100+ Free SC Public Utilities Electrical Practice Questions
Prepare for the South Carolina Public Utilities - Electrical Contractor Examination exam with instant access — no signup required.
Loading practice questions...
Explore More South Carolina CLB Commercial Contractor Examinations
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: SC Public Utilities Electrical Exam
50 Q
Official Exam Questions
PSI SC Commercial Contractor CIB updated 5/15/2025
70%
Passing Score
PSI SC Commercial Contractor CIB updated 5/15/2025
3 hours
Time Allowed
PSI SC Commercial Contractor CIB updated 5/15/2025
USD 60
PSI Exam Fee
PSI SC Commercial Contractor CIB updated 5/15/2025
Open Book
Book Policy
PSI SC Commercial Contractor CIB updated 5/15/2025
South Carolina Public Utilities - Electrical Contractor Examination is the official CLB/PSI open-book exam: 50 questions, 70% (35 of 50), 3 hours, USD 60 (bulletin updated 5/15/2025). Official delivery is English.
Sample SC Public Utilities Electrical Practice Questions
Try these sample questions to test your SC Public Utilities Electrical exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1A 37.5 kVA single-phase pole-mount transformer is fully loaded on a 240 V secondary. What is the approximate full-load secondary current?
2H1 and X1 markings on a distribution transformer identify which terminals?
3Oil in a liquid-filled overhead distribution transformer is used primarily to:
4On a completely self-protected (CSP) overhead distribution transformer, the secondary overload device is typically:
5A 50 kVA single-phase transformer has a 7,620 V primary. What is the approximate full-load primary current?
6Three 25 kVA single-phase transformers are banked closed-delta. What is the three-phase bank rating?
7A single-phase transformer is rated 7,200 V primary and 240 V secondary. If the primary winding has 1,500 turns, how many secondary turns are required for that voltage ratio?
8A delta-wye transformer bank is commonly used to serve 480Y/277 V three-phase loads from a delta primary feeder because the wye secondary:
9A no-load tap changer (NLTC) on a distribution transformer is intended to be operated:
10Before paralleling two single-phase distribution transformers on the same secondary, a line crew must verify that the units have matching:
About the SC Public Utilities Electrical Exam
The South Carolina Public Utilities - Electrical Contractor Examination is the official CLB classification examination administered by PSI. The official exam has 50 scored questions. Passing is 70% (35 of 50) in 3 hours. The examination is open book. PSI lists USD 60 (Candidate Information Bulletin updated 5/15/2025). The scope is limited to line construction for public and private companies, high-voltage work over 2,400 volts, and traffic-signal and highway-lighting work. This bank is an English-language MCQ study adaptation. It does not replace required trade experience, board approval, or the official examination.
Assessment
Open-book computer-based multiple-choice. Allowed references include the National Electrical Safety Code (C2-1997), the 2020 NEC with SC modifications, OSHA 29 CFR 1926, Lineman's and Cableman's Handbook (12th or 14th), American Electricians' Handbook (16th, 2013), and the South Carolina 811 Excavator Manual.
Time Limit
3 hours
Passing Score
70% (35 of 50)
Exam Fee
USD 60 (PSI Services LLC (for the South Carolina Contractor's Licensing Board))
SC Public Utilities Electrical Exam Content Outline
Transformers
Transformers (6 items)
Electrical Knowledge
Electrical Knowledge (5 items)
Conductors
Conductors (5 items)
Overhead Lines
Overhead Lines (7 items)
Underground Lines
Underground Lines (4 items)
Equipment and Safety
Equipment and Safety (8 items)
Grounding Methods
Grounding Methods (3 items)
Service Drops and Laterals
Service Drops and Laterals (4 items)
Poles and Structures
Poles and Structures (4 items)
Electric Supply Stations
Electric Supply Stations (4 items)
How to Pass the SC Public Utilities Electrical Exam
What You Need to Know
- Passing score: 70% (35 of 50)
- Assessment: Open-book computer-based multiple-choice. Allowed references include the National Electrical Safety Code (C2-1997), the 2020 NEC with SC modifications, OSHA 29 CFR 1926, Lineman's and Cableman's Handbook (12th or 14th), American Electricians' Handbook (16th, 2013), and the South Carolina 811 Excavator Manual.
- Time limit: 3 hours
- Exam fee: USD 60
Keys to Passing
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
SC Public Utilities Electrical Study Tips from Top Performers
Frequently Asked Questions
How many questions are on the South Carolina Public Utilities - Electrical Contractor Examination?
The official PSI examination has 50 scored questions. Passing is 70% (35 of 50) within 3 hours (Commercial Contractor Candidate Information Bulletin updated 5/15/2025).
How much does this PSI examination cost?
PSI lists USD 60 for this examination. The South Carolina Contractor's Licensing Board charges a separate USD 350 license application fee for general and mechanical contractor licenses.
Is this examination open book?
Yes. PSI lists the South Carolina commercial contractor examinations as open book. Listed references include the National Electrical Safety Code (C2-1997) and the 2020 NEC with SC modifications.
What voltage threshold is in the Public Electrical Utility scope?
The PSI bulletin states the holder may perform high-voltage cable splicing and pulling wire for systems in excess of 2,400 volts, plus traffic-signal and highway-lighting work.