5.2 High-Wind Underlayment Rules (IBC Table 1507.1.1) & Sealed Roof Deck Options (Taped Seams, Two Layers, Full Self-Adhered)
Key Takeaways
Where the basic wind speed is 140 mph or more, asphalt-shingle underlayment must be ASTM D226 Type II, ASTM D4869 Type IV, or ASTM D6757, with all laps at least 4 inches (IBC Table 1507.1.1).
High-wind underlayment attachment is a grid at 12 inches between side laps and 6 inches at side and end laps, using cap nails or cap staples with caps at least 1 inch in diameter.
Ring-shank cap nails need a shank of at least 0.083 inch, smooth-shank cap nails at least 0.091 inch, and cap staples at least 21 gauge (IBC Table 1507.1.1(3)).
IBC 1507.1.1 alternatives: 4-inch ASTM D1970 strips over all deck joints with a normal underlayment on top, or two layers of D226 Type II or D4869 Type IV felt lapped 19 inches.
FORTIFIED Roof requires a sealed roof deck: taped seams under underlayment, two layers of underlayment, or a full self-adhered ASTM D1970 membrane.
Why the Deck Needs a Second Line of Defense
Shingles, tiles, and metal panels shed water. They do not seal it out. In a hurricane, the first failures are often at the edges: a few shingles or a strip of underlayment peel off. Once the covering is gone, wind-driven rain pours through the joints between sheathing panels into the attic. Insulation, ceilings, and contents can be ruined even though the framing survives.
Two sets of rules deal with this:
- The code, 2021 IBC Section 1507.1.1 and its three tables, which tightens underlayment where the basic wind speed is 140 mph or more.
- FORTIFIED Roof from IBHS, which requires a sealed roof deck on every FORTIFIED roof regardless of wind speed.
Know which rule you are quoting. The PSI exam tests the IBC, and FORTIFIED is a voluntary program (Section 5.3).
The IBC Underlayment Tables
IBC 1507.1.1 makes underlayment follow three tables. For asphalt shingles:
| Table | Basic wind speed below 140 mph | Basic wind speed 140 mph or more |
|---|---|---|
| 1507.1.1(1) Types | ASTM D226 Type I or II; ASTM D4869 Type I, II, III, or IV; ASTM D6757 | ASTM D226 Type II; ASTM D4869 Type IV; ASTM D6757 |
| 1507.1.1(2) Application | 2:12 up to 4:12: two layers (19-inch starter strip, then 36-inch sheets lapped 19 inches, end laps 4 inches offset 6 feet). 4:12 and steeper: one layer, lapped 2 inches, end laps 4 inches offset 6 feet | Same, except all laps at least 4 inches |
| 1507.1.1(3) Attachment | "Fastened sufficiently to hold in place" | Grid pattern: 12 inches between side laps, 6 inches at side and end laps, with cap nails or cap staples |
The high-wind attachment details in Table 1507.1.1(3):
- Caps at least 1 inch nominal diameter. Metal caps at least 32-gauge (0.0134 inch); power-driven metal caps at least 0.010 inch; plastic caps at least 0.035 inch thick at the outside edge.
- Cap nail shank at least 0.083 inch for ring-shank or 0.091 inch for smooth-shank nails.
- Cap staples at least 21 gauge.
- Long enough to penetrate through the sheathing, or at least 3/4 inch into it.
Two points trip people up. First, cap staples meeting these specs are allowed. Second, smooth-shank cap nails are allowed if the shank is at least 0.091 inch. It is bare staples and uncapped fasteners that don't meet the high-wind table.
Tile, metal, slate, wood, and the other coverings have their own rows in the same tables. Tile, for example, uses ASTM D226 Type II, ASTM D2626 Type I, or D6380 Class M roll roofing.
The Two IBC Alternatives
IBC 1507.1.1 lists two exceptions that may be used instead of the table requirements:
Exception 1: Taped deck joints. Apply a strip of self-adhering polymer-modified bitumen membrane (ASTM D1970) at least 4 inches wide over all joints in the roof deck, installed per the membrane manufacturer's instructions for that deck material. Then apply an underlayment that would be approved for the covering at wind speeds below 120 mph. Taping the joints is what the industry calls a sealed roof deck.
Exception 2: Two layers of heavy felt. Use two layers of ASTM D226 Type II or ASTM D4869 Type IV:
- a 19-inch strip along the eave, then 36-inch-wide sheets overlapping successive sheets 19 inches;
- end laps 4 inches, offset 6 feet;
- a fastening grid of 12 inches between side laps and 6 inches at side and end laps;
- cap nails with caps at least 1 inch and the same shank rules as above.
