8.3 Profit & Loss, Interest, Discounting, Speed-Distance & Averages

Key Takeaways

  • Profit and Loss percentages are mathematically grounded on Cost Price (CP), whereas trade discounts are calculated strictly on Marked Price (MP).

  • Dishonest dealer problems are resolved using the true weight formula: Gain %=(ErrorTrue Value−Error)×100%\text{Gain } \% = \left(\frac{\text{Error}}{\text{True Value} - \text{Error}}\right) \times 100\%.

  • Simple Interest accrues linearly on the principal (SI=PRT100SI = \frac{PRT}{100}), whereas Compound Interest compounds exponentially (A=P(1+R100)TA = P(1 + \frac{R}{100})^T); the 2-year difference equals D2=P(R100)2D_2 = P\left(\frac{R}{100}\right)^2.

  • Average speed over equal distances is the harmonic mean (2xyx+y\frac{2xy}{x+y}), never the arithmetic mean; train crossing times depend on whether the target has negligible length (pole) or physical length (platform: D=Ltrain+LplatformD = L_{\text{train}} + L_{\text{platform}}).

  • Work-rate problems utilize the reciprocal unitary method (1/A+1/B1/A + 1/B), while average replacement problems track the net change in total sum (New=Replaced±N×ΔAverage\text{New} = \text{Replaced} \pm N \times \Delta\text{Average}).

Last updated: October 2026

8.3 Profit & Loss, Interest, Discounting, Speed-Distance & Averages

Core Principle: Quantitative aptitude problems in commercial arithmetic and kinetics are governed by invariant conservation laws: total value conserved across transactions, total work conserved across contributors, and total distance conserved across journeys. Identifying the invariant baseline—whether Cost Price, Total Work, or Total Displacement—transforms multi-step word problems into clean, solvable algebraic equations.


1. Profit, Loss, and Commercial Discounting

Commercial arithmetic problems in CG SET Paper I revolve around the dynamic relationship between three monetary parameters:

  • Cost Price (CP): The net expenditure incurred by a merchant to purchase or manufacture a product.
  • Selling Price (SP): The actual transaction price at which the good is exchanged with the customer.
  • Marked Price (MP / List Price): The catalog price affixed to the item before any promotional concessions.

1.1 Invariant Rules of Profit, Loss, and Discount

Profit=SP−CP(when SP>CP)\text{Profit} = SP - CP \quad (\text{when } SP > CP) Loss=CP−SP(when CP>SP)\text{Loss} = CP - SP \quad (\text{when } CP > SP)

Profit %=(SP−CPCP)×100%=(ProfitCP)×100%\text{Profit } \% = \left(\frac{SP - CP}{CP}\right) \times 100\% = \left(\frac{\text{Profit}}{CP}\right) \times 100\% Loss %=(CP−SPCP)×100%=(LossCP)×100%\text{Loss } \% = \left(\frac{CP - SP}{CP}\right) \times 100\% = \left(\frac{\text{Loss}}{CP}\right) \times 100\%

Non-Negotiable Examination Rule: Profit percentage and Loss percentage are ALWAYS calculated upon the Cost Price (CP) unless an exam question explicitly instructs otherwise.

Direct Scale Multipliers for Rapid Calculation

Instead of multi-step unitary calculations, utilize scale multipliers:

  • SP=CP×(1+P%100)=CP×(100+P%100)SP = CP \times \left(1 + \frac{P\%}{100}\right) = CP \times \left(\frac{100 + P\%}{100}\right)
  • SP=CP×(1−L%100)=CP×(100−L%100)SP = CP \times \left(1 - \frac{L\%}{100}\right) = CP \times \left(\frac{100 - L\%}{100}\right)
  • CP=SP×100100+P%orCP=SP×100100−L%CP = \frac{SP \times 100}{100 + P\%} \quad \text{or} \quad CP = \frac{SP \times 100}{100 - L\%}

1.2 Discounting Mechanics and the CP-MP Bridge

Discount is a reduction conceded to the buyer. Discount is ALWAYS calculated upon the Marked Price (MP):

Discount=MP−SP\text{Discount} = MP - SP Discount %=(MP−SPMP)×100%  ⟹  SP=MP×(100−D%100)\text{Discount } \% = \left(\frac{MP - SP}{MP}\right) \times 100\% \implies SP = MP \times \left(\frac{100 - D\%}{100}\right)

The Unified CP-MP Master Equation

Because Selling Price (SPSP) bridges both transactions:

SP=CP×(100+P%100)=MP×(100−D%100)SP = CP \times \left(\frac{100 + P\%}{100}\right) = MP \times \left(\frac{100 - D\%}{100}\right)

MPCP=100+P%100−D%\frac{MP}{CP} = \frac{100 + P\%}{100 - D\%}

(If the merchant incurs a loss L%L\%, replace +P%+ P\% with −L%- L\%).

