5.2 Temperature & Pressure Relief Valves & Discharge Piping
Key Takeaways
IPC 504.4 requires storage water heaters above atmospheric pressure to have pressure and temperature relief valves conforming to ANSI Z21.22.
Under IPC 504.5, relief valves are set at not more than 210°F and not more than the tank's rated working pressure or 150 psi, whichever is less.
IPC 504.4.1 places the temperature relief valve in the top 6 inches of the tank and prohibits check or shutoff valves between it and the tank.
IPC 504.6 requires full-size, gravity-drained relief discharge through an air gap in the same room, ending 2 pipe diameters to 6 inches above the floor or receptor.
Relief discharge pipe must be a Table 605.4 material or approved under ASME A112.4.1, so PVC is not acceptable (IPC 504.6).
Temperature & Pressure Relief Valves & Discharge Piping
Water heaters and pressurized hot water storage vessels represent one of the highest potential energy hazards in building plumbing design. Water under pressure does not boil at the atmospheric boiling point of 212°F (100°C). Under a typical municipal water distribution pressure of 60 psig (74.7 psia), the boiling point of water rises to approximately 307°F (153°C); at 125 psig, the boiling point reaches 353°F (178°C). If an unvented water heater experiences an unchecked thermal runaway due to a failed thermostat, the stored water becomes superheated liquid. A subsequent rupture of the vessel shell drops the pressure instantaneously to atmospheric, causing the superheated water to flash explosively into steam. Because steam expands to roughly 1,600 times the volume of liquid water, a standard 50-gallon domestic water heater undergoing a catastrophic failure releases energy equivalent to several sticks of dynamite—a phenomenon known as a Boiling Liquid Expanding Vapor Explosion (BLEVE). To eliminate this catastrophic hazard, IPC Section 504 establishes stringent mandates for Temperature and Pressure (T&P) relief valves and their associated discharge piping.
T&P Relief Valve Operating Parameters & Listings (IPC 504.1–504.5)
Under IPC 504.4, storage water heaters operating above atmospheric pressure must have an approved, self-closing (levered) pressure relief valve and temperature relief valve, or a combination of the two. Combination T&P valves are the usual choice. Where a separate storage tank is used, relief valves are required on both the storage water heater and the storage tank (504.4.1). A relief valve may not be used to control thermal expansion (504.4); that is the job of the thermal expansion control in IPC 607.3.
Product Standards (IPC Sections 504.4 and 504.5)
- ANSI Z21.22 / CSA 4.4: IPC 504.4 requires relief valves to conform to ANSI Z21.22, Relief Valves for Hot Water Supply Systems.
- Labeling (504.5): T&P valves, and energy cutoff devices, must bear the label of an approved agency.
- Large vessels: Commercial heaters and tanks above certain input or volume thresholds are also built to the ASME Boiler and Pressure Vessel Code and carry ASME-rated relief valves. That requirement comes from the vessel standard and state boiler laws, not from IPC 504.
Mandatory Operating Thresholds
T&P Relief Valve Critical Operating Thresholds
┌────────────────────────────────────────────────────────┐
│ Maximum Pressure Relief Setting: │
│ 150 psi (1034 kPa) or Vessel Working Pressure Rating │
│ (Whichever is lower) │
└──────────────────────────┬─────────────────────────────┘
│
▼
┌────────────────────────────────────────────────────────┐
│ Maximum Temperature Relief Setting: │
│ 210°F (99°C) │
│ (Thermostatic element immersed in upper 6" of vessel) │
└──────────────────────────┬─────────────────────────────┘
│
▼
┌────────────────────────────────────────────────────────┐
│ Relieving Capacity (BTU/hr): │
│ Valve Steam Rating >= Appliance Hourly Input (BTU/hr) │
└────────────────────────────────────────────────────────┘
- Pressure Limitation (504.5): The pressure setting may not exceed the tank or water heater manufacturer's rated working pressure or 150 psi (1035 kPa), whichever is less. For example, if a commercial tank is rated for a maximum allowable working pressure (MAWP) of 125 psi, the T&P valve pressure setpoint cannot exceed 125 psi.
- Temperature Limitation (504.5): The temperature setting may not exceed 210°F (99°C). This parameter ensures the valve discharges before water reaches the atmospheric boiling point (212°F), preventing steam flash conditions inside the vessel.
- Location (504.4.1): Relief valves are installed in the shell of the tank, and the temperature relief valve must be actuated by the water in the top 6 inches (152 mm) of the tank. No check valve or shutoff valve may be installed between a relief valve and the heater or tank it serves. Because hot water naturally rises due to thermal stratification, the hottest water always collects at the top of the vessel. Installing the valve on a remote tee or nipple where the probe is outside the top 6 inches delays thermal response and violates code.
- Relieving Capacity (504.5): The relieving capacity of each pressure relief valve and each temperature relief valve must equal or exceed the heat input to the water heater or storage tank. For example, an instantaneous gas water heater with an input rating of 199,000 BTU/h requires a T&P relief valve with a certified ASME steam rating of at least 199,000 BTU/h.