The 19-inch overlap on a 36-inch sheet leaves a 17-inch exposure, so every point on the deck has two plies.
FORTIFIED Roof's Sealed Roof Deck
FORTIFIED requires the deck to be sealed on every designated roof. Its checklists and standard details offer three routes:
- Tape plus underlayment: 4-inch nominal ASTM D1970 tape, or 3-3/4-inch AAMA 711 Level 3 tape, over all deck seams. Then a D226 Type II or D4869 Type III or IV felt, or an equivalent synthetic with an evaluation report, fastened in a close grid of cap nails.
- Two layers of underlayment, felt or approved synthetic, installed with half-lap coverage and the program's close cap-nail grid.
- Full self-adhered membrane: ASTM D1970 over the entire deck. FORTIFIED recommends a bond-break layer, such as #15 felt, between the membrane and shingles.
FORTIFIED's standard details set the exact lap widths and fastener spacing for each roll width and product. Follow the current detail sheet for the product you use.
Material Notes
- ASTM D1970 covers self-adhering polymer-modified bitumen sheets. It sets a minimum thickness of 40 mils and tests the sheet's ability to seal around nails. For hot locations, such as under dark metal or tile, use a product rated for high temperatures by its manufacturer.
- Synthetic underlayments are tested to ASTM D8257 and accepted through evaluation reports. The 2021 IBC tables list D226, D4869, and D6757 by name, so a synthetic used where a listed type is required needs an evaluation report showing equivalence. FORTIFIED requires one showing equivalence to D226 Type II and passing the D4869 shower test.
- Prep: tape and self-adhered membranes need a clean, dry deck. Prime where the manufacturer requires, such as some OSB or cold conditions, and roll the tape down firmly.
Attic Moisture Caution With Full Self-Adhered Membranes
A full layer of self-adhered membrane is a strong water barrier and also a vapor retarder on the outside of the deck. In a hot, humid climate, moisture that reaches the attic must leave through ventilation, because it can no longer dry outward through the deck. Manufacturers and FORTIFIED stress adequate attic ventilation with full-coverage membranes (Section 9.4). An unvented conditioned attic designed under IRC R806.5, with insulation at the roof deck, is the other accepted approach.
Choosing an Approach
| Approach | Where it comes from | Pros | Watch-outs |
|---|---|---|---|
| High-wind table (heavy underlayment, 4-in. laps, grid) | IBC Table 1507.1.1 | Straightforward; uses common products | Joints in the deck are not sealed |
| Taped joints plus normal underlayment | IBC exception 1; FORTIFIED | Seals deck joints; economical | Needs clean, dry deck; tape must be rolled |
| Two layers of heavy felt | IBC exception 2; FORTIFIED | No adhesives; works in cool or damp weather | Heavier; more fasteners; more labor |
| Full self-adhered membrane | FORTIFIED; manufacturer systems | Best water barrier; seals around nails | Cost; vapor retarder, so ventilation matters |
A house sits where the basic wind speed is 150 mph, and the contractor will use a single layer of underlayment under asphalt shingles following the IBC table path. Which requirement applies?
Any ASTM D226 Type I felt fastened with bare staples at 18 inches.
D226 Type II, D4869 Type IV, or D6757 underlayment with all laps at least 4 inches, attached in a 12-inch grid with 6-inch spacing at laps using cap nails or cap staples.
No underlayment is required if the shingles are rated ASTM D7158 Class H.
Underlayment must be fully adhered ASTM D1970 over the entire deck.
Which option is listed in IBC 1507.1.1 as an alternative to the standard high-wind underlayment requirements?
Two layers of #15 felt stapled with bare staples.
A single layer of synthetic underlayment with no fasteners.
Minimum 4-inch strips of ASTM D1970 self-adhering membrane over all deck joints, covered by an underlayment approved for wind speeds below 120 mph.
Spray foam applied to the underside of the deck.
Why should attic ventilation be verified when a full layer of ASTM D1970 self-adhered membrane is installed over the entire roof deck of a Louisiana house?
The membrane acts as a vapor retarder on the outside of the deck, so moisture in the attic cannot dry outward and must be removed by ventilation, unless the attic is designed as unvented.
The membrane expands in summer and bows the rafters downward.
Self-adhered membranes dissolve asphalt shingles when attic humidity is above 60 percent.
Code prohibits shingles over self-adhered membranes unless the attic has powered fans.
Sections you finish are checked off in the contents.