Core
25%of exam
Type I Small Appliances
25%of exam
Type II Medium to Very-High Pressure
25%of exam
Type III Low Pressure
25%of exam
Quick Facts
- Universal structure
- Core + I + II + III
- Question total
- 100
- Questions per part
- 25
- Closed-book passing
- 70%
- Mail-in Type I passing
- 84%
- Universal testing
- Closed-book and proctored
- Universal award
- Pass all four examinations
- Open-book Core
- Cannot count toward Universal
- Certifier
- EPA-approved organization
- Federal time limit
- Not specified
- Federal exam fee
- Not specified
- Credential validity
- Does not expire
- Primary rules
- 40 CFR Parts 82 and 84
Universal Four
Core | I | II | III
Open Core vs Universal Core
Open-book Core
- Type I pathway
- Mail-in option
- Cannot count Universal
Universal Core
- Closed-book
- Secure and proctored
- Counts toward Universal
Universal requires proctored Core
Certification Picker
- Small factory-charged appliance→Type I(Five pounds maximum)
- Medium through very-high pressure→Type II
- Low-pressure appliance→Type III
- All Section 608 types→Universal(All four proctored)
- Motor vehicle AC→Section 609
- Registered apprentice→Supervised exemption(Closely and continually)
Certification and Exam
- Test source
- EPA question bank
- Administrator
- EPA-approved certifying organization
- Universal questions
- One hundred total
- Core
- Twenty-five questions
- Type I
- Twenty-five questions
- Type II
- Twenty-five questions
- Type III
- Twenty-five questions
- Closed-book passing
- Seventy percent
- Mail-in Type I
- Eighty-four percent; not Universal
- Universal conditions
- Closed-book, secure, proctored
- Universal award
- Pass all four examinations
- Universal route
- One sitting or combined passes
- Combined-route condition
- Every counted part closed-book proctored
- Open-book Core
- Invalid toward Universal
- Expiration
- Credentials do not expire
- EPA card role
- Does not issue cards
- Time and fee
- Provider determines both
Three Rs
Recover | Recycle | Reclaim
Section 608 vs 609
Section 608
- Stationary appliances
- Types I through III
- Universal available
Section 609
- Motor vehicle AC
- Separate training and test
- MVAC refrigerants
Stationary versus motor vehicle
Service Practice Sequence
- Before connecting equipment→Identify refrigerant
- Opening the circuit→Recover required amount
- Large charge present→Recover liquid first
- Recovered refrigerant stays owner→Reuse permitted
- Refrigerant changes owner→Reclaim first
- Pressure leak testing→Use regulated nitrogen
- Charging zeotropic blend→Charge liquid
- Repair is complete→Evacuate air and moisture
Certification Scope
- Type I
- Small appliances
- Type II
- Medium through very-high pressure
- Type III
- Low-pressure appliances
- Universal
- All Section 608 types
- Section 608
- Stationary refrigeration equipment
- Section 609
- Motor vehicle air conditioning
- Technician action
- Violates refrigerant-circuit integrity
- Hoses and gauges
- Technician activity
- Adding refrigerant
- Technician activity
- Removing refrigerant
- Technician activity
- Registered apprentice
- Closely and continually supervised
- Training class
- Voluntary, not federally required
Recover vs Recycle
Recover
- Remove refrigerant
- External container
- No cleaning required
Recycle
- Clean refrigerant
- Oil and moisture removal
- Equipment reuse
Remove versus clean
Environment and Refrigerants
- CFC
- Chlorine, high ODP
- HCFC
- Chlorine, lower ODP
- HFC
- Zero ODP, often high GWP
- R-12
- CFC example
- R-22
- HCFC example
- R-134a