Relief Valve Discharge Piping (IPC Section 504.6)
The discharge pipe connected to a T&P relief valve conveys boiling water and steam during an emergency discharge. If the pipe is undersized, obstructed, improperly pitched, or fabricated from inadequate materials, it can burst, scald occupants, or trap pressure, rendering the relief valve useless.
The 14 Requirements of IPC Section 504.6
The discharge piping serving a pressure relief valve, temperature relief valve or combination valve shall:
| Item | 2024 IPC 504.6 Requirement | Plan Review Note |
|---|---|---|
| 1 | Not be directly connected to the drainage system | The connection is indirect, through an air gap. |
| 2 | Discharge through an air gap located in the same room as the water heater | A pipe run straight outdoors without an air gap in the room does not comply. |
| 3 | Not be smaller than the valve outlet, and discharge full size to the air gap | No reductions anywhere in the run. |
| 4 | Serve a single relief device and not connect to piping serving any other relief device or equipment | No manifolding of relief lines, and no tie-in to the pan drain. |
| 5 | Discharge to the floor, to the water heater pan, to a waste receptor or to the outdoors | Discharge to the pan is allowed, but the pan drain may not be connected to the relief line. |
| 6 | Discharge in a manner that does not cause personal injury or structural damage | Keep away from walkways and finishes. |
| 7 | Discharge to a termination point readily observable by the building occupants | A hidden discharge defeats the warning function. |
| 8 | Not be trapped | Trapped water can freeze or collect scale. |
| 9 | Be installed so as to flow by gravity | No uphill runs. |
| 10 | Terminate not more than 6 inches above, and not less than two times the discharge pipe diameter above, the floor or the flood level rim of the waste receptor | For 3/4-inch pipe: 1-1/2 to 6 inches. |
| 11 | Not have a threaded connection at the end | Prevents capping or attaching a hose. |
| 12 | Not have valves or tee fittings | No shutoffs, checks or tees. |
| 13 | Be constructed of materials listed in Section 605.4, or materials tested, rated and approved for such use under ASME A112.4.1 | See the material discussion below. |
| 14 | Be one nominal size larger than the relief valve outlet where installed with insert fittings, with the outlet end fastened in place | Applies to PEX and similar tubing with insert fittings. |
T&P Relief Valve Discharge Piping & Air Gap Geometry
Cold Water Inlet Hot Water Outlet
│ │
▼ ▲
┌───────────────────────────────────┐
│ Water Heater Tank │
│ T&P Relief Valve │
│ [<= rated pressure or 150 psi; <= 210°F]
│ ┌───┐ │
│ │ O─┼──┐ Actuated by top 6" │
└──────┴───┴──┼─────────────────────┘
│
▼ Full-size pipe from Table 605.4 or ASME A112.4.1
│ [Gravity flow, no traps, valves or tees]
▼
│ [Unthreaded end]
├── Air gap: min 2 x pipe diameter (1.5" for 3/4" pipe)
│ max 6" above floor or receptor rim
▼
┌──────────────────┐
│ ░░░░░░░░░░░░░░░░ │ Floor, pan or waste receptor in the same room
└──────────────────┘
Material Selection: Approved vs. Prohibited Piping (IPC Table 605.4)
One of the most frequent plan review corrections involves the specification of inappropriate plastic piping for T&P relief discharge lines.
Why Schedule 40 PVC Is Not Acceptable
Contractors sometimes propose Schedule 40 PVC (ASTM D1785) or PVC-DWV for relief discharge piping because it is cheap and on site. Under IPC 504.6 item 13, the discharge pipe must be a material listed in Table 605.4 (water distribution pipe), or a material tested, rated and approved for relief discharge under ASME A112.4.1. PVC is not listed in Table 605.4; it appears only in Table 605.3 for cold water service. Ordinary PVC is also rated for a maximum service temperature of about 140°F, while relief discharge can reach 210°F with flashing steam.
Code-Approved Materials for T&P Discharge Piping
Materials listed in IPC Table 605.4 include:
- Copper or copper-alloy pipe and tubing (Types K, L and M): the most common choice, and easy to support rigidly.
- CPVC (ASTM D2846, F441, F442).
- Galvanized steel pipe (ASTM A53) and stainless steel pipe and tubing (Types 304/316).
- Ductile iron pipe (AWWA C151, C115).
- Polypropylene (PP) pipe or tubing (ASTM F2389).
- PEX (ASTM F876), PE-RT (ASTM F2769) and the composite pipes listed in the table. Where tubing is installed with insert fittings, it must be one nominal size larger than the valve outlet and its outlet end must be fastened in place (504.6 item 14). Follow the manufacturer's instructions for support so the tubing does not move during a discharge.
Products tested, rated and approved under ASME A112.4.1 (water heater relief valve drain tubes) are also acceptable.
