Cheat sheet

PE Electrical Power Cheat Sheet

Measurement and Instrumentation

Not publishedof exam

General Applications

Not publishedof exam

Electrical Safety

Not publishedof exam

Circuit Analysis

Not publishedof exam

Power Electronic Circuits and Control Devices

Not publishedof exam

Rotating Machines

Not publishedof exam

Electric Power Devices

Not publishedof exam

Transmission and Distribution Analysis

Not publishedof exam

Protection

Not publishedof exam

Quick Facts

Exam owner
NCEES
Format
Year-round computer-based testing
Questions
80 total
Testing time
8 hours
Appointment
9 hours
Scheduled break
50 minutes, optional
Supplied materials
Searchable handbook and standards
Reference policy
Closed book, supplied references only
Units
SI and US customary
Blueprint effective
October 2025
Domain ranges
Questions per knowledge area

CT vs VT

Current transformer

  • Primary in series
  • Steps current down
  • Open secondary creates voltage hazard

Voltage transformer

  • Primary across measured voltage
  • Steps voltage down
  • Shorted secondary creates overcurrent hazard

Check the secondary circuit

Measurement Picker

  1. Scale primary current→Current transformer(Check ratio and burden)
  2. Scale primary voltage→Voltage transformer(Check ratio and burden)
  3. Assess insulation deterioration→Insulation resistance trend(Compare at similar conditions)
  4. Test isolated ground electrode→Fall-of-potential test(Auxiliary probes)
  5. Electrode has parallel return paths→Consider stakeless clamp test(Result is loop resistance)

Metering and Tests

CT ratio
Primary amps ÷ secondary amps
VT ratio
Primary volts ÷ secondary volts
Instrument transformer burden
Connected secondary load
CT saturation
Distorts secondary current
Metered primary watts
Secondary watts × both ratiosUnscaled meter, matched connections
Insulation resistance
DC test, commonly reported in MΩ
Polarization index
R₁₀min ÷ R₁min
Fall-of-potential test
Separate current and voltage probes
Stakeless ground test
Requires a closed return loop

Grounding vs Bonding

Grounding

  • Earth reference
  • Limits voltage to earth

Bonding

  • Joins conductive parts
  • Establishes electrical continuity
  • Supports fault return to source

Trace the fault path

Lighting Demand and Grounding

Lux
Lumens per square meter
Foot-candle
Lumens per square foot
Lumen method
Average illuminance ≈ Φ·CU·LLF/A
Φ in lumen method
Total source lumens
CU and LLF
Utilization and light loss factors
Demand factor
Peak demand ÷ connected load
Load factor
Average demand ÷ peak demandSame interval
Average demand
Energy ÷ interval duration
Lightning air terminal
Intercepts direct lightning strikes
Down conductor
Connects strike termination to grounding
Surge protective device
Limits transient overvoltage
Step voltage
Ground potential between feet
Touch voltage
Structure-to-feet potential difference

Load vs Demand Factor

Load factor

  • Average demand numerator
  • Peak demand denominator

Demand factor

  • Peak demand numerator
  • Connected load denominator

Track where peak demand goes

Shock vs Arc Flash

Shock

  • Current through the body
  • Limited and restricted approach boundaries

Arc flash

  • Thermal exposure from arc
  • Arc-flash boundary uses incident energy

Identify the hazard first

Exam Code Picker

  1. Premises wiring and installations→NFPA 70 (2020 NEC)(Exam edition)
  2. Workplace shock or arc flash→NFPA 70E (2021)(Exam edition)
  3. Utility supply or communication lines→ANSI C2 (2017 NESC)(Exam edition)
  4. Chemical-process gas/vapor classification→NFPA 497 (2021)(Flammable liquids, gases, vapors)
  5. Chemical-process dust classification→NFPA 499 (2021)(Combustible dust)
  6. Aerosol manufacture or storage→NFPA 30B (2023)(Aerosol products)

Installation and Safety Lookups

Grounding and bonding
NEC Article 250
Conductor ampacity lookup
NEC Table 310.16 where applicable
Ampacity sizing checks
Ambient, loaded conductors, terminal limits
Raceway fill lookup
NEC Chapter 9
Hazardous Class I
Flammable gases or vapors
Hazardous Class II
Combustible dust
Hazardous Class III
Ignitible fibers or flyings
Health care facilities
NEC Article 517
Emergency systems
NEC Article 700
Legally required standby
NEC Article 701
Optional standby
NEC Article 702
Arc-flash boundary
Distance at 1.2 cal/cm²Incident energy threshold
Shock approach boundaries
Limited and restricted

