SCDOT 2007 Section 301 cement-modified subgrade work includes pulverizing in-place soil, adding Portland cement, mixing, wetting, and compacting. What is the primary purpose of the cement?
- ATo chemically modify and strengthen the existing soil so it can serve as a more stable su…
- BTo replace the need for any subsequent base or pavement
- CTo convert the soil into Portland cement concrete pavement
- DTo waterproof the soil so no drainage is needed