Governance
26%of exam
Risk Assessment
22%of exam
Risk Response and Reporting
32%of exam
Technology and Security
20%of exam
Quick Facts
- Exam
- CRISC
- Exam owner
- ISACA
- Questions
- 150 multiple-choice
- Time limit
- 4 hours
- Passing score
- 450 scaled (200–800)
- Delivery
- PSI center or remote proctoring
- Member exam fee
- US$575
- Nonmember exam fee
- US$760
- Outline effective
- November 3, 2025
Three Lines Recall
Manage, challenge, assure
Appetite vs Tolerance
Appetite
- Enterprise risk-taking direction
- Informs strategic choices
Tolerance
- Acceptable variation around objectives
- Informs operating limits
Set tolerances from appetite
Governance Roles
- Governing body
- Oversees enterprise risk management
- Executive management
- Executes strategy and manages risk
- First line
- Operates and manages risk
- Second line
- Supports, monitors, challenges first line
- Third line
- Provides independent internal audit assurance
- Risk owner
- Accountable for managing assigned risk
- Control owner
- Accountable for assigned control operation
- Risk practitioner
- Assesses exposure and recommends responses
BCP vs DRP
Business continuity plan
- Keeps priority operations running
- Includes staffing and workarounds
Disaster recovery plan
- Restores technology and data
- Includes recovery sequence and procedures
Business priorities drive IT recovery
Appetite and Policy
- ERM
- Integrates risk with enterprise objectives
- Risk profile
- Summarizes exposure across enterprise
- Risk appetite
- Willingness to pursue or retain risk
- Risk tolerance
- Acceptable variation around objectives
- Risk capacity
- Maximum exposure enterprise can absorb
- Policy
- Management direction and intent
- Standard
- Mandatory, specific requirements
- Procedure
- Steps to carry out work
- Risk culture
- Shared behaviors shaping risk decisions
- Contractual obligation
- Enforceable commitment between parties
Continuity Planning
- Asset inventory
- Lists assets and accountable owners
- Business continuity plan (BCP)
- Sustains critical business operations
- Disaster recovery plan (DRP)
- Restores disrupted technology services
- RTO
- Target time to restore serviceRecovery time objective
- RPO
- Target point for data recoveryRecovery point objective
- Tabletop exercise
- Discusses actions in simulated scenarios
- Restore test
- Verifies recoverability from backup
Scenario Recall
Source triggers event with business impact
Inherent vs Residual Risk
Inherent
- Before considering controls
- Baseline exposure for scenario
Residual
- After considering controls
- Used to inform further treatment
Compare residual exposure with tolerance
Assessment Picker
- New risk with unclear scope→Set context and criteria(Confirm affected business objectives)
- Weakness reported without business impact→Build a risk scenario(Link event to consequences)
- Sparse credible loss data→Use qualitative ratings(Record uncertainty)
- Reliable frequency and loss estimates→Estimate annual loss(Use consistent time units)
- Need disruption recovery priorities→Conduct a BIA(Trace critical dependencies)
- Existing safeguards affect exposure→Assess residual risk(Use control evidence)
Risk Scenarios
- Threat source
- Origin of potentially harmful events
- Threat event
- Occurrence that may cause harm
- Vulnerability
- Weakness a threat can exploit
- Risk scenario
- Plausible event and business consequences
- Threat modeling
- Structured identification of possible threats
- Likelihood
- Chance of the adverse outcome
- Impact
- Consequences for business objectives
- Exposure
- Potential for harm or loss
BIA vs Risk Assessment
BIA
- Estimates consequences of disruption
- Prioritizes business process recovery
Risk assessment
- Evaluates adverse risk scenarios
