100+ Free SC Water and Sewer Plants Practice Questions
Prepare for the South Carolina Water and Sewer Plants Contractor Examination exam with instant access — no signup required.
Loading practice questions...
Explore More South Carolina CLB Commercial Contractor Examinations
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: SC Water and Sewer Plants Exam
50 Q
Official Exam Questions
PSI SC Commercial Contractor CIB updated 5/15/2025
70%
Passing Score
PSI SC Commercial Contractor CIB updated 5/15/2025
3 hours
Time Allowed
PSI SC Commercial Contractor CIB updated 5/15/2025
USD 75
PSI Exam Fee
PSI SC Commercial Contractor CIB updated 5/15/2025
Open Book
Book Policy
PSI SC Commercial Contractor CIB updated 5/15/2025
South Carolina Water and Sewer Plants Contractor Examination is the official CLB/PSI open-book exam: 50 questions, 70% (35 of 50), 3 hours, USD 75 (bulletin updated 5/15/2025). Official delivery is English.
Sample SC Water and Sewer Plants Practice Questions
Try these sample questions to test your SC Water and Sewer Plants exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Under OSHA 29 CFR 1926 Subpart AA, which three conditions must all be present for a space to be a confined space?
2Per OSHA 1926.651, excavated material and other equipment that could fall or roll into an excavation must be kept at least how far from the edge unless a retaining device is used?
3OSHA 1926.651 requires a stairway, ladder, ramp, or other safe means of egress in trench excavations that are 4 feet or more in depth so that employees travel no more than how far laterally to reach it?
4Under OSHA 1926.652, employees in an excavation generally must be protected from cave-ins by a protective system when the excavation is how deep, unless it is entirely in stable rock?
5When testing the atmosphere of a permit-required confined space under OSHA 1926 Subpart AA, what is the required order of tests with a calibrated direct-reading instrument?
6For excavations less than 20 feet deep, what is the maximum allowable simple slope in Type C soil under OSHA 1926 Subpart P Appendix B?
7A plant wet well is large enough to enter, has a ladder as the only access, and is not designed for occupancy. Which additional condition makes it a permit-required confined space under OSHA 1926.1202?
8Which statement about OSHA excavation protective systems is correct?
9Who is required to notify South Carolina 811 before beginning excavation on a water or sewer plant site?
10Under the APWA Uniform Color Code used by SC811 locators, which colors mark potable water and sanitary sewer?
About the SC Water and Sewer Plants Exam
The South Carolina Water and Sewer Plants Contractor Examination is the official CLB classification examination administered by PSI. The official exam has 50 scored questions. Passing is 70% (35 of 50) in 3 hours. The examination is open book. PSI lists USD 75 (Candidate Information Bulletin updated 5/15/2025). Candidates must also pass Business Management and Law for Commercial Contractor. This bank is an English-language MCQ study adaptation. It does not replace required trade experience, board approval, or the official examination.
Assessment
Open-book computer-based multiple-choice. Allowed references include OSHA 29 CFR 1926, Design and Control of Concrete Mixtures (17th), Placing Reinforcing Bars (10th), Excavation and Grading Handbook (2006), DIPRA Installation Guide for Ductile Iron Pipe (2007, revised 2021), and the South Carolina 811 Excavator Manual.
Time Limit
3 hours
Passing Score
70% (35 of 50)
Exam Fee
USD 75 (PSI Services LLC (for the South Carolina Contractor's Licensing Board))
SC Water and Sewer Plants Exam Content Outline
Safety
Safety - Code of Federal Regulations (4 items)
General Plant Construction
General Plant Construction (20 items)
Concrete
Concrete (6 items)
Reinforcing Steel
Concrete - Reinforcing Steel (6 items)
Excavating and Grading
Excavating and Grading (8 items)
Design Elevations
Miscellaneous Engineering - Design Elevations (6 items)
How to Pass the SC Water and Sewer Plants Exam
What You Need to Know
- Passing score: 70% (35 of 50)
- Assessment: Open-book computer-based multiple-choice. Allowed references include OSHA 29 CFR 1926, Design and Control of Concrete Mixtures (17th), Placing Reinforcing Bars (10th), Excavation and Grading Handbook (2006), DIPRA Installation Guide for Ductile Iron Pipe (2007, revised 2021), and the South Carolina 811 Excavator Manual.
- Time limit: 3 hours
- Exam fee: USD 75
Keys to Passing
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
SC Water and Sewer Plants Study Tips from Top Performers
Frequently Asked Questions
How many questions are on the South Carolina Water and Sewer Plants Contractor Examination?
The official PSI examination has 50 scored questions. Passing is 70% (35 of 50) within 3 hours (Commercial Contractor Candidate Information Bulletin updated 5/15/2025).
How much does this PSI examination cost?
PSI lists USD 75 for this examination. The South Carolina Contractor's Licensing Board charges a separate USD 350 license application fee for general and mechanical contractor licenses.
Is this examination open book?
Yes. PSI lists the South Carolina commercial contractor examinations as open book. Listed references include OSHA 29 CFR 1926 and Design and Control of Concrete Mixtures (17th).
What is the largest topic on the SC Water and Sewer Plants exam?
The official PSI outline assigns 20 of 50 items to General Plant Construction.