Successive Discounts

When a seller offers consecutive trade discounts of d1%d_1\% and d2%d_2\%:

Single Equivalent Discount=(d1+d2−d1⋅d2100)%\text{Single Equivalent Discount} = \left(d_1 + d_2 - \frac{d_1 \cdot d_2}{100}\right)\%

  • Demonstration: Two successive discounts of 20%20\% and 10%10\%: Equivalent Discount=20+10−200100=30−2=28%(NOT 30%!).\text{Equivalent Discount} = 20 + 10 - \frac{200}{100} = 30 - 2 = 28\% \quad (\text{NOT } 30\%!).

1.3 Dishonest Dealer & False Weights

A merchant claims to sell commodities at cost price (SP=CPSP = CP), but uses a false weight that registers WW grams while delivering only ww grams (w<Ww < W):

Gain %=(ErrorFalse Weight)×100%=(True Weight−False WeightFalse Weight)×100%\text{Gain } \% = \left(\frac{\text{Error}}{\text{False Weight}}\right) \times 100\% = \left(\frac{\text{True Weight} - \text{False Weight}}{\text{False Weight}}\right) \times 100\%

  • Demonstration: A dealer sells sugar at cost price but uses a 900-gram weight for 1 kilogram (1000 grams): Gain %=1000−900900×100%=100900×100%=19×100%=11.11%\text{Gain } \% = \frac{1000 - 900}{900} \times 100\% = \frac{100}{900} \times 100\% = \frac{1}{9} \times 100\% = 11.11\%

2. Simple Interest (SI) vs. Compound Interest (CI)

Interest is the rental fee paid for the use of borrowed capital (PP) over time (TT) at an agreed annual percentage rate (R%R\%).

2.1 Simple Interest (SI): The Linear Growth Model

Simple interest accrues strictly on the original principal throughout the entire duration. Interest generated in prior periods is never capitalized:

SI=P×R×T100SI = \frac{P \times R \times T}{100} Maturity Amount (A)=P+SI=P(1+R⋅T100)\text{Maturity Amount } (A) = P + SI = P \left(1 + \frac{R \cdot T}{100}\right)

The Linear Doubling and Tripling Rules

  • A sum doubles (A=2P  ⟹  SI=PA = 2P \implies SI = P) in: T=100RT = \frac{100}{R} years.
  • If a sum becomes nn times its original principal in TT years at simple interest: R=(n−1)×100TorT=(n−1)×100RR = \frac{(n - 1) \times 100}{T} \quad \text{or} \quad T = \frac{(n - 1) \times 100}{R}

2.2 Compound Interest (CI): The Exponential Growth Model

Under compound interest, accrued interest is added to the principal at the end of each conversion period. Subsequent interest is calculated on this expanding base:

A=P(1+R100)TA = P \left(1 + \frac{R}{100}\right)^T CI=A−P=P[(1+R100)T−1]CI = A - P = P \left[\left(1 + \frac{R}{100}\right)^T - 1\right]

Compounding Frequency Conversions

  • Compounded Semi-Annually (Half-Yearly): Rate becomes R2%\frac{R}{2}\%, conversion periods become 2T2T: A=P(1+R/2100)2TA = P \left(1 + \frac{R/2}{100}\right)^{2T}
  • Compounded Quarterly: Rate becomes R4%\frac{R}{4}\%, conversion periods become 4T4T: A=P(1+R/4100)4TA = P \left(1 + \frac{R/4}{100}\right)^{4T}

The Rule of 72

An investment compounded annually doubles in approximately 72R\frac{72}{R} years (e.g., at 8%8\% compound interest, doubling requires 728≈9\frac{72}{8} \approx 9 years).

2.3 Master Difference Formulas: CI vs. SI

Examination problems frequently specify the numerical difference (DD) between compound interest and simple interest on the same principal for identical periods:

  1. For 1 Year (Compounded Annually): D1=CI1−SI1=0D_1 = CI_1 - SI_1 = 0
  2. For 2 Years: D2=CI2−SI2=P(R100)2D_2 = CI_2 - SI_2 = P \left(\frac{R}{100}\right)^2
  3. For 3 Years: D3=CI3−SI3=P(R100)2(300+R100)D_3 = CI_3 - SI_3 = P \left(\frac{R}{100}\right)^2 \left(\frac{300 + R}{100}\right)

2.4 Present Worth, True Discount and Banker's Discount

The syllabus word "discounting" covers two ideas: the trade discount on a marked price (section 1.2) and financial discounting, which runs interest backwards to find what a future sum is worth today. Suppose a sum AA is due TT years from now and money earns simple interest at R%R\% a year.

