100+ Free SC Boiler Installation Practice Questions
Prepare for the South Carolina Boiler Installation Contractor Examination exam with instant access — no signup required.
Loading practice questions...
Explore More South Carolina CLB Commercial Contractor Examinations
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: SC Boiler Installation Exam
50 Q
Official Exam Questions
PSI SC Commercial Contractor CIB updated 5/15/2025
70%
Passing Score (35 of 50)
PSI SC Commercial Contractor CIB updated 5/15/2025
3 hours
Time Allowed
PSI SC Commercial Contractor CIB updated 5/15/2025
USD 60
PSI Exam Fee
PSI SC Commercial Contractor CIB updated 5/15/2025
Open Book
Book Policy
PSI SC Commercial Contractor CIB updated 5/15/2025
South Carolina Boiler Installation Contractor Examination is the official CLB/PSI open-book exam: 50 questions, 70% (35 of 50), 3 hours, USD 60 (bulletin updated 5/15/2025). Official delivery is English.
Sample SC Boiler Installation Practice Questions
Try these sample questions to test your SC Boiler Installation exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Under ASME BPVC Section IV service restrictions, a heating boiler is limited to which combination of steam pressure, hot-water pressure, and hot-water temperature?
2Per the 2021 International Mechanical Code, controls and safety devices for boilers shall meet ASME CSD-1 or NFPA 85 at which fuel-input breakpoint?
3Unless otherwise approved, 2021 IMC working-clearance rules require passageways around all sides of a boiler to have an unobstructed width of not less than:
4Under the 2021 IMC, how must a hot-water boiler be protected from overpressure?
5Which 2021 IMC statement about expansion tanks on hot-water heating systems is correct?
6South Carolina’s Boiler Installation contractor classification may be obtained without the technical examination if a qualified individual of the company holds which credential?
7Per 2021 IMC Table 1004.3.1, what is the minimum clearance from the top of a boiler that has a manhole on top to the ceiling or other overhead obstruction, unless a greater clearance in that table applies?
8A high-pressure steam boiler has a steam-generating capacity of 6,200 pounds per hour. What minimum top clearance does 2021 IMC Table 1004.3.1 require from the top of the boiler to the ceiling?
9Which 2021 IMC valve rule applies to boiler supply and return connections?
10The 2021 IMC low-water-cutoff requirement for steam and hot-water boilers has which exception?
About the SC Boiler Installation Exam
The South Carolina Boiler Installation Contractor Examination is the official CLB classification examination administered by PSI. The official exam has 50 scored questions. Passing is 70% (35 of 50) in 3 hours. The examination is open book. PSI lists USD 60 (South Carolina Commercial Contractor Candidate Information Bulletin updated 5/15/2025). Install, repair, and service boilers and boiler piping including the boiler machinery and dryer rolls. An ASME S stamp or NBBPVI R stamp can substitute for this technical examination if licensure requirements are otherwise met. All commercial general and mechanical contractor candidates must pass the Business Management and Law for Commercial Contractor Examination in addition to this technical examination. LLR charges a separate USD 350 license application fee. This bank is an English-language MCQ study adaptation. It does not replace required trade experience, board approval, financial statements or bonds, or the official examination.
Assessment
Open-book computer-based multiple-choice. Allowed references are listed in the South Carolina Commercial Contractor Candidate Information Bulletin updated 5/15/2025.
Time Limit
3 hours
Passing Score
70% (35 of 50)
Exam Fee
USD 60 (PSI Services LLC (for the South Carolina Contractor's Licensing Board))
SC Boiler Installation Exam Content Outline
Code Compliance
Code Compliance (10 items)
Boilers - Low Pressure
Boilers - Low Pressure (12 items)
Boilers - High Pressure
Boilers - High Pressure (8 items)
Boilers - Steam Traps
Boilers - Steam Traps (5 items)
Boilers - Safety
Boilers - Safety (5 items)
Piping
Piping (4 items)
Welding
Welding (6 items)
How to Pass the SC Boiler Installation Exam
What You Need to Know
- Passing score: 70% (35 of 50)
- Assessment: Open-book computer-based multiple-choice. Allowed references are listed in the South Carolina Commercial Contractor Candidate Information Bulletin updated 5/15/2025.
- Time limit: 3 hours
- Exam fee: USD 60
Keys to Passing
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
SC Boiler Installation Study Tips from Top Performers
Frequently Asked Questions
How many questions are on the South Carolina Boiler Installation Contractor Examination?
The official PSI examination has 50 scored questions. Passing is 70% (35 of 50) within 3 hours (South Carolina Commercial Contractor Candidate Information Bulletin updated 5/15/2025).
How much does the SC Boiler Installation exam cost?
PSI lists USD 60 for this examination. The South Carolina Contractor's Licensing Board charges a separate USD 350 license application fee.
Is the SC Boiler Installation exam open book?
Yes. PSI lists the commercial contractor examinations as open book. Candidates may bring the PSI-listed references for this classification. Temporary tabs such as Post-it notes are prohibited.
Can an ASME or National Board stamp replace this technical examination?
Yes. To qualify for the boiler installation subclassification, a person must pass this technical examination or hold the ASME S stamp or the NBBPVI R stamp and meet the remaining licensure requirements.