Cheat sheet

APICS CPIM Cheat Sheet

Supply Chain and Business Strategy

12%of exam

Strategy and Trade-offsMake-to-stockCash-to-cashRisk pooling

Sales and Operations Planning

10%of exam

Demand Management

12%of exam

Internal Supply Sources

12%of exam

External Supply Sources

11%of exam

Inventory Management

14%of exam

Detailed Scheduling and Execution

12%of exam

Distribution Management

8%of exam

Quality, Continuous Improvement, and Technology

9%of exam

Quick Facts

Blueprint
Exam Content Manual 9.0
Effective
June 1, 2026
Format
One multiple-choice exam
Questions
150 total
Score split
130 scored + 20 pretest
Time limit
3 hours 30 minutes
Passing score
300 scaled
Score range
200–350
Delivery
Pearson VUE center or OnVUE

Strategy and Trade-offs

Order qualifier
Minimum acceptable customer criterion
Order winner
Criterion that earns customer choice
Make-to-stock (MTS)
Produce ahead of customer orders
Assemble-to-order (ATO)
Assemble stocked modules after order
Make-to-order (MTO)
Make product after order
Engineer-to-order (ETO)
Design product after order
Process layout
Group similar functions
Product layout
Arrange resources in operation sequence
Cash-to-cash cycle
DIO + DSO − DPOInventory, receivables, payables in days
Risk pooling
Share buffers across demand streams
Triple bottom line
People, planet, profit

Planning Hierarchy

Balance families, schedule items, calculate components.

S&OP balances familiesMPS schedules itemsMRP calculates components

S&OP vs MPS

S&OP

  • Plans product-family volume
  • Balances demand, supply, and finance

MPS

  • Schedules specific master-scheduled items
  • Sets quantities and dates

Family volume → item schedule

Planning Level Picker

  1. Balance product-family demand and supply→S&OP(Cross-functional aggregate plan)
  2. Set end-item build quantities and dates→MPS(Disaggregate production plan)
  3. Check critical resources against MPS→RCCP(Validate master schedule)
  4. Calculate time-phased component needs→MRP(Explode, net, lot-size, offset)
  5. Check detailed work-center loads→CRP(Use routings and order quantities)
  6. Set depot replenishment dates→DRP(Net needs by location)
  7. Schedule customer-specific assembly→Final assembly schedule(Translate orders into configurations)

Aggregate Planning

S&OP
Reconcile family-level demand and supply
Portfolio review
Assess launches, phaseouts, life cycles
Demand review
Agree on unconstrained demand
Supply review
Test capability and propose responses
Reconciliation
Quantify trade-offs and financial implications
Executive S&OP
Resolve escalations and approve plan
Level strategy
Hold output steady across periods
Chase strategy
Adjust output with demand
Resource planning
Check aggregate long-range capacity

Independent vs Dependent Demand

Independent

  • Independent of another item’s demand
  • Forecast or use customer orders

Dependent

  • Driven by parent requirements
  • Calculate from the BOM

Identify the source of demand

Forecast Method Picker

  1. New product, little sales history→Qualitative judgment(Use analogs or expert input)
  2. Stable series, equal recent weights→Simple moving average(Choose a rolling window)
  3. Want a tunable recency response→Exponential smoothing(Higher alpha reacts faster)
  4. Demand follows a measurable driver→Causal forecast(Consider regression)
  5. Recurring peaks by calendar period→Seasonal model(Estimate recurring effects)
  6. Persistent signed errors→Tracking signal(Investigate bias)

Forecasts and Error

Independent demand
Demand independent of other items
Dependent demand
Derived from another item’s requirements
Moving average
Mean of latest n actuals
Weighted moving average
Σ(w×actual) ÷ Σ(w)w means period weight
Exponential smoothing
α × actual + (1−α) × forecastNext forecast from prior period
Higher smoothing α
More weight on latest actual
Error convention
Actual − forecastKeep signs consistent
Mean absolute deviation (MAD)
Mean absolute forecast error
Mean absolute percentage error (MAPE)
Mean absolute percent errorMAPE requires nonzero actuals
Tracking signal
Cumulative signed error ÷ MADRequires nonzero MAD
Positive cumulative error
Underforecasting with actual − forecast
Seasonality
Pattern repeating at fixed intervals

MRP Quantity and Timing

Explode for demand, net and size, offset for timing.