- HFC example
- ODP
- Ozone depletion potential
- GWP
- Global warming potential
- Stratospheric chlorine
- Catalytically destroys ozone
- Montreal Protocol
- International ODS phaseout
- AIM Act
- HFC phasedown and management
- Drop-in replacement
- No universal substitute exists
- Oil compatibility
- Verify refrigerant and lubricant
- Zeotropic blend
- Can fractionate
Recycle vs Reclaim
Recycle
- Field cleaning
- Same-owner use
- No AHRI certification
Reclaim
- AHRI 700 purity
- EPA-certified reclaimer
- Ownership transfer allowed
Reuse versus ownership transfer
Refrigeration Cycle
- Compressor
- Raises vapor pressure
- Condenser
- Rejects heat, forms liquid
- Metering device
- Drops refrigerant pressure
- Evaporator
- Absorbs heat, forms vapor
- Receiver
- Stores high-side liquid
- Accumulator
- Protects compressor from liquid
- Filter-drier
- Removes moisture and contaminants
- Sight glass
- Shows refrigerant condition
- High-side gauge
- Red hose
- Low-side gauge
- Blue hose
- psia conversion
- Add atmospheric pressure
- Vacuum purpose
- Removes air and moisture
ODP vs GWP
ODP
- Stratospheric ozone
- Chlorine matters
- HFC equals zero
GWP
- Climate warming
- HFC can be high
- CO2 is baseline
Ozone impact versus climate impact
Three Rs and Ownership
- Recover
- Remove into external container
- Recycle
- Clean for equipment reuse
- Reclaim
- Process to AHRI 700
- Same owner
- Reuse across same-owner appliances
- Ownership changes
- Reclamation required first
- Reclaimer
- EPA-certified processor
- Mixed refrigerants
- Avoid cross-contamination
- Recovery speed
- Short, large-diameter hoses
- Liquid recovery
- Begin before vapor
- Pressure rebound
- Wait and recheck
Venting, Sales, and Records
- Intentional venting
- Generally prohibited
- De minimis release
- Good-faith recovery incident
- Normal operation
- Permitted, subject to leak rules
- Exempt substitutes
- Only EPA-listed uses
- Refrigerant purchase
- Matching certification required
- Stationary refrigerant
- Section 608 buyer
- MVAC refrigerant
- Section 609 buyer
- Employer purchase
- Certified employee evidence
- Wholesaler invoice
- Buyer, date, quantity
- Invoice retention
- Three years
- Technician copy
- Keep at business
- Copy retention
- Three years after stopping
Refrigerant Safety
- Eye and skin
- Goggles and gloves
- Large release
- Use SCBA if trained
- Liquid contact
- Frostbite risk
- Confined space
- Oxygen displacement risk
- High heat
- Toxic decomposition products
- Recovery cylinder
- Gray body, yellow top
- Cylinder fill
- Eighty percent maximum
- Disposable cylinder
- Never refill
- Leak-test gas
- Dry regulated nitrogen
- Oxygen or air
- Never pressure-test
- Nitrogen regulator
- Required
- Relief valve
- Required with nitrogen
- Shipping cylinder
- Identify refrigerant and hazard
HFC Management Since 2026
- Rule
- 40 CFR Part 84
- Start date
- January 1, 2026
- Refrigerant scope
- Regulated HFC or qualifying substitute
- Substitute GWP threshold
- Greater than fifty-three
- Full-charge threshold
- Fifteen pounds or more
- ODS-only appliance
- Excluded; Part 82 may apply
- Comfort and other
- Ten percent annually
- Refrigerated transport
- Ten percent annually
- Commercial refrigeration
- Twenty percent annually
- Industrial process
- Thirty percent annually
- Residential light-commercial
- AC and heat pumps excluded
- Repair period
- Thirty days
- IPR shutdown
- One hundred twenty days
- Verification
- Initial and follow-up tests
- Retrofit or retire
- Plan within thirty days
