Measurement and Instrumentation
Not publishedof exam
General Applications
Not publishedof exam
Electrical Safety
Not publishedof exam
Circuit Analysis
Not publishedof exam
Power Electronic Circuits and Control Devices
Not publishedof exam
Rotating Machines
Not publishedof exam
Electric Power Devices
Not publishedof exam
Transmission and Distribution Analysis
Not publishedof exam
Protection
Not publishedof exam
Quick Facts
- Exam owner
- NCEES
- Format
- Year-round computer-based testing
- Questions
- 80 total
- Testing time
- 8 hours
- Appointment
- 9 hours
- Scheduled break
- 50 minutes, optional
- Supplied materials
- Searchable handbook and standards
- Reference policy
- Closed book, supplied references only
- Units
- SI and US customary
- Blueprint effective
- October 2025
- Domain ranges
- Questions per knowledge area
CT vs VT
Current transformer
- Primary in series
- Steps current down
- Open secondary creates voltage hazard
Voltage transformer
- Primary across measured voltage
- Steps voltage down
- Shorted secondary creates overcurrent hazard
Check the secondary circuit
Measurement Picker
- Scale primary current→Current transformer(Check ratio and burden)
- Scale primary voltage→Voltage transformer(Check ratio and burden)
- Assess insulation deterioration→Insulation resistance trend(Compare at similar conditions)
- Test isolated ground electrode→Fall-of-potential test(Auxiliary probes)
- Electrode has parallel return paths→Consider stakeless clamp test(Result is loop resistance)
Metering and Tests
- CT ratio
- Primary amps ÷ secondary amps
- VT ratio
- Primary volts ÷ secondary volts
- Instrument transformer burden
- Connected secondary load
- CT saturation
- Distorts secondary current
- Metered primary watts
- Secondary watts × both ratiosUnscaled meter, matched connections
- Insulation resistance
- DC test, commonly reported in MΩ
- Polarization index
- R₁₀min ÷ R₁min
- Fall-of-potential test
- Separate current and voltage probes
- Stakeless ground test
- Requires a closed return loop
Grounding vs Bonding
Grounding
- Earth reference
- Limits voltage to earth
Bonding
- Joins conductive parts
- Establishes electrical continuity
- Supports fault return to source
Trace the fault path
Lighting Demand and Grounding
- Lux
- Lumens per square meter
- Foot-candle
- Lumens per square foot
- Lumen method
- Average illuminance ≈ Φ·CU·LLF/A
- Φ in lumen method
- Total source lumens
- CU and LLF
- Utilization and light loss factors
- Demand factor
- Peak demand ÷ connected load
- Load factor
- Average demand ÷ peak demandSame interval
- Average demand
- Energy ÷ interval duration
- Lightning air terminal
- Intercepts direct lightning strikes
- Down conductor
- Connects strike termination to grounding
- Surge protective device
- Limits transient overvoltage
- Step voltage
- Ground potential between feet
- Touch voltage
- Structure-to-feet potential difference
Load vs Demand Factor
Load factor
- Average demand numerator
- Peak demand denominator
Demand factor
- Peak demand numerator
- Connected load denominator
Track where peak demand goes
Shock vs Arc Flash
Shock
- Current through the body
- Limited and restricted approach boundaries
Arc flash
- Thermal exposure from arc
- Arc-flash boundary uses incident energy
Identify the hazard first
Exam Code Picker
- Premises wiring and installations→NFPA 70 (2020 NEC)(Exam edition)
- Workplace shock or arc flash→NFPA 70E (2021)(Exam edition)
- Utility supply or communication lines→ANSI C2 (2017 NESC)(Exam edition)
- Chemical-process gas/vapor classification→NFPA 497 (2021)(Flammable liquids, gases, vapors)
- Chemical-process dust classification→NFPA 499 (2021)(Combustible dust)
- Aerosol manufacture or storage→NFPA 30B (2023)(Aerosol products)
Installation and Safety Lookups
- Grounding and bonding
- NEC Article 250
- Conductor ampacity lookup
- NEC Table 310.16 where applicable
- Ampacity sizing checks
- Ambient, loaded conductors, terminal limits
- Raceway fill lookup
- NEC Chapter 9
- Hazardous Class I
- Flammable gases or vapors
- Hazardous Class II
- Combustible dust
- Hazardous Class III
- Ignitible fibers or flyings
- Health care facilities
- NEC Article 517
- Emergency systems
- NEC Article 700
- Legally required standby