Phase Sequences

Positive forward, negative reverse, zero together

Positive: ABCNegative: ACBZero: phases in phase

Wye vs Delta

Balanced wye

  • VLL = √3·Vφ
  • IL = Iφ

Balanced delta

  • VLL = Vφ
  • IL = √3·Iφ

Check line and phase labels

Three-Phase Power

VLL and IL
Line-to-line volts and line amps
Vφ and Iφ
Phase volts and phase amps
RMS phasors
Vφ and Iφ use RMS
Single-phase complex power
S = VI*I* is current conjugate
Balanced three-phase complex power
S = 3VφIφ*
Balanced apparent power
|S| = √3·VLL·IL
Real power from apparent
P = |S|·PF
Power factor
PF = P/|S|
Sinusoidal reactive power
Q = |S|·sinφVoltage angle minus current angle
Lagging load
Inductive Q is positive
Leading load
Capacitive Q is negative

Per-Unit and Circuit Models

Per-unit impedance
Zpu = ZΩ/Zbase
Three-phase base inputs
Total VA and line-to-line volts
Base impedance
Zbase = VLL,base²/S₃φ,base
Base current
Ibase = S₃φ,base/(√3·VLL,base)
Change per-unit impedance base
Znew = Zold·(Snew÷Sold)·(Vold÷Vnew)²Same voltage side
Across transformer zones
Scale base kV by line-voltage ratio
Thevenin voltage
Open-circuit terminal voltage
Norton current
Short-circuit terminal current
DC resistive power
P = I²R = V²/R

Contacts in Ladder Logic

Series needs all, parallel needs any

Series contacts: ANDParallel branches: ORNormally closed test: NOT

Converter Picker

  1. AC source, DC output→Rectifier
  2. DC source, AC output→Inverter
  3. Lower DC voltage→Buck topology
  4. Raise DC voltage→Boost topology
  5. Adjust AC motor running speed→Variable-frequency drive

Converters and Control Logic

Rectifier
AC → DC
Inverter
DC → AC
Buck converter
Steps DC voltage down
Boost converter
Steps DC voltage up
Variable-frequency drive
Varies AC motor supply frequency
Grid-following inverter
Tracks an existing grid waveform
Grid-forming inverter
Establishes a voltage waveform
Normally open logic contact
Passes logic when bit is true
Normally closed logic contact
Passes logic when bit is false
Coil in ladder logic
Output follows rung condition

Slip and Rotor Frequency

Speed gap over synchronous speed gives slip

Speed gap: nₛ − nᵣRotor Hz: |s| times supply Hz

Induction vs Synchronous

Induction motor

  • Rotor currents induced by slip
  • Runs below synchronous speed

Synchronous motor

  • Rotor locks to rotating field
  • Runs at synchronous speed

Compare steady-state motoring speeds

Machine Speed and Starting

Synchronous speed, rpm
nₛ = 120f/pf in Hz, p poles
Induction slip
s = (nₛ − nᵣ)/nₛnᵣ is rotor speed
Induction rotor frequency
fᵣ = |s|f
Direct-on-line start
Applies full line voltage
Wye-delta start
Starts in wye, runs delta
Autotransformer start
Tap reduces starting motor voltage
Soft starter
Ramps motor voltage at startup
Synchronous motor excitation
Adjusts reactive power exchangeWound-field machine

Transformer Test Pair

Open-circuit test

  • Secondary unloaded
  • Estimates core loss
  • Identifies shunt branch

Short-circuit test

  • Reduced applied voltage
  • Measures load loss
  • Identifies series impedance

Match test to equivalent branch

Transformers and Test Results

Ideal winding voltage ratio
V₁/V₂ = N₁/N₂
Ideal winding current magnitudes
|I₁|/|I₂| = N₂/N₁
Impedance referred to side 1
Zref = Zload·(N₁/N₂)²Load impedance on side 2
Transformer efficiency
η = Pout/(Pout + losses)
Winding copper loss
Varies with current squared
Nameplate percent impedance
%Z ÷ 100 gives rated-base pu
Open-circuit test
Core loss and shunt branchNear rated voltage
Short-circuit test
Load loss and series impedanceAt specified test current

Generation and Storage

Shunt capacitor bank
Supplies capacitive reactive power
Capacitor stored energy
E = ½CV²
Battery storage
Stores energy electrochemically
Double-layer ultracapacitor
Stores charge at electrode interfaces
Battery energy rating
kWh measures energy capacity
Battery power rating
kW measures charge/discharge rate
Photovoltaic module
Converts sunlight to DC electricity
Wind generator
Converts shaft power to electricity

