11.1 Procurement Law and the L.I. 2516 Thresholds
Key Takeaways
L.I. 2516 entered into force on 4 February 2026 and replaced the Second, Third and Fifth Schedules to Act 663.
The Second and Third Schedules assign the approving authority by entity and procurement category. The Fifth Schedule sets method thresholds.
For goods, the head-of-entity ceiling is GH¢800,000 in Categories A–C, GH¢600,000 in RCCs, GH¢500,000 in metropolitan assemblies and GH¢340,000 in municipal and district assemblies.
Section 24A distinguishes authorisation before commencement for PPA or Central Tender Review Committee procurement from authorisation needed at the committee approval stage.
Section 21(6) prohibits dividing an order or lowering its value to avoid procurement procedures.
Identify the Procurement Entity and the Applicable Schedules
The Public Procurement Act, 2003 (Act 663), as amended, establishes the national procurement regulator, the Public Procurement Authority (PPA). Act 914 amended entity governance, approval and procurement procedures. Act 1139 added commitment authorisation in section 24A. L.I. 2516 replaced three schedules and entered into force on 4 February 2026. The date appears on the last page of the instrument.
For a school or district education office, establish which entity is carrying out the purchase and in which statutory category. If a district assembly undertakes a school repair, read the assembly's row. If another entity undertakes it, identify that entity's delegation and category. A school head's job title alone does not establish the approving authority. Under sections 17–18, a head's accountability continues through the approval process. The procurement unit processes the procurement and the evaluation panel evaluates tenders. Sections 18 and 20A–20F govern referral and concurrent review.
Determine Approval and Method Separately
Read the Second Schedule for approval within the relevant ministry, department or agency category. Read the Third Schedule for Regional Coordinating Councils (RCCs) and assemblies. These are the head's upper approval limits for goods, together with the next approval band.
| Entity category | Head's goods ceiling | Entity Tender Committee goods band |
|---|---|---|
| A, B or C ministry, department or agency | GH¢800,000 | Above GH¢800,000 up to GH¢8,000,000 |
| D ministry, department or agency | GH¢360,000 | Above GH¢360,000 up to GH¢3,200,000 |
| E ministry, department or agency | GH¢240,000 | Above GH¢240,000 up to GH¢1,000,000 |
| F1 Regional Coordinating Council | GH¢600,000 | Above GH¢600,000 up to GH¢5,000,000 |
| F2 metropolitan assembly | GH¢500,000 | Above GH¢500,000 up to GH¢3,700,000 |
| F3 municipal or district assembly | GH¢340,000 | Above GH¢340,000 up to GH¢2,700,000 |
Above the applicable Entity Tender Committee band, the schedule specifies concurrent review by the Central or Regional Tender Review Committee, as applicable. For works and services, use the corresponding column, which can have a different limit.
The Fifth Schedule governs method thresholds. Apply the statutory conditions of the method as well as the value band.
| Requirement | Request for Quotations up to | National Competitive Tendering above that ceiling up to | International Competitive Tendering above |
|---|---|---|---|
| Goods | GH¢800,000 | GH¢40,000,000 | GH¢40,000,000 |
| Works | GH¢1,800,000 | GH¢54,000,000 | GH¢54,000,000 |
| Technical services | GH¢400,000 | GH¢20,000,000 | GH¢20,000,000 |
A municipal assembly buying GH¢470,000 of standard desks may meet the goods value threshold for Request for Quotations (RFQ). It still needs Entity Tender Committee approval under the Third Schedule. Consultancy services have their own methods in the Fifth Schedule and Part Six of the Act. Use that route for advisory work.
Check Commitment Authorisation and Budget
Section 24A(1) requires the Minister for Finance's commitment authorisation before commencing a procurement falling under the PPA or the Central Tender Review Committee. Under section 24A(2), applications to the Board, a tender review committee or an Entity Tender Committee must include the authorisation before approval. The PPA's 2026 forum guidance explains the Minister's exemption for procurement within a head's approval threshold and the need to pause if the evaluated value exceeds it. Apply the budget and warrant rules from section 25 of Act 921 to any commitment, including purchases within the head's limit.
Document the Full Requirement
The PPA's GHANEPS directive requires public entities to use the Ghana Electronic Procurement System. Keep the plan, method and approvals traceable in the procurement record under sections 21 and 28. Publish the award promptly under section 31. A later digital entry cannot supply an approval that was missing when required.
If a Category B entity forecasts GH¢1.2 million for standard student desks, the combined requirement exceeds both the head's goods ceiling and the RFQ ceiling. On those facts, use the Entity Tender Committee route and national competitive tendering. The entity may plan genuine lots under section 21(2), such as deliveries to different sites. Section 21(6) prohibits dividing an order or lowering its value to avoid procurement procedures. Section 92(1) makes contravention an offence and provides, where no penalty is otherwise specified, up to 2,500 penalty units, up to five years' imprisonment, or both upon summary conviction.
A municipal assembly plans to buy GH¢515,000 of off-the-shelf classroom whiteboards and meets the other statutory conditions for Request for Quotations. Which combination follows the Third and Fifth Schedules to Act 663 as replaced by L.I. 2516?
Request for Quotations and direct approval by the head within the RCC limit.
National Competitive Tendering and Regional Tender Review Committee approval.
Request for Quotations and Entity Tender Committee approval.
International Competitive Tendering and Central Tender Review Committee approval.
A Category A procurement entity plans a GH¢10 million standard goods contract. The Second Schedule places it in the Central Tender Review Committee band. Which commitment authorisation rule applies under section 24A(1)?
Obtain the Minister for Finance’s commitment authorisation before commencing procurement.
Use the head’s existing delegation as the commitment authorisation.
Wait until the contract is signed to request commitment authorisation.
Use the Entity Tender Committee’s minutes in place of authorisation.
A Category B entity has a single GH¢1.5 million textbook requirement. An officer divides it into two GH¢750,000 RFQs solely to bypass the approval and competitive tendering procedures. Which assessment applies?
Two awards make this lawful if both are published on GHANEPS.
The division is lawful if different vendors supply each part.
The division becomes lawful once the textbooks are delivered.
Dividing the order to bypass statutory procedures contravenes section 21(6) and engages section 92.