Explode parent releasesNet against available supplySize planned receiptsOffset to release dates

RCCP vs CRP

RCCP

  • Checks master production schedule
  • Focuses on key resources

CRP

  • Checks detailed work-center load
  • Uses routings and order quantities

Match capacity check to plan

Master Scheduling

Master production schedule (MPS)
Item-level build quantities and dates
Planning bill
Group options for mix planning
Demand time fence
Near-term demand driven by orders
Planning time fence
Limits automatic schedule changes
Rough-cut capacity planning (RCCP)
Test MPS against key resources
Available-to-promise (ATP)
Uncommitted inventory and planned supply
Capable-to-promise (CTP)
Promise using material and capacity
Final assembly schedule (FAS)
Schedule specific customer configurations

ATP vs CTP

ATP

  • Uses uncommitted stock and supply
  • Subtracts existing customer commitments

CTP

  • Checks supply and capacity feasibility
  • Tests whether additional supply fits

Ask which constraints govern promises

Material and Capacity Planning

Material requirements planning (MRP)
Time-phase component requirements
Core MRP inputs
MPS, bills, inventory records
Bill of material (BOM)
Components and quantities per parent
BOM explosion
Parent releases generate component demand
Gross-to-net
Subtract available supply from requirements
Scheduled receipt
Open order due to arrive
Planned order receipt
Proposed quantity due in period
Planned order release
Receipt offset earlier by lead time
Pegging
Trace requirements to their sources
Capacity requirements planning (CRP)
Convert orders into work-center loads

Supplier Decision Picker

  1. Compare sourcing and freight costs→Landed cost(Use delivered cost basis)
  2. Compare lifecycle cost across suppliers→Total cost of ownership(Include use and disposal)
  3. Need alternate qualified supply→Dual sourcing(Reduce single-source dependency)
  4. Repeated buys under negotiated terms→Blanket agreement releases(Schedule individual deliveries)

Supplier Selection and Execution

Supplier qualification
Verify capability against requirements
Supplier scorecard
Track quality, delivery, cost
Landed cost
Purchase + inbound freight + dutiesExamples of cost components
Total cost of ownership
Acquisition, use, and disposal costs
Single sourcing
Choose one supplier among alternatives
Sole sourcing
Only one viable supplier
Dual sourcing
Qualify two sources for resilience
Blanket order release
Call off quantities against agreement
Supplier continuity plan
Activate alternatives during disruption

Replenishment Signals

Quantity answers how much. Point answers when.

EOQ sizes the orderROP triggers the order

Continuous vs Periodic Review

Continuous review

  • Monitor inventory position continuously
  • Threshold triggers replenishment

Periodic review

  • Inspect position on fixed dates
  • Replenish up to target level

Trigger by stock or calendar

Replenishment Policy Picker

  1. Monitor position after each transaction→Continuous review(Trigger at reorder point)
  2. Review stock at fixed intervals→Periodic order-up-to(Cover review interval plus lead time)
  3. Balance ordering and holding costs→EOQ(Basic steady-demand assumptions)
  4. Need exact net requirements per period→Lot-for-lot(Avoid planned cycle carryover)
  5. Protect against uncertain lead-time demand→Safety stock(Specify service target and variability)
  6. Focus counts on high-value items→ABC-based cycle counting(Prioritize A items)

Inventory Formulas

Economic order quantity (EOQ)
√(2DS/H)Basic constant-demand model
D
Annual unit demandEOQ input
S
Cost per orderEOQ input
H
Annual holding cost per unitEOQ input
Reorder point (ROP)
Lead-time demand + safety stock
Safety stock, fixed lead time
z × σₗₜNormal lead-time demand model
z
Normal quantile for cycle service
σₗₜ
Lead-time demand standard deviation
Inventory position
On hand + on order − backorders
Average cycle stock
Order quantity ÷ 2Steady demand, full lot receipt
Average inventory
Cycle stock + safety stockBasic steady-demand model
Annual inventory turns
Annual COGS ÷ average inventory costCOGS means cost of goods sold
Days of supply
On-hand units ÷ average daily demandSame item and units

Cycle Service vs Unit Fill

Cycle service

  • Probability of no cycle stockout
  • Event measured by cycle

Unit fill

  • Fraction of demand units filled
  • Counts units supplied from stock

Check event versus unit denominator

Inventory Policies and Control

Cycle stock
Inventory from ordering in batches
Safety stock
Buffer against demand or supply variation
Anticipation stock
Build ahead of expected peaks
Decoupling stock
Buffer between process stages
Pipeline inventory
Stock in transit
Lot-for-lot (L4L)
Match each period’s net requirement
Period order quantity (POQ)
Cover fixed number of periods
ABC classification
Rank by annual usage value
Cycle counting
Count selected items on rotation
Cycle service level
Probability of no cycle stockout
Unit fill rate
Share of units supplied immediately
Consignment
Supplier owns until use or sale