- NEC Article 701
- Optional standby
- NEC Article 702
- Arc-flash boundary
- Distance at 1.2 cal/cm²Incident energy threshold
- Shock approach boundaries
- Limited and restricted
Phase Sequences
Positive forward, negative reverse, zero together
Wye vs Delta
Balanced wye
- VLL = √3·Vφ
- IL = Iφ
Balanced delta
- VLL = Vφ
- IL = √3·Iφ
Check line and phase labels
Three-Phase Power
- VLL and IL
- Line-to-line volts and line amps
- Vφ and Iφ
- Phase volts and phase amps
- RMS phasors
- Vφ and Iφ use RMS
- Single-phase complex power
- S = VI*I* is current conjugate
- Balanced three-phase complex power
- S = 3VφIφ*
- Balanced apparent power
- |S| = √3·VLL·IL
- Real power from apparent
- P = |S|·PF
- Power factor
- PF = P/|S|
- Sinusoidal reactive power
- Q = |S|·sinφVoltage angle minus current angle
- Lagging load
- Inductive Q is positive
- Leading load
- Capacitive Q is negative
Per-Unit and Circuit Models
- Per-unit impedance
- Zpu = ZΩ/Zbase
- Three-phase base inputs
- Total VA and line-to-line volts
- Base impedance
- Zbase = VLL,base²/S₃φ,base
- Base current
- Ibase = S₃φ,base/(√3·VLL,base)
- Change per-unit impedance base
- Znew = Zold·(Snew÷Sold)·(Vold÷Vnew)²Same voltage side
- Across transformer zones
- Scale base kV by line-voltage ratio
- Thevenin voltage
- Open-circuit terminal voltage
- Norton current
- Short-circuit terminal current
- DC resistive power
- P = I²R = V²/R
Contacts in Ladder Logic
Series needs all, parallel needs any
Converter Picker
- AC source, DC output→Rectifier
- DC source, AC output→Inverter
- Lower DC voltage→Buck topology
- Raise DC voltage→Boost topology
- Adjust AC motor running speed→Variable-frequency drive
Converters and Control Logic
- Rectifier
- AC → DC
- Inverter
- DC → AC
- Buck converter
- Steps DC voltage down
- Boost converter
- Steps DC voltage up
- Variable-frequency drive
- Varies AC motor supply frequency
- Grid-following inverter
- Tracks an existing grid waveform
- Grid-forming inverter
- Establishes a voltage waveform
- Normally open logic contact
- Passes logic when bit is true
- Normally closed logic contact
- Passes logic when bit is false
- Coil in ladder logic
- Output follows rung condition
Slip and Rotor Frequency
Speed gap over synchronous speed gives slip
Induction vs Synchronous
Induction motor
- Rotor currents induced by slip
- Runs below synchronous speed
Synchronous motor
- Rotor locks to rotating field
- Runs at synchronous speed
Compare steady-state motoring speeds
Machine Speed and Starting
- Synchronous speed, rpm
- nₛ = 120f/pf in Hz, p poles
- Induction slip
- s = (nₛ − nᵣ)/nₛnᵣ is rotor speed
- Induction rotor frequency
- fᵣ = |s|f
- Direct-on-line start
- Applies full line voltage
- Wye-delta start
- Starts in wye, runs delta
- Autotransformer start
- Tap reduces starting motor voltage
- Soft starter
- Ramps motor voltage at startup
- Synchronous motor excitation
- Adjusts reactive power exchangeWound-field machine
Transformer Test Pair
Open-circuit test
- Secondary unloaded
- Estimates core loss
- Identifies shunt branch
Short-circuit test
- Reduced applied voltage
- Measures load loss
- Identifies series impedance
Match test to equivalent branch
Transformers and Test Results
- Ideal winding voltage ratio
- V₁/V₂ = N₁/N₂
- Ideal winding current magnitudes
- |I₁|/|I₂| = N₂/N₁
- Impedance referred to side 1
- Zref = Zload·(N₁/N₂)²Load impedance on side 2
- Transformer efficiency
- η = Pout/(Pout + losses)
- Winding copper loss
- Varies with current squared
- Nameplate percent impedance
- %Z ÷ 100 gives rated-base pu
- Open-circuit test
- Core loss and shunt branchNear rated voltage
- Short-circuit test
- Load loss and series impedanceAt specified test current
Generation and Storage
- Shunt capacitor bank
- Supplies capacitive reactive power
- Capacitor stored energy
- E = ½CV²
- Battery storage
- Stores energy electrochemically
- Double-layer ultracapacitor
- Stores charge at electrode interfaces
- Battery energy rating
- kWh measures energy capacity
- Battery power rating
- kW measures charge/discharge rate
- Photovoltaic module
- Converts sunlight to DC electricity
- Wind generator
- Converts shaft power to electricity
Fault Sequences
Three-phase one, line-line two, ground path check