- Plan completion
- Within one year
- Mothballing
- Pauses applicable timelines
- Chronic leak
- 125% requires EPA report
- Current changes
- Check EPA Part 84 updates
Small Appliance 90-80-4
Working 90 | Dead 80 | Vacuum 4
Type I vs Type II
Type I
- Small appliances
- Five pounds maximum
- Factory-charged sealed unit
Type II
- Medium pressure
- High and very-high pressure
- Excludes small appliances
Charge and appliance type decide
Type I Recovery
- Small appliance
- Factory-charged, hermetically sealed
- Charge maximum
- Five pounds
- Post-1993 recovery + working
- Recover ninety percent
- Pre-1993 recovery equipment
- Recover eighty percent
- Dead compressor
- Recover eighty percent
- Vacuum alternative
- Four inches Hg vacuum
- System-dependent
- Uses appliance pressure
- Self-contained
- Has independent compressor
- Dead compressor access
- Use both system sides
- Working compressor
- Run during passive recovery
- Piercing valve
- Remove after service
- R-134a
- Common R-12 substitute
Leak Threshold Ladder
Comfort 10 | Commercial 20 | Industrial 30
ODS vs HFC Leak Rules
Part 82 ODS
- Fifty-pound charge
- ODS refrigerant
- 10/20/30 thresholds
Part 84 HFC
- Fifteen-pound full charge
- Substitutes above GWP 53
- Sector exclusions apply
Identify refrigerant and governing rule
Evacuation Picker
- Small post-1993, compressor working→Recover 90%
- Small pre-1993 recovery equipment→Recover 80%
- Small compressor inoperative→Recover 80%
- Small vacuum alternative→Four inches Hg
- Very-high pressure→Zero inches Hg
- High under 200 pounds→Zero inches Hg
- High 200+ post-1993→Ten inches Hg
- Medium under 200 post-1993→Ten inches Hg
- Medium 200+ post-1993→Fifteen inches Hg
- Low-pressure appliance→25 mm Hg absolute
- Changing refrigerant oil→Five psig maximum
Required Evacuation Levels
- Equipment date
- November 15, 1993
- Very-high, either date
- Zero inches Hg
- High under 200
- Zero inches Hg
- High 200+, pre-date
- Four inches Hg
- High 200+, post-date
- Ten inches Hg
- Medium under 200, pre-date
- Four inches Hg
- Medium under 200, post-date
- Ten inches Hg
- Medium 200+, pre-date
- Four inches Hg
- Medium 200+, post-date
- Fifteen inches Hg
- Low-pressure, either date
- Twenty-five mm Hg absolute
- Date applies to
- Recovery equipment manufacture
Leak Rule Picker
- ODS full charge under fifty→No Part 82 leak trigger
- ODS full charge fifty-plus→Apply 10/20/30 thresholds
- Part 84 charge under fifteen→No Part 84 leak trigger
- Part 84 charge fifteen-plus→Check refrigerant and exclusions
- Residential light-commercial AC→Part 84 leak exclusion
- Leak exceeds threshold→Repair within thirty days
- IPR shutdown required→One hundred twenty days
- Repair completed→Perform verification tests
- Repair not chosen→Retrofit or retire
Type II Service Practices
- Liquid recovery
- Recover liquid first
- System-dependent limit
- Fifteen pounds unless permanent pump-out
- Major repair
- Removes compressor or listed heat exchanger
- Major opening
- Over 4 in² beyond fifteen minutes
- Nonmajor exception
- No later evacuation to atmosphere
- Medium/high/very-high nonmajor
- Zero psig before opening
- Leaking component
- Lowest attainable, maximum zero psig
- Oil change
- Five psig maximum
- Hermetic under vacuum
- Never energize
- Leak testing
- Test before recharging
- Zeotropic blend
- Charge as liquid
- Pressure rebound
- Wait before declaring complete
- Recovery machine change
- Prevent cross-contamination
- ASHRAE 15
- Equipment-room safety
ODS Leak Repair
- Rule
- 40 CFR Part 82
