Under G13/AS2 Table 2, what is the maximum discharge-unit loading for a DN100 drain laid at a gradient of 1:80?
Gradients Falls Invert Levels
Question · Hard
A DN150 foul-water drain has a calculated load of 600 discharge units. Under G13/AS2 Table 2, what is the flattest listed gradient that can carry that load?
Chapter 1: Foul-Water Drainage System Design
1.1 Separated Drainage Systems & Cross-Connection Prevention
Study guide
A DN100 drain is laid at 1 in 60 over a horizontal run of 30 m. What is the total fall?
Question · Medium
Trades Exam Prep Podcast
Listen on Spotify
Podcast
The invert of a drain is best described as which part of the pipe?
Question · Easy
Under G13/AS2, how must a non-vent connection enter a foul-water drain?
Foul Water Stormwater Drainage
For a new DN100 equal-junction installation in a graded drain, what minimum incline applies to the branch entry under G13/AS2?
1.2 Drain Layout, Junctions, Bends & Sweep Connections
When an unequal junction connects a smaller branch to a graded drain under the AS/NZS 3500.2 rules cited by G13/AS3, where must the smaller branch invert be?
Which NZ Building Code clause covers foul water (sanitary drainage)?
Nz Building Code
Which NZ Building Code clause governs the disposal of stormwater and surface water?
Which standard is cited by E1/AS2 as an Acceptable Solution for stormwater drainage?
1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG)
Why must foul-water and stormwater drainage systems generally be kept as separate systems in New Zealand?
Why does G13/AS2 require a housing gully trap to have a grating that allows surcharge?
What is the main purpose of a water seal in a trap on a sanitary drainage system?
Loss of a trap water seal caused by negative pressure drawing water out of the trap as a fixture discharges is known as what?
1.4 Boundary Connections, Inspection Shafts & Public Sewer Interface
What is the primary function of a ventilating (vent) pipe in a sanitary drainage system?
Under G13/AS1, what is the maximum developed length of the DN100 discharge pipe from the highest individual fixture connection to a stack before separate venting is required?
Under G13/AS1, what minimum diameter applies to a floor waste and its water trap, if a trap is used?
Inspection openings (IOs) and inspection points on a drain are provided primarily to do what?
Chapter 2: Drainage Ventilation & Commercial Waste Systems
2.1 Drainage Ventilation Systems, Relief Vents & Air Admittance Valves (AAVs)
Where would an inspection point or access junction typically be required on a drain run?
Which foul-water drain layout best follows G13/AS2 blockage-prevention principles?
Which manufacturing standard does G13/AS2 Table 1 list for PVC-U foul-water drainage pipe and fittings?
Pipe Materials Jointing
Which jointing method is used to permanently join uPVC DWV pipe and fittings?
2.2 Discharge Unit & Fixture Unit Sizing under G13/AS2 & AS/NZS 3500.2
What is the key advantage of a rubber-ring (elastomeric) joint over a solvent-cement joint in a buried drain?
Before solvent-cementing a uPVC DWV joint, the spigot and socket surfaces should be prepared by doing what?
Why is correct bedding and support of a buried drain important?
For G13/AS2 foul-water drain bedding, what is the maximum particle size for clean granular non-cohesive bedding material?
2.3 Commercial Grease Interceptors & Oil/Grit Separators
Where a buried drain passes under a trafficable area such as a driveway, the drainlayer should do what to protect it?
A drain is commonly proved watertight by which on-site test method?
Inspection Testing
In a hydrostatic water test of a section of drain, the test head is applied by doing what?
During a water test, a steady fall in the water level over the test period most likely indicates what?
2.4 Pumped Drainage Systems, Sumps & Rising Mains
What is the main advantage of an air test compared with a water test for a buried drain?
Modern condition assessment of an existing drain to locate cracks, root intrusion or displaced joints is best carried out using what?
Why should a new foul-water drain be tested before it is backfilled?
What is the purpose of an as-built drainage plan provided on completion of the work?
Chapter 3: Stormwater Drainage & Surface Water Management
3.1 Stormwater Sizing & Flow Calculations to AS/NZS 3500.3 & E1/AS1
A septic tank in an on-site wastewater system primarily provides what level of treatment?
On Site Wastewater Systems
Which standard governs the design and installation of on-site domestic wastewater management systems in New Zealand?
A conventional effluent disposal (soakage) trench works by doing what?
Before an on-site wastewater land-application system is sized, what must the site and soil assessment establish?