  • Present Worth (PW): the sum that, invested today at R%R\% for TT years, grows to AA: PW=100×A100+RTPW = \frac{100 \times A}{100 + RT}
  • True Discount (TD): the difference between the amount due and its present worth. It equals the simple interest on the present worth: TD=A−PW=A×R×T100+RT=PW×R×T100TD = A - PW = \frac{A \times R \times T}{100 + RT} = \frac{PW \times R \times T}{100}
  • Banker's Discount (BD): a bank that buys (discounts) a bill before its due date deducts simple interest on the face value AA, not on the present worth: BD=A×R×T100BD = \frac{A \times R \times T}{100}
  • Banker's Gain (BG): the bank's extra gain over the true discount, which equals the simple interest on the true discount: BG=BD−TD=TD2PWBG = BD - TD = \frac{TD^2}{PW}
  • Compound discounting: with annual compounding at rate rr (as a decimal), the present value of AA due after nn years is PV=A(1+r)nPV = \frac{A}{(1 + r)^n}

Worked example: A bill of ₹1,100 is due in 1 year and money earns 10% simple interest a year.

PW=100×1,100100+10×1=110,000110=1,000PW = \frac{100 \times 1{,}100}{100 + 10 \times 1} = \frac{110{,}000}{110} = 1{,}000

So the true discount is ₹1,100 − ₹1,000 = ₹100. The banker's discount is 1,100×10×1100=110\frac{1{,}100 \times 10 \times 1}{100} = 110, that is ₹110. The banker's gain is ₹110 − ₹100 = ₹10, which matches TD2PW=10021,000=10\frac{TD^2}{PW} = \frac{100^2}{1{,}000} = 10.

Exam cue: banker's discount is always larger than true discount for the same bill, because it charges interest on the larger face value.


3. Time, Speed, and Distance (TSD) Mechanics

Motion problems model the relationship between spatial distance (DD), velocity (SS), and elapsed time (TT):

Distance=Speed×Time  ⟹  S=DT,T=DS\text{Distance} = \text{Speed} \times \text{Time} \implies S = \frac{D}{T}, \quad T = \frac{D}{S}

3.1 Unit Conversion Invariants

Mixing kilometer-per-hour and meter-per-second units is the most frequent calculation blunder in CG SET Paper I:

1 km/h=1,000 meters3,600 seconds=518 m/s1\text{ km/h} = \frac{1{,}000\text{ meters}}{3{,}600\text{ seconds}} = \frac{5}{18}\text{ m/s} 1 m/s=185 km/h1\text{ m/s} = \frac{18}{5}\text{ km/h}

  • To convert km/h\text{km/h} to m/s\text{m/s}: Multiply by 518\frac{5}{18} (e.g., 72 km/h×518=20 m/s72\text{ km/h} \times \frac{5}{18} = 20\text{ m/s}).
  • To convert m/s\text{m/s} to km/h\text{km/h}: Multiply by 185\frac{18}{5} (e.g., 25 m/s×185=90 km/h25\text{ m/s} \times \frac{18}{5} = 90\text{ km/h}).

3.2 Average Speed Formulations

Average speed is never the simple arithmetic mean of speeds across different legs:

Average Speed=Total Distance TraveledTotal Time Taken\text{Average Speed} = \frac{\text{Total Distance Traveled}}{\text{Total Time Taken}}

  • Case 1: Equal Distances (The Harmonic Mean): If a traveler covers distance DD at speed xx and returns the same distance DD at speed yy: Average Speed=2xyx+y\text{Average Speed} = \frac{2xy}{x + y}
  • Case 2: Equal Time Intervals (The Arithmetic Mean): If a vehicle travels for duration tt at speed xx and subsequent duration tt at speed yy: Average Speed=x+y2\text{Average Speed} = \frac{x + y}{2}

3.3 Relative Speed Dynamics

When two physical bodies move simultaneously:

  • Moving in Opposite Directions (Towards or Away): Their velocities combine to close or open the distance faster: Srelative=S1+S2S_{\text{relative}} = S_1 + S_2
  • Moving in the Same Direction: The faster body gains upon the slower body at their net velocity difference: Srelative=∣S1−S2∣S_{\text{relative}} = |S_1 - S_2|