- Refrigerant scope
- Ozone-depleting refrigerant
- Full-charge threshold
- Fifty pounds or more
- Comfort cooling
- Ten percent annually
- All other appliances
- Ten percent annually
- Commercial refrigeration
- Twenty percent annually
- Industrial process
- Thirty percent annually
- Repair period
- Thirty days
- IPR shutdown
- One hundred twenty days
- Retrofit plan
- Create within thirty days
- Plan completion
- Within one year
- Verification
- Initial and follow-up tests
- Mothballing
- Pauses applicable timelines
- Chronic leak
- 125% requires EPA report
- Report deadline
- March 1 following calendar year
Low-Pressure Numbers
25 absolute | 10 test | 15 relief
Type II vs Type III
Type II
- Above atmospheric operation
- Leaks move outward
- High-pressure equipment
Type III
- Below atmospheric operation
- Leaks pull inward
- Low-pressure chillers
Operating pressure determines type
Type III Chillers
- Operating pressure
- Below atmospheric pressure
- Leak direction
- Air and moisture enter
- Excessive purging
- Leak warning
- Purge unit
- Removes noncondensables
- Recovery target
- Twenty-five mm Hg absolute
- Leak pressurization
- Warm water preferred
- Nitrogen
- Second pressurization choice
- Leak-test maximum
- Ten psig
- Rupture disc
- Fifteen psig
- Low-pressure nonmajor
- Pressurize no higher than zero psig
- Recovery sequence
- Liquid, then vapor
- Freeze prevention
- Circulate or remove water
- Oil removal
- Heat oil to 130°F
- Recharge sequence
- Vapor before liquid
- Charging valve
- Evaporator connection
- Pressure rebound
- Wait and recheck
Common Traps
Open Core toward Universal
Open-book Core cannot count ≠ Universal Core must be proctored
Combined Universal score
Pass every required examination ≠ Strong parts do not substitute
Type I size
Five pounds is maximum ≠ Factory-charged and sealed
Equipment date
Date refers recovery equipment ≠ Not appliance manufacture
Low-pressure vacuum
Twenty-five millimeters absolute ≠ Not inches of vacuum
ODS vs HFC leaks
ODS trigger starts fifty pounds ≠ Part 84 starts fifteen pounds
Below leak-rule charge threshold
Only leak repair is untriggered ≠ Other requirements can still apply
Every hydrocarbon exempt
Only EPA-listed uses exempt ≠ Check exact substitute and end-use
Universal covers MVAC
Universal covers Section 608 ≠ MVAC generally needs Section 609
Recycle equals reclaim
Recycling is field cleaning ≠ Ownership transfer needs reclamation
Fixed federal logistics
EPA sets no standard time ≠ Provider controls fees and scheduling
Last Minute
- 1.Universal = Core + I + II + III
- 2.Universal Core must be proctored
- 3.Pass all four examinations individually
- 4.Closed-book passing = 70%
- 5.Mail-in Type I passing = 84%
- 6.Type I maximum = five pounds
- 7.Working small appliance = 90%
- 8.Dead compressor = 80%
- 9.Small vacuum option = four inches Hg
- 10.High 200+ post-1993 = ten inches
- 11.Low pressure = 25 mm absolute
- 12.Oil change = five psig maximum
- 13.Leak-test with regulated nitrogen
- 14.Never refill disposable cylinders
- 15.Never exceed eighty-percent cylinder fill
- 16.Recover liquid before vapor
- 17.Ownership transfer requires reclamation
- 18.ODS leak rule begins fifty pounds
- 19.Part 84: fifteen-pound full charge
- 20.Part 84: check GWP and exclusions
- 21.608 stationary; 609 motor vehicle
- 22.Check current EPA Part 84 updates
Explore More Refrigerant Certifications (EPA 608, 609 & R-410A)
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
More From This Family
Videos and articles for deeper review.