- Considers likelihood and impact
Use BIA impact in assessment
Risk Analysis
- Qualitative analysis
- Ranks risk using descriptive categories
- Quantitative analysis
- Estimates frequency and loss numerically
- Semi-quantitative analysis
- Uses scoring scales for comparison
- Inherent risk
- Exposure before controls
- Residual risk
- Exposure after controls
- SLE
- Expected loss per eventSingle loss expectancy
- ARO
- Expected occurrences per yearAnnual rate of occurrence
- ALE
- SLE × AROAnnual loss expectancy
- Example ALE
- US$10,000 per yearUS$20,000/event × 0.5/year
Risk Register and BIA
- Risk register
- Records risks, owners, and responses
- Risk aggregation
- Combines exposures across business units
- Shared dependency
- May concentrate multiple risks
- Business impact analysis (BIA)
- Estimates disruption impacts over time
- Process criticality
- Informs business recovery priorities
- Impact assumptions
- Record inputs and uncertainty
- Risk reassessment
- Refresh ratings after material changes
Treatment Recall
Stop, reduce, share, retain
Risk Owner vs Control Owner
Risk owner
- Accountable for assigned exposure
- Coordinates response and escalation
Control owner
- Accountable for assigned safeguard
- Maintains control operation and evidence
Follow delegated acceptance authority
Treatment Picker
- Activity can be discontinued→Consider avoidance(Confirm business consequences)
- Safeguards reduce likelihood or impact→Consider mitigation(Compare cost and reduction)
- Insurance covers specified losses→Consider transfer(Check exclusions and retained risk)
- Exposure acceptable under policy→Seek authorized acceptance(Document rationale and review date)
- Residual risk exceeds tolerance→Escalate for decision(Present impact and options)
- Required control cannot operate→Evaluate compensating control(Meet objective and obtain approval)
- Treatment reported complete→Validate response execution(Reassess remaining risk)
Risk Treatment
- Avoid
- Stop activity creating the exposure
- Mitigate
- Reduce likelihood or impact
- Transfer or share
- Shift specified exposure by agreement
- Accept
- Retain risk by informed decision
- Compensating control
- Alternative meeting the control objective
- Treatment plan
- Assigns actions, owners, and deadlines
- Cost-benefit analysis
- Weigh reduction against lifecycle cost
- Risk exception
- Approved deviation with defined scope
- Remediation closure
- Verify evidence and reassess exposure
Design vs Operating Effectiveness
Design
- Could it achieve the objective?
- Inspect coverage and control logic
Operation
- Did it work as intended?
- Test evidence from the period
Test suitability and actual operation
Reporting and Evidence Picker
- Rising supplier concentration→Track a KRI(Measure exposure)
- Review control must run quarterly→Track a KCI(Measure on-time review coverage)
- Measure order processing throughput→Track a KPI(Measure orders per hour)
- Need policy or configuration evidence→Examine artifacts(Check dates and scope)
- Need proof control ran consistently→Test operating evidence(Cover a representative period)
- Risk trend reaches trigger→Escalate per threshold rules(Include impact and owner)
- Executives must approve a response→Present decision and tradeoffs(Show residual exposure)
- Supplier uses critical subcontractor→Assess fourth-party dependency(Check contingency options)
Control Design and Testing
- Control objective
- Outcome a safeguard must achieve
- Preventive control
- Reduces chance of unwanted event
- Detective control
- Identifies events or deviations
- Corrective control
- Remedies effects after detection
- Design effectiveness
- Could control meet its objective?
- Operating effectiveness
- Did control work in practice?
