Pipeline Inspection and Management
Not publishedof exam
Front-End Construction
Not publishedof exam
Installation Construction
Not publishedof exam
Back-End Construction
Not publishedof exam
Post-Construction
Not publishedof exam
Quick Facts
- Exam
- API 1169
- Scope
- New onshore pipeline construction
- Time
- 3 hours
- Format
- Multiple choice
- Questions
- 115 total, 100 scored
- Pretest
- 15 unscored questions
- Passing score
- 400 on 200–500 scale
- Delivery
- In-person computer exam
- Personal references
- Prohibited
- Onscreen references
- Selected government excerpts
- Effectivity window
- Dec 2026 – Aug 2027
OSHA Part Numbers
1910 industry, 1926 construction
Onscreen vs Study References
Onscreen excerpts
- Government documents
- Listed on effectivity page two
Study publications
- API standards and other publications
- Unavailable inside the test viewer
Check which references are provided
Exam Reference Picker
- Need tested editions→Use the effectivity sheet(Match your exam window)
- Need tested topic areas→Use the Body of Knowledge(Five main categories)
- Question specifies OSHA→Use the OSHA excerpt(Match the cited topic)
- Choosing a welding study reference→API 1104 or CSA Z662:23(Exam tests overlapping content)
- U.S. gas pipeline construction→Use 49 CFR 192(Construction in Subpart G)
- U.S. hazardous liquid construction→Use 49 CFR 195(Construction in Subpart D)
- Need U.S. wetland procedures→Find the FERC PDF(May 2013 exam reference)
- Need to navigate test PDFs→Practice with API tutorial(Ctrl+F unavailable)
Study Publications
- API RP 1169
- Construction inspection2nd edition
- API RP 1110
- Steel pipeline pressure testing7th edition, appendices excluded
- API Spec Q1
- Quality management systems10th edition, §§ 3–5
- API Spec Q1 updates
- Addenda 1–2 and Errata 1–3
- CGA Best Practices
- Underground damage preventionCurrent edition
- INGAA CS-S-9
- Pressure test safetyDecember 2018
- API Std 1104
- Welding, inspection and acceptance22nd edition, §§ 3–11
- API Std 1104 update
- Errata 1September 2023
- CSA Z662:23
- Canadian pipeline systems standardChs. 1, 2, 4, 6–10
Shoring vs Shielding
Shoring
- Supports excavation sides
- Designed to prevent cave-ins
Shielding
- Withstands cave-in forces
- Protects workers inside
Support walls vs protect occupants
Exam Screen References
- 49 CFR 192
- U.S. gas pipeline safety
- 49 CFR 195
- U.S. hazardous liquid pipeline safety
- 29 CFR 1910
- OSHA general industry standards
- 29 CFR 1926
- OSHA construction standards
- FERC May 2013 Procedures
- Wetland and waterbody mitigation
- 50 CFR 21
- U.S. migratory bird permits
- Canada OHS Regulations
- Federal occupational safetySOR 86-304
- Migratory Birds Convention Act
- Canadian migratory bird protection1994
- PDF viewer
- Ctrl+F unavailable
Quality Records
- Inspector role
- Observe, verify, document, report
- Controlled drawing
- Verify current approved revision
- Daily inspection report
- Record observations and test results
- Material traceability
- Link markings to material records
- Nonconformance report
- Document unmet requirement and disposition
- Calibration record
- Verify instrument calibration status
- Qualification records
- Verify credentials for assigned work
Site Safety
- OSHA competent person
- Identifies hazards, authorized to act
- OSHA trench egress
- ≥4 ft deep, ≤25 ft laterally29 CFR 1926.651(c)(2)
- OSHA cave-in protection
- Protective system unless exception applies29 CFR 1926.652
- Stable rock exception
- Excavation entirely in stable rock
- Under 5 ft exception
- Competent person finds no cave-in risk
- Shoring
- Supports excavation walls
- Shielding
- Protects workers inside the shield
- After rainstorm
- Competent person reinspectsWhen employee exposure is anticipated
- Pressure test exclusion zone
- Control access during pressurization
Route and Work Limits
Stake the route, mark utilities
Survey Stakes vs Utility Marks
Survey stakes
- Mark proposed route
- Show construction limits
Utility marks
- Mark estimated existing location
- Verify exact location near excavation
Proposed alignment vs existing facilities
Before Ground Disturbance
