11.3 Version 1 to Version 2: What Changed and Common Traps
Key Takeaways
Version 2 was released in May 2025 and aligns PRINCE2 Agile with PRINCE2 Project Management Version 7.
Themes became practices, management products became artifacts, and the Change theme became the Issues practice.
The six-cornered hexagon was replaced by seven performance targets, adding sustainability.
The five targets, five behaviours, Cynefin and the eight guidance points are Version 1 material and are not named in the Version 2 Foundation syllabus.
Version 1 vouchers stopped on 30 June 2026 and the last Version 1 exam date is 31 December 2026.
11.3 Version 1 to Version 2: What Changed and Common Traps
Quick summary: Version 2 was released in May 2025 and aligns PRINCE2 Agile with PRINCE2 Project Management Version 7. Vocabulary changed, content was added, and several Version 1 signature concepts left the Foundation syllabus. Because most free material online is still Version 1, cross-contamination is the biggest single risk to your preparation.
The exam itself
| Version 1 (retired) | Version 2 (current) | |
|---|---|---|
| Questions | 50 | 40 |
| Pass mark | 28 (55%) | 24 (60%) |
| Duration | 60 minutes | 60 minutes |
| Book | Closed | Closed |
| Certificate validity | Lifetime, no renewal | 3 years, 20 CPD points |
| Voucher purchase | Ended 30 June 2026 | Current |
| Final exam date | 31 December 2026 | — |
If a resource says "50 questions, 55% to pass, valid for life", it is describing the retired paper — regardless of what the page title claims. This is the single fastest way to identify stale study material.
Vocabulary changes
| Version 1 | Version 2 |
|---|---|
| Themes | Practices |
| Change theme | Issues practice |
| Management products | Artifacts |
| Principles, themes, processes | Principles, people, practices, processes, project context (five integrated elements) |
| Hexagon — six performance aspects | Seven performance targets, adding sustainability |
What Version 2 added
- Organizational change management — a whole topic within the 30% key-concepts outcome
- The people integrated element, and with it teams, leadership, culture and communication
- Being agile vs doing agile as a headline distinction
- The Agile Onion — processes, practices, principles, values, mindset
- Agile transformation success factors — agile maturity, psychological safety, agile sustainability
- Agile scaling as an explicit topic
- Eleven named roles, including the chief product owner, agile coach, team coach, developer and tester
- Named agile workshops attached to the processes
- New artifacts — project canvas, release map, project and team dashboards
- The wider context — agile product management, transitioning to operations, continuous agile development and operations
- AI supporting PRINCE2 Agile
- Sustainability, as a performance target and as agile sustainability
What is no longer in the Foundation syllabus
These are Version 1 signature concepts. They are not named in the Version 2 Foundation syllabus assessment criteria:
- The five targets — be on time, protect quality, embrace change, keep teams stable, accept the customer doesn't need everything
- The five behaviours — transparency, collaboration, rich communication, self-organization, exploration
- The hexagon as a model, replaced by the seven performance targets
- The Cynefin framework
- The eight guidance points
- The Version 1 "focus areas" — the Agilometer, requirements, rich communication, frequent releases, contracts — as a grouped topic
Two important qualifications, because "not named in the syllabus" is not the same as "wrong":
- The underlying ideas survive. Fixing time and cost while flexing scope is still exactly how PRINCE2 Agile works; it is now expressed through the seven performance targets and their tolerances rather than through a hexagon diagram. Transparency and collaboration are still central; they now appear as characteristics of the agile mindset.
- The Agilometer still exists. It appears in the official Version 2 material as a technique within the risk practice for identifying agile adoption issues. What changed is its prominence: it is one technique among many, not the organizing centre of the method.
If a question offers the Agilometer as an option, it is most likely either the correct answer to a risk practice question or a distractor drawn from a neighbouring practice.
The traps that follow
Trap 1 — Answering "50 questions, 55%" logistics questions. Check the version of anything you revise from.
Trap 2 — Saying "theme" when the answer is "practice". And, specifically, looking for a Change practice. It is Issues.
Trap 3 — Naming six performance aspects. There are seven; the one candidates omit is sustainability.
Trap 4 — Reciting the five behaviours when asked about the agile mindset. The mindset characteristics are empowerment, transparency, adaptability, respect, collaboration, continual learning. Empowerment is the one that promotes autonomy and self-management.
Trap 5 — Confusing "being agile" and "doing agile". Being = mindset. Doing = processes. The exam presents this reversed.
Trap 6 — Confusing the two coaching roles. Agile coach works across teams and the organization; team coach serves one team.
Trap 7 — Confusing the chief product owner with the product owner. CPO is project level and aligns backlogs across teams; PO is team level.
Trap 8 — Confusing team retrospective with project retrospective. Team level every iteration; project level once at closure.
Trap 9 — Attributing priority decisions to a coach. Priority is the product owner's accountability, including when requirements are traded or swapped.
Trap 10 — Treating a stage as an iteration. A stage is a management control period containing releases, each containing iterations.
Trap 11 — Confusing risk with issues. Risk has not happened; an issue has. When a risk materialises, it becomes an issue.
Trap 12 — Ignoring learning outcome 4. Only 5%, but four discrete ideas — agile product management, transition, deployability, AI — that are quick to learn and are absent from every Version 1 resource.
Which of these is Version 1 material that is not named in the Version 2 Foundation syllabus?
The Agile Onion
The five behaviours
Organizational change management
The seven performance targets
A study resource describes 'the seven PRINCE2 themes, including the Change theme'. What does this indicate?
It is current Version 2 material
It describes the Practitioner rather than the Foundation syllabus
It is pre-Version-7 material, since themes are now practices and Change is now Issues
It describes PRINCE2 Agile rather than PRINCE2 Project Management
What is the current status of the Agilometer in PRINCE2 Agile Version 2?
It has been removed entirely and should not be studied
It remains a technique within the risk practice for identifying agile adoption issues
It is the central organizing model of the method, as in Version 1
It replaced the hexagon as the model for fixing and flexing