESR r59 domestic threshold
Maximum demand per phase
Single-phase threshold
≤80 A per phaser59(1)
Multiphase threshold
≤50 A per phaser59(1)

Earthing and Protection

MEN
Multiple earthed neutral
MEN link
Neutral-to-earth connection at main switchboard
Protective bonding
Limits hazardous potential differences
Basic protection
Guards against contact with live parts
Fault protection
Addresses exposed parts becoming live
RCD
Residual current device
Residual current
Imbalance in monitored conductors
Circuit breaker
Overload and short-circuit protection
RCBO
Residual-current and overcurrent protection
Shock versus property RCDs
Check applicable ESR r24 criteria
Installation shock-protection RCD types
A, F or BSchedule 2
RCD selection
Match loads and fault waveformsSchedule 2

Cable and Load

Maximum demand
Design load under applicable method
Cable selection
AS/NZS 3008.1.2 NZ conditions
Current capacity
Account for installation and derating
Voltage drop
Point of supply to load
Cable route
Assess heat and mechanical damage
Short-circuit withstand
Check thermal withstand
Earth fault loop
Check protective device disconnection
Board markings
Identify circuits and isolation points

Prove Test Prove

Prove the tester, test, prove the tester again

Known source firstTest before touchRecheck tester afterwards

Residual vs Overcurrent Protection

RCD function

  • Detects current imbalance
  • Residual-current protection

Breaker function

  • Detects excess circuit current
  • Overload and short-circuit protection

An RCBO combines both functions

Test Selection

  1. Before electrical verification→Visual inspection(AS/NZS 3000 Section 8)
  2. Check protective earth path→Earth continuity test
  3. Check insulation condition→Insulation resistance test(Use applicable equipment exceptions)
  4. Check active switching and termination→Polarity test
  5. Check conductors belong together→Correct circuit connections
  6. Check automatic fault disconnection→Earth fault loop impedance(Calculate where permitted)
  7. Check residual protection operates→RCD operation test(Apply device-specific limits)

Safe Isolation

AS/NZS 4836
Safe work on or near LV
Isolation scope
Identify every possible supply
Backfeed
Check alternate sources
Lock and tag
Secure against unintended re-energisation
First prove
Prove tester on known source
Test for dead
Check relevant conductors before touch
Second prove
Recheck tester on known source
PPE
Match protection to the hazard
Live work default
Isolate before work

Polarity vs Circuit Connections

Polarity

  • Check correct conductor terminals
  • Confirm active switching

Circuit connections

  • Check associated active and neutral
  • Check neutral and earth arrangement

Verify both before energising

Section 8 Verification

Visual inspection
Check installation before electrical tests
Earth continuity
Verify protective earthing path
Insulation resistance
Check insulation integrity
Polarity
Verify active and neutral placement
Correct circuit connections
Check arrangement and conductor association
Earth fault loop impedance
Verify disconnection conditions
Loop impedance calculation
Permitted in some situations
RCD operation test
Measure trip time and verify function
RCD verification in NZ
Check applicable DC leakage testsSchedule 2
ESR r63
LV/ELV installation PEW testing
ESR r64
HV installation PEW testing
AS/NZS 3017
Installation verification methods
RCD integral test button
Supplementary checkNZ modification

Work Inspection Use

CoC covers work, RoI inspection, ESC safe use

Compliance before connection when requiredHigh risk adds inspectionESC follows connection where applicable

CoC vs ESC

CoC

  • Certifies prescribed work
  • Lawful and safe work

ESC

  • Certifies installation safety
  • After connection where applicable

Work compliance and safe use

Paperwork Picker

  1. Low-risk installation PEW→CoC optional(Testing still applies)
  2. General installation PEW→Issue CoC(Check maintenance system exception)
  3. High-risk installation PEW→CoC and independent RoI(Check r71 conflicts)
  4. Installation ready for connection→Check r73A requirements(Sight required current documents)
  5. Installation connected after PEW→Issue ESC where required(Check ESR r74B exception)
  6. High-risk inspection recorded→Inspector lodges details(Within 20 working days)
  7. Reconnecting after over six months→AS/NZS 3019 certificate(No general or high-risk PEW)