- Clearing limits unclear→Check approved alignment sheets(Include temporary workspace)
- Parcel restrictions unclear→Check the line list(Verify landowner commitments)
- Existing utility nearby→Safely verify exact location(Before digging near it)
- Crossing conditions unclear→Check crossing permit or agreement(Confirm method and limits)
- Runoff control needed→Check SWPPP and selected BMPs(Verify controls in place)
Alignment and Access
- Right of way (ROW)
- Corridor for pipeline work
- Alignment sheet
- Route, stationing and special conditions
- Survey stakes
- Mark designed location and limits
- PI
- Point of intersection
- Line list
- Parcel-specific requirements and commitments
- Utility locate marks
- Indicate estimated facility location
- Crossing permit
- Work conditions at regulated crossings
- Topsoil segregation
- Save topsoil separately for restoration
Environmental Controls
- SWPPP
- Stormwater pollution prevention plan
- BMP
- Best management practice
- Silt fence
- Intercept sediment in runoff
- Topsoil stockpile
- Keep separate where required
- Wetland work limits
- Check approved workspace and conditions
- Spill response
- Follow containment and reporting plan
Weld Paperwork
Procedure, proof, person
WPS vs PQR
WPS
- Tells welders how to weld
- Specifies production variables
PQR
- Records qualification test variables
- Records qualification test results
Instructions vs qualification evidence
Installation Inspection Checks
- Pipe joint at wrong station→Check tally against alignment(Verify grade and wall thickness)
- Pipe identity cannot be traced→Flag and segregate the joint(Follow project disposition process)
- Production welding about to start→Check WPS and welder qualifications(Verify applicable ranges)
- Weld indication reported→Apply governing acceptance criteria(Document disposition by weld ID)
- Holiday found before lowering→Verify repair and retest(Follow coating procedure)
- Tie-in spool cut→Verify transferred material identifiers(Update tie-in tally)
Stringing and Bending
- Stringing
- Lay joints along route
- Pipe tally
- Track joint identifiers and placement
- Heat number
- Links pipe to steel heat
- Pipe number
- Identifies the individual joint
- Material check
- Match grade, wall, coating
- Ovality
- Departure from circular cross-section
- Bend acceptance
- Check wrinkles, ovality, coating damage
- Bend record
- Record angle and installed location
Weld NDE vs Holiday Testing
Weld NDE
- Examines weld soundness
- RT or UT are examples
Holiday testing
- Checks coating continuity
- Uses electrical detector
Weld quality vs coating continuity
Weld Inspection
- WPS
- Welding procedure specification
- PQR
- Procedure qualification record
- Welder qualification
- Documents personnel qualification range
- Fit-up
- Check root gap and alignment
- Preheat
- Check before welding begins
- Interpass temperature
- Check between weld passes
- NDE or NDT
- Nondestructive examination or testing
- RT
- Radiographic testing
- UT
- Ultrasonic testing
- Repair record
- Trace repair and follow-up examination
Crossings and Trenching
- Crossing agreement
- Owner conditions and method constraints
- Ditch profile
- Check depth, width and support
- Underground clearance
- Separation from adjacent structures
- Depth of cover
- Distance from pipe top to surface
- Cased crossing
- Carrier pipe within protective casing
- HDD
- Horizontal directional drilling
- HDD inspection
- Track drill path and fluids
Coating and Lowering
- Field joint coating
- Protects exposed girth weld area
- Surface preparation
- Check cleanliness and profile
- Dry film thickness
- Measure thickness of dry coating
- Holiday
- Discontinuity in protective coating
- Jeeping
- Electrical check for coating holidays
- Padding
- Protect pipe from coarse material
- Lowering-in
- Check lift plan and pipe support
- Tie-in
- Connects adjoining pipe sections
- Tie-in tally
- Record pipe ID and cut length
Pressure Test Records
Section, instrument, chart
Coating vs Cathodic Protection
External coating
- Physical corrosion barrier
- Check damage and holidays
Cathodic protection
- Uses protective current
