3.4 Natural Hazards & Disaster Management
Key Takeaways
Disaster risk depends on the hazard, who or what is exposed, how vulnerable they are and the capacity to cope.
Mitigation reduces potential harm, preparedness builds the ability to act, response addresses immediate needs, and recovery restores and improves services.
The Disaster Management Act assigns distinct roles to national, state and district authorities and provides for specialist response.
The current BIS seismic zoning map comes from IS 1893 (Part 1):2016. Uttarakhand includes areas in zones IV and V.
Start with a hillside settlement separated from its school by a river. Heavy rain, a failing slope and sudden flooding describe different physical processes. Where the buildings stand and whether there is another way to reach them help determine how seriously the event disrupts the community.
Hazard, Exposure and Vulnerability
A hazard is a process or event with the potential to cause harm. Exposure describes the people, buildings, roads or services in places where the hazard can occur. Vulnerability describes the conditions that make exposed people and assets susceptible to damage. Capacity includes the skills, organizations and resources available to manage risk. A disaster seriously disrupts a community when hazardous events interact with these conditions. UNDRR, disaster risk terminology
Consider two schools exposed to the same degree of earthquake shaking. One has a building designed for that hazard and regularly practises how to respond. The other has vulnerable masonry and no practiced communication plan. Exposure to shaking can be similar while vulnerability and capacity differ. A risk assessment can therefore compare building conditions and emergency access as well as the hazard shown on a map.
Identify the Physical Process
| Hazard | Clue in a description |
|---|---|
| Earthquake | Sudden fault rupture causes shaking. The shaking can trigger secondary impacts such as slope failure. |
| Landslide | Rock, earth or debris moves downhill. Intense rain or shaking may trigger a failure on susceptible terrain. |
| Cloudburst and flash flood | Exceptionally intense rain over a small area can cause water levels to rise rapidly, especially where runoff concentrates in narrow valleys. A cloudburst describes the rain and a flash flood describes the rapid flow or rise in water. |
| Glacial lake outburst flood (GLOF) | Water drains suddenly from a glacial lake and surges downstream. A breach of the natural dam is one possible cause. |
| River flood | River water spreads beyond its ordinary channel. Prolonged rainfall over an upstream catchment can raise levels downstream even if local rainfall is light. |
In one storm, rain may saturate a slope and increase runoff in the same valley. Moving earth or rock points to a landslide. A rapid high flow in the channel points to a flash flood. A description can correctly identify both events. USGS, landslide hazards · India Meteorological Department, forecasting procedures · Ministry of Home Affairs, GLOF risk mitigation · U.S. National Weather Service, flood types
For Indian earthquake zoning, check the standard named in the question. The IS 1893 (Part 1):2016 map uses zones II, III, IV and V, with V representing the highest mapped seismic hazard. Uttarakhand includes areas in zones IV and V. The Bureau of Indian Standards withdrew its 2025 revision on 3 March 2026, and the Ministry of Earth Sciences confirmed on 1 April that the 2016 map remains current. Regional seismic zoning is one input to assessing a specific site. BIS zoning withdrawal · Ministry of Earth Sciences, current standard · Ministry of Earth Sciences, state zoning
Classify the Action by Its Purpose
| Activity | Main purpose | School example |
|---|---|---|
| Mitigation | Reduce possible loss and damage | Strengthen a school building to reduce earthquake damage. |
| Preparedness | Develop the ability to act when a hazard threatens or occurs | Practise a drill and test how to reach families. |
| Response | Address urgent needs during or immediately after the event | Account for students following evacuation and arrange immediate assistance. |
| Recovery | Restore and improve services after the disruption | Resume instruction safely and rebuild damaged classrooms to reduce future risk. |
A preparedness drill tests a planned action before any emergency. Evacuation during an actual flood is response. Reconstruction is recovery even when its design also mitigates future damage. Identify the action and its immediate purpose when two phases overlap. UNDRR, risk reduction terminology
Distinguish India’s Authorities and Response Force
The Disaster Management Act, 2005, as amended, assigns functions across levels of government. The 2025 amendment came into force on 9 April 2025 and provides for notified urban disaster management authorities in eligible cities. In a question about the current law, distinguish a coordinating authority from the specialist force that responds to a major incident.
| Institution | Role to recognize |
|---|---|
| National Disaster Management Authority (NDMA) | National disaster management policy and guidelines. The Prime Minister is its chairperson. |
| State Disaster Management Authority (SDMA) | State-level policy, planning and coordination. In a state such as Uttarakhand, the Chief Minister is chairperson. |
| District Disaster Management Authority (DDMA) | District planning, coordination and implementation. Under the statutory framework the District Magistrate, Collector or Deputy Commissioner, as applicable, chairs it. |
| National Disaster Response Force (NDRF) | A force constituted for specialist response to a disaster or a threatening disaster situation. |
An official warning may apply to several districts, while a local plan specifies responsibilities at a particular school. The NDMA’s SACHET service disseminates official alerts. They complement district and school preparedness because alerts communicate a threat and local plans assign actions when it arises. Disaster Management Act, §§ 3, 6, 14, 18, 25, 30, 41A and 44 · 2025 amendment · Commencement notification · NDMA, SACHET
Before the rainy season, a school rehearses how to account for students after evacuation and tests its contact list. Which activity is it carrying out?
Recovery
Exposure mapping
Preparedness
Emergency response
Who chairs the National Disaster Management Authority under India’s Disaster Management Act?
The Chief Minister of the affected state
The Prime Minister of India
The District Magistrate of the affected district
The head of the National Disaster Response Force
After the Bureau of Indian Standards withdrew the revised seismic zones in March 2026, which map did the Ministry of Earth Sciences confirm was current?
IS 1893 (Part 1):2016
The withdrawn 2025 revision
District disaster management planning maps in place of a national seismic map
A single-zone national seismic map
Sections you finish are checked off in the contents.