Termination Scenarios: Indoor vs. Outdoor Geometry
The discharge terminal must safely dissipate boiling water without causing harm:
Scenario A: Interior Termination
- Approved Discharge Points (504.6 item 5): The floor, the water heater pan, a waste receptor (floor drain, floor sink, mop basin or hub drain) or the outdoors.
- Air Gap Location (item 2): The air gap must be in the same room as the water heater, where a discharge will be seen.
- Air Gap Dimensioning (item 10): The vertical distance between the end of the discharge pipe and the floor or the flood level rim of the receptor must be: For a 3/4-inch pipe (), the minimum is . The 6-inch maximum limits splashing of scalding water.
Scenario B: Discharge to the Outdoors
- Discharge to the outdoors is one of the permitted points (item 5), but the air gap must still be in the same room as the water heater (item 2). A common compliant arrangement discharges through an air gap into a receptor in the heater room whose drain is carried outdoors.
- The discharge must be readily observable, must not cause injury or structural damage, must flow by gravity and must not be trapped.
- Do not confuse this with the pan drain rule. The requirement to terminate 6 to 24 inches above the adjacent ground appears in IPC 504.7.2 for water heater pan drains extended outdoors. It is not a relief valve discharge requirement.
- Unthreaded Terminal (item 11): The end of the pipe has no threads, so nobody can cap it or attach a hose.
Plans Examiner Verification Checklist: T&P Relief Systems
┌────────────────────────────────────────────────────────────────────────┐
│ Plumbing Plans Examiner Verification Checklist │
│ T&P Relief Systems │
├────────────────────────────────────────────────────────────────────────┤
│ [ ] Valve Standard: ANSI Z21.22, labeled by an approved agency │
│ [ ] Pressure Setting: <= 150 psi AND <= tank rated working pressure │
│ [ ] Temperature Setting: Maximum 210°F setpoint │
│ [ ] Sensor Location: Element immersed within top 6" of vessel │
│ [ ] Capacity: Relieving capacity >= heater or tank heat input │
│ [ ] Pipe Sizing: Full nominal diameter matching valve outlet (min 3/4")│
│ [ ] Pipe Material: Table 605.4 or ASME A112.4.1 (no PVC) │
│ [ ] Slope & Drainage: Continuous pitch downward; zero uphill loops │
│ [ ] Prohibited Fittings: No shutoff valves, check valves, or tees │
│ [ ] Separation: Single device; not tied to pan drain or other relief │
│ [ ] Indoor Terminal: Air gap between 2x pipe diameter and 6" max │
│ [ ] Air Gap Location: In the same room as the water heater │
└────────────────────────────────────────────────────────────────────────┘
An engineer specifies a commercial gas-fired water heater with an input rating of 350,000 Btu/h and a working pressure rating of 125 psi. Under IPC Section 504.5, what are the maximum pressure and temperature settings, and the minimum relieving capacity, for its relief valve?
125 psi, 210°F, and minimum 350,000 BTU/hr relieving capacity.
125 psi, 212°F, and capacity based on water volume rather than input rating.
100 psi, 180°F, and minimum 300,000 BTU/hr capacity.
150 psi, 200°F, and minimum 250,000 BTU/hr capacity.
During a commercial plumbing plan review, the plumbing plans detail a 3/4-inch T&P relief valve discharge line terminating indoors over a utility room floor drain. According to IPC Section 504.6, what are the required vertical dimensional limits for the discharge pipe termination above the flood level rim of the drain?
Not less than 1.5 inches (two pipe diameters) and not more than 6 inches above the flood level rim.
Flush with the floor drain rim with a minimum 1/2-inch air break.
Directly touching the floor drain grate with a sealed mechanical coupling to prevent splashing.
Exactly 12 inches above the rim with a threaded adapter for testing.
A plumbing contractor proposes Schedule 40 PVC for the temperature and pressure relief valve discharge pipe on a residential water heater. Why must the plans examiner reject this material under IPC Section 504.6?
Schedule 40 PVC is permissible for T&P discharge piping up to 50 gallons capacity, but prohibited on larger vessels.
Schedule 40 PVC is prohibited because all relief piping must be nonmetallic and flexible.
PVC is not listed in Table 605.4 or approved under ASME A112.4.1, and it is not rated for 210°F discharge.
Schedule 40 PVC can only be approved if joined with clear primer and medium-bodied cement.
The plumbing drawings for a multi-family building route the water heater T&P discharge pipe directly through the exterior wall, ending 12 inches above grade outside, with no air gap inside the water heater room. How should the plans examiner rule under IPC Section 504.6?
Approve it if a spring-loaded flapper check valve covers the outdoor end.
Reject it; the discharge needs an air gap in the same room as the water heater.
Approve it if the outdoor end points upward with a 180-degree return bend.
Approve it, because outdoor relief discharge must end 6 to 24 inches above grade and 12 inches is within that range.