Finite vs Infinite Loading

Finite

  • Allocate against available capacity
  • Shift work when slots fill

Infinite

  • Load regardless of capacity
  • Expose overload for planner action

Capacity cap changes feasible dates

Scheduling Decision Picker

  1. Find earliest feasible completion→Forward finite scheduling(Start from available date)
  2. Find latest feasible starting date→Backward finite scheduling(Anchor on due date)
  3. Expose overloaded work centers→Infinite loading(Compare loads with available capacity)
  4. Prioritize by due date alone→Earliest due date(Ignore job duration)
  5. Prioritize by remaining time pressure→Lowest critical ratio(Recompute as time advances)

Dispatching and Shop-Floor Control

Production activity control (PAC)
Release, dispatch, track, adjust orders
Finite loading
Respect work-center capacity limits
Infinite loading
Load without capacity constraints
Forward scheduling
Start earliest, calculate finish
Backward scheduling
Start from due date
Earliest due date (EDD)
Dispatch earliest due job first
Shortest processing time (SPT)
Dispatch quickest job first
Critical ratio (CR)
Time-to-due ÷ remaining processing timeUse matching time units
CR below 1
Insufficient time at current plan
Transfer batch
Quantity moved to next operation
Backflushing
Record material use from completions

MRP vs DRP

MRP

  • Plans component supply
  • Explodes product structure via BOM

DRP

  • Plans location replenishment
  • Rolls needs through distribution network

Product structure versus stocking network

Distribution and Order Flow

Distribution requirements planning (DRP)
Time-phase replenishment by location
Bill of distribution
Maps supply paths between locations
DRP planned release
Triggers requirement at supplying location
Centralized stock
Consolidate stock across demand streams
Decentralized stock
Place inventory closer to customers
Cross-docking
Transfer freight with minimal storage
Third-party logistics (3PL)
Outsource logistics activities
Order backlog
All open customer orders
Backorder
Unfilled order past due

PDCA Cycle

Plan the change, test, check, then act.

Plan the experimentDo on small scaleCheck the measured outcomeAct on the findings

Control vs Specification Limits

Control limits

  • Calculated from process behavior
  • Flag potential special causes

Specification limits

  • Set by design or customer
  • Define acceptable product output

Separate stability from output conformance

Quality Tool Picker

  1. Identify largest defect contributors→Pareto chart(Rank categories before investigating)
  2. Organize suspected failure causes→Fishbone diagram(Confirm causes with evidence)
  3. Distinguish signals from routine variation→Control chart(Plot in time order)
  4. Evaluate fit to engineering tolerances→Process capability analysis(Confirm stability first)
  5. Test and refine process changes→PDCA(Repeat with measured results)

Quality Tools

Pareto chart
Rank categories by contribution
Fishbone diagram
Organize possible root causes
Five whys
Probe successive causes
Check sheet
Tally observations consistently
Histogram
Show frequency across value intervals
Scatter diagram
Inspect association between two variables
Control chart
Detect signals of special-cause variation
Process capability
Compare stable process with specifications
Prevention cost
Spend to avoid defects
Appraisal cost
Spend to inspect or test
Failure cost
Scrap, rework, returns, warranty claims

Lean and Technology

Kanban
Signal authorized production or movement
Heijunka
Level production volume and mix
Takt time
Available production time ÷ customer demandUse the same time period
Kaizen
Continuous incremental improvement
Single-minute exchange of die (SMED)
Reduce changeover time
Poka-yoke
Prevent or detect mistakes early
Theory of constraints
Improve throughput at the constraint
Overall equipment effectiveness (OEE)
Availability × performance × quality
Enterprise resource planning (ERP)
Integrate processes and shared data
Master data integrity
Keep planning parameters accurate
Robotic process automation
Automate repetitive rule-based workflows

Common Traps

Scaled Scoring

300 scaled passing score ≠ Raw percent correct

Forecast Direction

Positive actual-minus-forecast error ≠ Overforecasting

MRP Dates

Planned receipt date ≠ Planned release date

Promise Versus Projection

ATP uncommitted supply ≠ Projected available inventory balance

Reorder Trigger

Inventory position ≠ On-hand stock alone

Capacity Checks

Work-center capacity ≠ Component availability

Production Pace

Takt time from customer demand ≠ Observed production cycle time

Order Status

Backlog of open orders ≠ Backorders already past due

Last Minute

  1. 1.Budget 84 seconds per question
  2. 2.Answer all 150 questions
  3. 3.Balance S&OP by product family
  4. 4.Check forecast error sign convention
  5. 5.Validate MPS with rough-cut capacity
  6. 6.Explode components from parent releases
  7. 7.Offset releases by lead time
  8. 8.Match demand and lead-time units
  9. 9.Compute reorder point with safety stock
  10. 10.Check inventory position before ordering
  11. 11.Roll DRP releases upstream
  12. 12.Check process stability before capability
Same family resources

Explore More ASCM Supply Chain Certifications

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.