100+ Free SC Water and Sewer Lines Practice Questions
Prepare for the South Carolina Water and Sewer Lines Contractor Examination exam with instant access — no signup required.
Loading practice questions...
Explore More South Carolina CLB Commercial Contractor Examinations
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: SC Water and Sewer Lines Exam
50 Q
Official Exam Questions
PSI SC Commercial Contractor CIB updated 5/15/2025
70%
Passing Score
PSI SC Commercial Contractor CIB updated 5/15/2025
3 hours
Time Allowed
PSI SC Commercial Contractor CIB updated 5/15/2025
USD 60
PSI Exam Fee
PSI SC Commercial Contractor CIB updated 5/15/2025
Open Book
Book Policy
PSI SC Commercial Contractor CIB updated 5/15/2025
South Carolina Water and Sewer Lines Contractor Examination is the official CLB/PSI open-book exam: 50 questions, 70% (35 of 50), 3 hours, USD 60 (bulletin updated 5/15/2025). Official delivery is English.
Sample SC Water and Sewer Lines Practice Questions
Try these sample questions to test your SC Water and Sewer Lines exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Per 29 CFR 1926.651, a stairway, ladder, ramp, or other safe means of egress is required in a trench excavation once the trench reaches what minimum depth?
2Unless a retaining device is used, excavated spoil that could fall or roll into a water-line trench must be kept at least how far from the edge of the excavation?
3Under 29 CFR 1926.652, a protective system against cave-ins is required in excavations that are 5 feet or deeper unless which condition is met?
4Under 29 CFR 1926 Subpart P, which statement best describes a competent person for excavation work?
5For an excavation less than 20 feet deep in Type C soil, what is the maximum allowable slope under OSHA 1926 Subpart P Appendix B?
6A 4-foot-deep sewer trench is 80 feet long. How must ladders or other means of egress be spaced under 29 CFR 1926.651(c)(2)?
7Sloping or benching for an excavation greater than 20 feet deep must be designed by whom?
8Where oxygen deficiency or a hazardous atmosphere exists or could reasonably be expected, the atmosphere in an excavation shall be tested before employees enter once the excavation is greater than what depth?
9A cohesive clay has an unconfined compressive strength of 1.8 tsf, but the material was previously disturbed when an old sewer was removed. How must a competent person classify that soil under Appendix A?
10How often must a competent person inspect excavations, adjacent areas, and protective systems under 29 CFR 1926.651(k)?
About the SC Water and Sewer Lines Exam
The South Carolina Water and Sewer Lines Contractor Examination is the official CLB classification examination administered by PSI. The official exam has 50 scored questions. Passing is 70% (35 of 50) in 3 hours. The examination is open book. PSI lists USD 60 (Candidate Information Bulletin updated 5/15/2025). Candidates must also pass Business Management and Law for Commercial Contractor. This bank is an English-language MCQ study adaptation. It does not replace required trade experience, board approval, or the official examination.
Assessment
Open-book computer-based multiple-choice. Allowed references include OSHA 29 CFR 1926, DIPRA Installation Guide for Ductile Iron Pipe (2007, revised 2021), ACPA Concrete Pipe & Box Culvert resources, Excavation and Grading Handbook (2006), and the South Carolina 811 Excavator Manual.
Time Limit
3 hours
Passing Score
70% (35 of 50)
Exam Fee
USD 60 (PSI Services LLC (for the South Carolina Contractor's Licensing Board))
SC Water and Sewer Lines Exam Content Outline
Safety
Safety - Code of Federal Regulations (6 items)
General Knowledge
General Knowledge (7 items)
Design Elevations
Miscellaneous Engineering - Design Elevations (7 items)
Concrete Pipe Installation
Underground Utilities - Concrete Pipe Installation (12 items)
Ductile Pipe Installation
Underground Utilities - Ductile Pipe Installation (14 items)
Excavating and Grading
Excavating and Grading (4 items)
How to Pass the SC Water and Sewer Lines Exam
What You Need to Know
- Passing score: 70% (35 of 50)
- Assessment: Open-book computer-based multiple-choice. Allowed references include OSHA 29 CFR 1926, DIPRA Installation Guide for Ductile Iron Pipe (2007, revised 2021), ACPA Concrete Pipe & Box Culvert resources, Excavation and Grading Handbook (2006), and the South Carolina 811 Excavator Manual.
- Time limit: 3 hours
- Exam fee: USD 60
Keys to Passing
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
SC Water and Sewer Lines Study Tips from Top Performers
Frequently Asked Questions
How many questions are on the South Carolina Water and Sewer Lines Contractor Examination?
The official PSI examination has 50 scored questions. Passing is 70% (35 of 50) within 3 hours (Commercial Contractor Candidate Information Bulletin updated 5/15/2025).
How much does this PSI examination cost?
PSI lists USD 60 for this examination. The South Carolina Contractor's Licensing Board charges a separate USD 350 license application fee for general and mechanical contractor licenses.
Is this examination open book?
Yes. PSI lists the South Carolina commercial contractor examinations as open book. Listed references include the DIPRA Installation Guide for Ductile Iron Pipe and OSHA 29 CFR 1926.
What is the largest topic on the SC Water and Sewer Lines exam?
The official PSI outline assigns 14 of 50 items to Underground Utilities - Ductile Pipe Installation.