- Verify anodes and test leads
Barrier and electrochemical protection
Back-End Verification
- CP leads installed→Verify and record connections(Match approved CP drawings)
- Actual route differs from drawing→Capture survey and redline(Record actual conditions)
- Hydrotest about to start→Check instruments and exclusion zone(Follow approved test plan)
- Pressure drops during hold→Flag and record the change(Evaluate under test procedure)
- Bore restriction suspected→Check gauging results(Review plate condition)
Burial and Restoration
- Selected backfill
- Protect pipe and coating
- Compaction
- Verify project density requirements
- Backfill crown
- Allowance for settlement where specified
- Buoyancy control
- Check weight placement and spacing
- Topsoil replacement
- Restore segregated surface soil
- Bank stabilization
- Protect restored waterbody banks
- Revegetation
- Restore cover per project requirements
- Landowner restoration
- Check fences and parcel commitments
Hydrotest vs Gauging
Hydrotest
- Pressurized water
- Checks strength and leakage
Gauging
- Pig with gauge plate
- Checks for internal restrictions
Pressure integrity vs bore clearance
Cathodic Protection and As-Builts
- Cathodic protection (CP)
- Electrochemical corrosion control
- Anode bed
- Supplies protective current
- Test lead
- Provides electrical measurement access
- CP installation record
- Track anodes, leads and connections
- Redline
- Mark field changes on drawings
- As-built survey
- Records actual installed location
- As-built weld map
- Links weld IDs and locations
Hydrotest and Pigging
- Hydrostatic test
- Pressure test using water
- Test limits
- Verify test section boundaries
- Pressure chart
- Records pressure over time
- Test instruments
- Verify calibration before testing
- Intake and discharge
- Check applicable permits and conditions
- Cleaning pig
- Removes internal debris
- Gauge plate
- Screens for bore restrictions
- Dewatering pig
- Displaces residual bulk water
- Drying
- Meet specified moisture criterion
Closeout Evidence
Close, reconcile, hand off
Punch List vs As-Built
Punch list
- Outstanding deficiencies
- Tracks closure or disposition
As-built
- Actual installed configuration
- Captures field deviations
Work remaining vs installed condition
Turnover Checks
- Parcel restoration item open→Check line list closeout(Verify completion evidence)
- Deficiency found on walkthrough→Log it on punch list(Track disposition)
- Weld record missing at turnover→Reconcile weld map and reports(Resolve record gap)
- Accepted segment ready for handoff→Transfer records to operations(Follow project acceptance process)
Closeout Records
- Line list closeout
- Verify parcel commitments were resolved
- Final walkthrough
- Identify remaining deficiencies
- Punch list
- Track unresolved work and disposition
- Final inspection reports
- Document completed verification
- Turnover package
- As-builts, tests, inspection records
- Operations handoff
- Transfer accepted segment and records
Common Traps
Scaled scoring
400 scaled ≠ Fixed raw percent correct
Welding alternatives
Either welding study reference ≠ Both welding study references required
Trench entry
4 ft egress trigger ≠ Cave-in protection rule
Traceability
Heat number ≠ Individual pipe number
Stormwater
SWPPP planning document ≠ BMP field control
Burial geometry
Depth of cover ≠ Total trench depth
Closeout
Passed pressure test ≠ Complete turnover package
Last Minute
- 1.Match effectivity to exam window
- 2.400 is a scaled score
- 3.Use OSHA for OSHA questions
- 4.Verify utility location before digging
- 5.Trace each joint to material records
- 6.Check procedure and welder qualifications
- 7.Verify coating repairs before burial
- 8.Map welds and cathodic protection
- 9.Record hydrotest pressure over time
- 10.Resolve and document punch items
Third-party resources · We may earn a commission from purchases.

API 1169 EXAM Study Guide: In-depth review with 700+ Questions, Mock exams, 3 Practice tests, Detailed explanations and test-taking strategies for the Pipeline Construction Inspector Examination
By Fischer, Roderick W.
$35.80 · Buy on Amazon