Fault Network Picker
- Balanced three-phase fault→Positive sequence only
- Single line to ground→Series Z₁, Z₂, Z₀(Faulted phase carries 3I₀)
- Line to line without ground→Positive and negative sequences(Zero sequence absent)
- Bolted double line to ground→Z₁ + (Z₂ ∥ Z₀)(Positive-sequence input impedance)
- Convert per-unit fault current→Multiply by local base amps(Use faulted voltage zone)
Voltage and Power Quality
- Balanced three-phase voltage drop
- ΔVLL ≈ √3·IL·(R·cosφ+X·sinφ)Total per-phase R and X
- Voltage support by taps
- Changes transformer ratio
- PF correction capacitor kVAR
- Qc = P·(tanφinitial−tanφtarget)P in kW
- Total harmonic distortion
- Harmonic RMS ÷ fundamental RMS
- Voltage sag
- Temporary RMS voltage reduction
- PQ bus inputs
- Specified P and Q
- PV bus inputs
- Specified P and voltage magnitude
- Slack bus inputs
- Specified voltage magnitude and angle
- Lossless two-bus real power
- P₁₂ = V₁V₂·sinδ/XPer-phase or per-unit
- Rotor-angle stability
- Ability to remain in synchronism
Faults and Transformer Connections
- Bolted balanced fault current
- I₃φ = E/Z₁
- E in fault formulas
- Prefault phase voltage or pu
- Z₀, Z₁, Z₂
- Zero, positive, negative sequence impedances
- Bolted line-to-ground fault current
- If = 3E/(Z₁+Z₂+Z₀)
- Nonzero line-to-ground fault impedance
- Add 3Zf to denominator
- Bolted line-to-line current
- |If| = √3·|E/(Z₁+Z₂)|Faulted line magnitude
- Residual current
- Ia + Ib + Ic = 3I₀
- Delta winding zero sequence
- May circulate within winding
- Delta line zero sequence
- Blocked at delta line terminals
- Delta-wye vector groups
- Dy1 lags, Dy11 leadsSecondary shift magnitude 30°
50 vs 51
50 instantaneous
- Current pickup
- No intentional time delay
51 time overcurrent
- Current pickup
- Definite or inverse timing
Match timing to coordination
Protection Picker
- Overcurrent without intentional delay→50 element
- Overcurrent with timed operation→51 element
- Apparent impedance within reach→21 distance element
- Current mismatch across zone→87 differential element
- Voltage below pickup setting→27 undervoltage element
- Compare signals at line terminals→Pilot protection(Communications channel)
- Temporary overhead feeder fault→Automatic recloser(Restores service if fault clears)
Relay Numbers and Methods
- 50
- Instantaneous overcurrent
- 51
- Time overcurrent
- 21
- Distance on apparent impedance
- 27
- Undervoltage
- 87
- Differential current balance
- Pilot protection
- Communications link coordinates line terminals
- Differential zone
- Bounded by CT locations
- Differential restraint
- Improves through-fault security
Device Ratings and Coordination
- Fuse
- Melts to interrupt overcurrent
- Circuit breaker
- Interrupts current within rated duty
- Recloser
- Trips and recloses automatically
- Continuous current rating
- Load current carrying limit
- Interrupting rating
- Fault current interruption limitAt stated voltage and conditions
- Time-current curve
- Operating time versus current
- Protective coordination
- Downstream clears before upstream backup
- Fuse coordination curves
- Minimum melt and total clearing
- Relay pickup
- Threshold to start timing/operation
Common Traps
Metering Basis
Raw meter secondary reading ≠ Primary-scaled instrument reading
Ground Test Return Path
Stakeless ground-loop resistance ≠ Isolated electrode resistance
Code Lookup
Exam-specified code edition ≠ Latest published code edition
Three-Phase Magnitudes
Line-to-line voltage ≠ Winding phase voltage
Per-Unit Bases
Equipment nameplate per-unit impedance ≠ System-base per-unit impedance
Fault Current
SLG sequence current I₀ ≠ SLG fault current 3I₀
Breaker Ratings
Continuous load amp rating ≠ Fault interrupting amp rating
Protection Timing
Relay operating time ≠ Total fault clearing time
Last Minute
- 1.Use exam-listed standard editions.
- 2.Search supplied codes chapter by chapter.
- 3.Confirm line versus winding quantities.
- 4.Use RMS phasors for complex power.
- 5.Match impedance bases before combining.
- 6.Use faulted bus base amps.
- 7.Trace neutral and zero-sequence paths.
- 8.Verify transformer vector group.
- 9.Use slip as a fraction.
- 10.Check breaker fault interrupting duty.
- 11.Compare clearing curves across fault currents.