Fault Sequences

Three-phase one, line-line two, ground path check

Balanced: Z₁ onlyLine-line: Z₁ and Z₂Ground fault: trace Z₀

Fault Network Picker

  1. Balanced three-phase fault→Positive sequence only
  2. Single line to ground→Series Z₁, Z₂, Z₀(Faulted phase carries 3I₀)
  3. Line to line without ground→Positive and negative sequences(Zero sequence absent)
  4. Bolted double line to ground→Z₁ + (Z₂ ∥ Z₀)(Positive-sequence input impedance)
  5. Convert per-unit fault current→Multiply by local base amps(Use faulted voltage zone)

Voltage and Power Quality

Balanced three-phase voltage drop
ΔVLL ≈ √3·IL·(R·cosφ+X·sinφ)Total per-phase R and X
Voltage support by taps
Changes transformer ratio
PF correction capacitor kVAR
Qc = P·(tanφinitial−tanφtarget)P in kW
Total harmonic distortion
Harmonic RMS ÷ fundamental RMS
Voltage sag
Temporary RMS voltage reduction
PQ bus inputs
Specified P and Q
PV bus inputs
Specified P and voltage magnitude
Slack bus inputs
Specified voltage magnitude and angle
Lossless two-bus real power
P₁₂ = V₁V₂·sinδ/XPer-phase or per-unit
Rotor-angle stability
Ability to remain in synchronism

Faults and Transformer Connections

Bolted balanced fault current
I₃φ = E/Z₁
E in fault formulas
Prefault phase voltage or pu
Z₀, Z₁, Z₂
Zero, positive, negative sequence impedances
Bolted line-to-ground fault current
If = 3E/(Z₁+Z₂+Z₀)
Nonzero line-to-ground fault impedance
Add 3Zf to denominator
Bolted line-to-line current
|If| = √3·|E/(Z₁+Z₂)|Faulted line magnitude
Residual current
Ia + Ib + Ic = 3I₀
Delta winding zero sequence
May circulate within winding
Delta line zero sequence
Blocked at delta line terminals
Delta-wye vector groups
Dy1 lags, Dy11 leadsSecondary shift magnitude 30°

50 vs 51

50 instantaneous

  • Current pickup
  • No intentional time delay

51 time overcurrent

  • Current pickup
  • Definite or inverse timing

Match timing to coordination

Protection Picker

  1. Overcurrent without intentional delay→50 element
  2. Overcurrent with timed operation→51 element
  3. Apparent impedance within reach→21 distance element
  4. Current mismatch across zone→87 differential element
  5. Voltage below pickup setting→27 undervoltage element
  6. Compare signals at line terminals→Pilot protection(Communications channel)
  7. Temporary overhead feeder fault→Automatic recloser(Restores service if fault clears)

Relay Numbers and Methods

50
Instantaneous overcurrent
51
Time overcurrent
21
Distance on apparent impedance
27
Undervoltage
87
Differential current balance
Pilot protection
Communications link coordinates line terminals
Differential zone
Bounded by CT locations
Differential restraint
Improves through-fault security

Device Ratings and Coordination

Fuse
Melts to interrupt overcurrent
Circuit breaker
Interrupts current within rated duty
Recloser
Trips and recloses automatically
Continuous current rating
Load current carrying limit
Interrupting rating
Fault current interruption limitAt stated voltage and conditions
Time-current curve
Operating time versus current
Protective coordination
Downstream clears before upstream backup
Fuse coordination curves
Minimum melt and total clearing
Relay pickup
Threshold to start timing/operation

Common Traps

Metering Basis

Raw meter secondary reading ≠ Primary-scaled instrument reading

Ground Test Return Path

Stakeless ground-loop resistance ≠ Isolated electrode resistance

Code Lookup

Exam-specified code edition ≠ Latest published code edition

Three-Phase Magnitudes

Line-to-line voltage ≠ Winding phase voltage

Per-Unit Bases

Equipment nameplate per-unit impedance ≠ System-base per-unit impedance

Fault Current

SLG sequence current I₀ ≠ SLG fault current 3I₀

Breaker Ratings

Continuous load amp rating ≠ Fault interrupting amp rating

Protection Timing

Relay operating time ≠ Total fault clearing time

Last Minute

  1. 1.Use exam-listed standard editions.
  2. 2.Search supplied codes chapter by chapter.
  3. 3.Confirm line versus winding quantities.
  4. 4.Use RMS phasors for complex power.
  5. 5.Match impedance bases before combining.
  6. 6.Use faulted bus base amps.
  7. 7.Trace neutral and zero-sequence paths.
  8. 8.Verify transformer vector group.
  9. 9.Use slip as a fraction.
  10. 10.Check breaker fault interrupting duty.
  11. 11.Compare clearing curves across fault currents.