Evidence Chain

CoC
Certificate of Compliancer65–68
CoC declaration
Work lawfully and safely done
Low-risk CoC
Optional under r65(2)
General PEW
CoC before treated as complete
High-risk PEW
CoC and required RoI
RoI
Record of Inspectionr72
RoI sign-off
Authorised independent inspector
Connection checks
Apply ESR r73A before energising
MEN supply connection
Verify main earthing system
ESC
Electrical Safety Certificater74A
ESC declaration
Installation safe to use
Maintenance management system
Check CoC and ESC exceptions
LV supply checks
Polarity, phase rotation, rating, compatibilityr73A
Tests by another worker
Sight signed tests and resultsr73A

Count the Clock

CoC calendar days, RoI and ESC working days

CoC copy from completionRoI copy from issueESC issue from connectionESC copy from issue

Inspection vs Testing

Statutory inspection

  • High-risk PEW
  • Independent authorised inspector

Installation testing

  • Checks operational electrical safety
  • Applies across PEW risk classes

High risk adds independent inspection

Document Deadlines

CoC copy
20 calendar days from completionr74E
RoI copy
20 working days from issuer72A
ESC issue after connection
Promptly, maximum 20 working daysr74C
ESC copy
20 working days from issuer74G
High-risk database entry
20 working days from RoIr74F
CoC, RoI and ESC retention
At least seven years
Specified copy requests
10 working days from request
Required CoC at connection
Issued within previous six monthsr73A
Sighted RoI at connection
Issued within previous six monthsr73A
Non-consented small stand-alone dwelling
CoC and ESC to owner

Verification Certificate vs Fitness Warrant

Verification certificate

  • Certain reconnections after extended disconnection
  • AS/NZS 3019 Section 3

Fitness warrant

  • Required supply condition
  • Connectable installations

Check ESR r74 or r76–78

Reference Picker

  1. Working near overhead lines→NZECP 34(Check distance context)
  2. Recessed luminaire installation→NZECP 54(EWRB knowledge level B)
  3. Construction site power→AS/NZS 3012(Use with Wiring Rules)
  4. In-service portable equipment→AS/NZS 3760(Check applicable inspection interval)
  5. Electrical equipment after repair→AS/NZS 5762(ESR r90)
  6. Second-hand equipment for sale→AS/NZS 5761(Check product scope)

Electrical Codes

NZECP
New Zealand Electrical Code of Practice
NZECP 34
Electrical safe distancesA
NZECP 54
Recessed luminaires and auxiliary equipmentB
NZECP 50
Domestic appliance repairs by owner
NZECP 51
Homeowner-occupier domestic wiring
NZECP 60
LV AC railway signalling testing

Installation Standards

AS/NZS 3012
Construction and demolition sitesC
AS/NZS 3019
Periodic assessment of electrical installationsC
AS/NZS 3001.1
Sites supplying connectable installations
AS/NZS 3001.2
Connectable installations such as caravans
AS/NZS 3003
Patient-area electrical installations
AS/NZS 60079.14
Hazardous-area electrical installations
AS/NZS 5033
Photovoltaic array installation and safety
AS/NZS 4777.1
Grid-connected inverter installation requirements

Appliance Standards

AS/NZS 3760
In-service equipment testing and taggingB
AS/NZS 5761
Second-hand equipment before saleB
AS/NZS 5762
Electrical equipment after repairB
ESR r26
In-service appliance safety pathway
ESR r90
Testing after certain appliance work
Fit-for-purpose instrument
Match instrument to test

Common Traps

Fixed wiring risk

Existing socket replacement ≠ Ordinary new socket circuit

Authorisation

Registration class ≠ Current practising licence

Editions

Current field citation ≠ Aspeq permitted exam edition

Earthing verification

Earth continuity test ≠ Earth fault loop impedance

RCD evidence

Built-in test button ≠ Required trip-time and function tests

Independence

Worker’s own tests ≠ Independent high-risk inspection

Document clocks

CoC copy from completion ≠ ESC copy from issue

Connection documents

r73A pre-connection checks ≠ r74A electrical safety certification

Last Minute

  1. 1.Confirm Aspeq’s permitted reference editions
  2. 2.Find PEW exclusions in Schedule 1
  3. 3.Classify PEW with ESR r6A
  4. 4.Check Wiring Rules’ NZ modifications
  5. 5.Secure isolation and prove–test–prove
  6. 6.Use AS/NZS 3000 Section 8
  7. 7.High-risk PEW requires independent inspection
  8. 8.CoC copy 20 days after completion
  9. 9.ESC within 20 working days post-connection
  10. 10.High-risk lodgement ≤20 working days post-RoI
  11. 11.Retain CoC, RoI, ESC seven years
  12. 12.Check r73A before connecting supply
Same family resources

Explore More New Zealand Trade Registration Exams

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.