12.1 Time, Work & Pipes and Cisterns

Key Takeaways

  • Use a total of one job or an integer common multiple of the individual completion times.

  • Split the timeline whenever a participant starts or stops. Use only the active rates in each interval.

  • For alternating shifts, count complete cycles and calculate the remaining fraction of the final shift.

  • Use an output-based payment split when the problem states that agreement.

  • A tank fills only if the signed net rate is positive over the filling interval.

Last updated: November 2026

12.1 Time, Work & Pipes and Cisterns

For a constant work rate, output equals rate multiplied by time. Use rates in the same unit and add them when the workers’ outputs are independent and additive:

Total Work=Rate (Efficiency)×Time\text{Total Work} = \text{Rate (Efficiency)} \times \text{Time}

Reciprocal-Rate vs. LCM Total-Work Method

Two equivalent frameworks solve time-and-work problems:

  1. Reciprocal-Rate Method: Set total work to 11 job. If A finishes in aa days, A's one-day work is 1a\frac{1}{a}. Together, A and B complete 1a+1b\frac{1}{a} + \frac{1}{b} per day, finishing in aba+b\frac{ab}{a + b} days.
  2. LCM Total-Work Method: When the completion times are positive whole numbers in the same time unit, set Total Work W=LCM(a,b,… )W = \text{LCM}(a, b, \dots) in work units. Daily rates become exact integers in units/day, preventing fraction errors.
MethodTotal Work WWRate of A (12 days)Rate of B (18 days)Combined Rate
Reciprocal-Rate11 job112\frac{1}{12} job/day118\frac{1}{18} job/day536\frac{5}{36} job/day
LCM Total-Work3636 units33 units/day22 units/day55 units/day

Worked Example 1: Anita paints a room in 1212 days and Bharat in 1818 days. Working together, take W=LCM(12,18)=36W = \text{LCM}(12, 18) = 36 units. Their rates are 33 and 22 units/day (sum 55 units/day), so they finish in 365=715\frac{36}{5} = 7\frac{1}{5} days.


Leaving Midway: Forward vs. Backward-Addition Trick

  • Leaves kk days after start (Forward Subtraction): Subtract k×(combined rate)k \times (\text{combined rate}) from WW, then divide the remainder by the remaining worker’s rate. First check that the job is still unfinished when the worker leaves.
  • Leaves kk days before completion (Backward-Addition Trick): Pretend the departing worker stayed for those final kk days. Add k×(departing worker’s rate)k \times (\text{departing worker’s rate}) to WW, then divide by the combined rate of everyone. This gives the total time. Verify that it exceeds kk when both workers are stated to have started.

Worked Example 2: A (1515 days) and B (2020 days) start together, and A leaves 55 days before completion. Take W=LCM(15,20)=60W = \text{LCM}(15, 20) = 60 units, giving rates A =4= 4 and B =3= 3 units/day. Adding A's missing 55 days contributes 5×4=205 \times 4 = 20 units. Total time =60+204+3=807=1137= \frac{60 + 20}{4 + 3} = \frac{80}{7} = 11\frac{3}{7} days.


Alternate-Day Work Cycles

When workers take turns on alternate days, treat one full rotation as a cycle. Multiply whole cycles until just under WW, then finish the remaining work day by day in turn order. For leftover work, use the rate of the worker on the current shift. The cycle’s average rate describes complete cycles.

Worked Example 3: A (99 days) and B (1212 days) work alternate days starting with A. With W=36W = 36 units, A =4= 4 and B =3= 3 units/day, so each 22-day cycle completes 77 units. Five full cycles (1010 days) complete 3535 units, leaving 11 unit. On Day 11, A's turn needs 14\frac{1}{4} day, giving 101410\frac{1}{4} days total.


Efficiency Ratios and Wage Distribution

Efficiency is work per unit time. For a fixed job, time is inversely proportional to efficiency:

Time∝1Efficiency  ⟹  T1T2=E2E1\text{Time} \propto \frac{1}{\text{Efficiency}} \implies \frac{T_1}{T_2} = \frac{E_2}{E_1}

For instance, if Worker X is 25%25\% more efficient than Worker Y (EX:EY=5:4E_X : E_Y = 5 : 4), then X needs only 45\frac{4}{5} of Y's time (TX:TY=4:5T_X : T_Y = 4 : 5). If Y finishes a task in 2525 days, X finishes it in 45×25=20\frac{4}{5} \times 25 = 20 days.