- Examine
- Review records, settings, or artifacts
- Interview
- Ask personnel about actual practice
- Reperformance
- Independently execute the control procedure
- Sampling
- Test selected evidence across period
KRI vs KCI
Key risk indicator
- Tracks exposure or warning signs
- Supplier concentration signals exposure
Key control indicator
- Tracks safeguard performance
- Timely access reviews show execution
Choose by measurement purpose
Risk Metrics and Reporting
- KRI
- Signals changing risk exposureKey risk indicator
- KCI
- Measures control operation or effectivenessKey control indicator
- KPI
- Tracks performance against an objectiveKey performance indicator
- Threshold breach
- Triggers escalation under defined rules
- Data validation
- Check completeness, accuracy, and timeliness
- Heat map
- Visualizes likelihood and impact ratings
- Dashboard
- Shows trends, breaches, and status
- Executive reporting
- Summarizes impact and decisions needed
- Emerging risk
- Track evolving exposures and assumptions
Third-Party Oversight
- Due diligence
- Assess suppliers before awarding contracts
- Service level agreement (SLA)
- Defines measurable service commitments
- Right to audit
- Contractual access for assurance
- Assurance report scope
- Check covered systems and period
- Fourth party
- Supplier supporting your direct supplier
- Concentration risk
- Dependence on common provider
- Ongoing review
- Reassess after significant supplier changes
- Exit plan
- Plan transition and data disposition
Recovery Recall
Time to restart, point to restore
RTO vs RPO
Recovery time objective
- Elapsed time target for restoration
- Restore service within 2 hours
Recovery point objective
- Point to which data returns
- At most 15 minutes lost
Measure service delay and data loss
Technology Risk Picker
- Critical service must resume quickly→Check recovery time objective(Validate restoration time)
- Recent transaction loss is unacceptable→Check recovery point objective(Validate data recoverability)
- Urgent change requires expedited approval→Use emergency change process(Record and review afterward)
- New system handles sensitive data→Classify data before design(Choose handling requirements)
- Model performance changes after launch→Investigate drift(Validate on recent data)
- AI errors vary across groups→Assess harmful bias(Escalate material disparities)
Technology Operations
- Enterprise architecture
- Maps shared systems and dependencies
- Technology roadmap
- Sequences capability changes over time
- Change management
- Approves, tests, and tracks changes
- SDLC
- Builds controls into development stagesSystem development life cycle
- Agile delivery
- Iterates with incremental feedback
- DevOps
- Integrates development and operations
- Incident management
- Restores disrupted service
- Problem management
- Investigates underlying causes
- Failover
- Switches service to standby capability
Security vs Privacy Risk
Information security risk
- Concerns confidentiality, integrity, availability
- Unauthorized disclosure threatens confidentiality
Privacy risk
- Concerns harm from data processing
- Unexpected data reuse can harm
Evaluate both for personal data
Security Safeguards
- Confidentiality
- Limits unauthorized disclosure
- Integrity
- Guards against improper modification or destruction
- Availability
- Timely access for authorized users
- Least privilege
- Grants only necessary permissions
- Segregation of duties
- Separates conflicting responsibilities
- Access recertification
- Verifies permissions remain appropriate
- Security awareness
- Reinforces expected security behaviors
- Incident response
- Contains incidents and supports recovery
Data and AI Risk
- Data classification
- Sets handling by sensitivity and criticality
- Data minimization
- Collect and retain only necessary data
- Retention schedule
- Defines retention and disposition rules
- Encryption
- Protects data confidentiality
- Model drift
- Monitor changes in model behavior
- Harmful bias
- Check outcomes across affected groups
- AI data governance
- Track data provenance and quality
- Human oversight
- Review and override automated decisions
Common Traps
Scaled Scoring
450 scaled points ≠ 56.25% correct
Risk Acceptance Authority
Risk practitioner recommendation ≠ Authorized risk acceptance
Transfer Coverage
Insured loss ≠ All business consequences
Vulnerability Priority
Technical severity rating ≠ Business risk priority
Control Assurance
Approved control design ≠ Effective control operation
Compliance Status
Compliance with a requirement ≠ Elimination of risk
Recovery Evidence
Successful backup job ≠ Successful restore test
Supplier Assurance
Vendor assurance report ≠ Coverage of every service
Last Minute
- 1.Board oversees enterprise risk management
- 2.Appetite guides strategic risk-taking
- 3.Translate appetite into operating tolerances
- 4.Link scenarios to business impact
- 5.Yearly loss = frequency × per-event loss
- 6.Compare residual risk with tolerance
- 7.Document approval for accepted exposure
- 8.Check control design and operation
- 9.Check vendor assurance scope and date
- 10.Risk indicators track changing exposure
- 11.Validate restoration time and data loss
- 12.Monitor AI drift and harmful bias
Explore More ISACA Certifications