If a problem says pay is shared in proportion to work done, multiply each worker’s rate by their own time before forming the ratio. When everyone works for the same duration, the output ratio is just the daily rate ratio. If one worker works 33 days at 44 units/day (1212 units) and another works 66 days at 33 units/day (1818 units), they split the pay in the ratio 12:18=2:312 : 18 = 2 : 3.

Worked Example 4: A (1010 days) and B (1515 days) take a ₹4,200 contract and, working with C throughout, finish in 44 days. They agree to share the contract fee by work done. With W=60W = 60 units, rates are A =6= 6, B =4= 4, and (A+B+C)=15(A + B + C) = 15, so C =5= 5 units/day. Since all worked 44 days, shares follow 6:4:56 : 4 : 5, giving C 515×4200=\frac{5}{15} \times 4200 = ₹1,400.


Chain Rule (Man-Days) & AND/OR Equivalence

When workers MM, days DD, daily hours HH, efficiency EE, and work WW change across scenarios, use:

M1×D1×H1×E1W1=M2×D2×H2×E2W2\frac{M_1 \times D_1 \times H_1 \times E_1}{W_1} = \frac{M_2 \times D_2 \times H_2 \times E_2}{W_2}

For interchangeable workers, headcount times hours gives worker-hours. Multiplying by output per worker-hour gives total output. For groups with different rates, add the groups’ outputs separately.

  • Either team can complete the job. Four type-A pumps or eight type-B pumps drain the same basin in 15 hours. If the output of one pump is aa or bb, then 4a=8b4a=8b, so a=2ba=2b. Six type-A pumps and four type-B pumps have rate 16b16b, and the job takes 8(15)/16=7.58(15)/16=7.5 hours.
  • Both types work together. Four type-A pumps and six type-B pumps together take eight hours, while three type-A pumps and seven type-B pumps take ten hours for the same job. Equate 8(4a+6b)=10(3a+7b)8(4a+6b)=10(3a+7b). This gives 32a+48b=30a+70b32a+48b=30a+70b, or a=11ba=11b. NCERT, direct and inverse proportions

Pipes and Cisterns

Inlet pipes carry positive rates (filling), while outlet pipes and leaks carry negative rates (emptying). These problems model each rate as constant. If the combined rate from an empty tank is zero or negative, the tank does not fill under that model. If an inlet fills a tank in TfillT_{\text{fill}} hours and with a leak takes TcombinedT_{\text{combined}} hours, the leak's solo emptying rate is:

1Tleak=1Tfill−1Tcombined\frac{1}{T_{\text{leak}}} = \frac{1}{T_{\text{fill}}} - \frac{1}{T_{\text{combined}}}

Worked Example 5: An inlet fills a tank in 1010 hours, but a leak extends filling to 1212 hours. With capacity W=LCM(10,12)=60W = \text{LCM}(10, 12) = 60 units, the inlet rate is +6+6 units/hour and net rate is +5+5 units/hour, so the leak empties 6−5=16 - 5 = 1 unit/hour and empties a full tank in 601=60\frac{60}{1} = 60 hours.

Test Your Knowledge

A can complete a piece of work in 12 days and B can complete the same work in 15 days. They start working together, and after 4 days A leaves. How many more days will B take to finish the remaining work?

A

5 days

B

6 days

C

7.5 days

D

8 days

Test Your Knowledge

Eighteen workers working 6 hours a day build a 120-metre wall in 15 days. At the same output per worker-hour, how many workers working 9 hours a day are needed for a 180-metre wall of the same design in 10 days?

A

22 workers

B

24 workers

C

27 workers

D

30 workers

Test Your Knowledge

Pipe P can fill a cistern in 15 hours and Pipe Q can fill it in 20 hours, while an outlet Pipe R can empty the full cistern in 12 hours. If all three pipes are opened together, how long will it take to fill the empty cistern?

A

30 hours

B

24 hours

C

40 hours

D

60 hours