3.4 Train Crossing Mechanics

  1. Train Crossing a Point Object of Negligible Length (Pole, Tree, Person): Distance Covered=Ltrain,Time=LtrainStrain\text{Distance Covered} = L_{\text{train}}, \quad \text{Time} = \frac{L_{\text{train}}}{S_{\text{train}}}
  2. Train Crossing an Object of Extended Physical Length (Platform, Bridge, Tunnel): Distance Covered=Ltrain+Lplatform,Time=Ltrain+LplatformStrain\text{Distance Covered} = L_{\text{train}} + L_{\text{platform}}, \quad \text{Time} = \frac{L_{\text{train}} + L_{\text{platform}}}{S_{\text{train}}}
  3. Two Trains Crossing Each Other: Total Distance=L1+L2\text{Total Distance} = L_1 + L_2 Time (Opposite Directions)=L1+L2S1+S2,Time (Same Direction)=L1+L2∣S1−S2∣\text{Time (Opposite Directions)} = \frac{L_1 + L_2}{S_1 + S_2}, \quad \text{Time (Same Direction)} = \frac{L_1 + L_2}{|S_1 - S_2|}

3.5 Boats and Streams (River Kinetics)

Let speed of the boat in still water be uu and speed of the water current/stream be vv:

  • Downstream Speed (with the stream): D=u+vD = u + v
  • Upstream Speed (against the stream): U=u−vU = u - v
  • Derived speeds: u=D+U2,v=D−U2u = \frac{D + U}{2}, \quad v = \frac{D - U}{2}

4. Time and Work & Pipes and Cisterns

4.1 The Reciprocal Work-Rate Framework

Time and work problems are grounded in reciprocal rates. If an individual can complete a task in dd days, their 1-day work rate is 1d\frac{1}{d} of the total task:

Work Done=Rate×Time  ⟹  Total Work=1\text{Work Done} = \text{Rate} \times \text{Time} \implies \text{Total Work} = 1

  • Combined Work of A and B: If person A takes AA days and person B takes BB days: Combined 1-day Rate=1A+1B=A+BA⋅B\text{Combined 1-day Rate} = \frac{1}{A} + \frac{1}{B} = \frac{A + B}{A \cdot B} Total Time Taken Together=A⋅BA+B days\text{Total Time Taken Together} = \frac{A \cdot B}{A + B}\text{ days}
  • Three Contributors (A, B, C): Total Time=A⋅B⋅CAB+BC+CA days\text{Total Time} = \frac{A \cdot B \cdot C}{AB + BC + CA}\text{ days}

The Work Equivalence Equation

When varying teams of workers (MM) work for days (DD) and daily hours (HH) to produce work output (WW):

M1⋅D1⋅H1W1=M2⋅D2⋅H2W2\frac{M_1 \cdot D_1 \cdot H_1}{W_1} = \frac{M_2 \cdot D_2 \cdot H_2}{W_2}

4.2 Pipes and Cisterns

Pipes and cisterns problems operate identically to time and work, with the addition of negative rates:

  • Inlet Pipe (Fills the tank): Positive work rate =+1A= +\frac{1}{A} per hour.
  • Outlet Pipe / Leak (Empties the tank): Negative work rate =−1B= -\frac{1}{B} per hour.
  • Net Filling Rate: Net Rate=1A−1B=B−AAB  ⟹  Time to Fill Tank=ABB−A\text{Net Rate} = \frac{1}{A} - \frac{1}{B} = \frac{B - A}{AB} \implies \text{Time to Fill Tank} = \frac{AB}{B - A}

5. Averages and Arithmetic Means

The average (arithmetic mean) represents the balanced central measure of a distribution of numerical observations:

Average (xˉ)=Sum of All ObservationsNumber of Observations=∑xiN\text{Average } (\bar{x}) = \frac{\text{Sum of All Observations}}{\text{Number of Observations}} = \frac{\sum x_i}{N} Total Sum=N×xˉ\text{Total Sum} = N \times \bar{x}

5.1 Weighted Average

When groups with varying sizes (n1,n2,…n_1, n_2, \dots) have distinct averages (A1,A2,…A_1, A_2, \dots):

xˉw=n1A1+n2A2+⋯+nkAkn1+n2+⋯+nk\bar{x}_w = \frac{n_1 A_1 + n_2 A_2 + \dots + n_k A_k}{n_1 + n_2 + \dots + n_k}

5.2 Arithmetic Properties of Sequences

  • Average of the first nn natural numbers (1,2,…,n1, 2, \dots, n): n+12\frac{n + 1}{2}
  • Average of the first nn even natural numbers (2,4,…,2n2, 4, \dots, 2n): n+1n + 1
  • Average of the first nn odd natural numbers (1,3,…,2n−11, 3, \dots, 2n - 1): nn
  • Average of any Arithmetic Progression: First Term+Last Term2\frac{\text{First Term} + \text{Last Term}}{2}

5.3 The Replacement Theorem

When a group of NN items undergoes a replacement where an old item of value WoldW_{\text{old}} is substituted by a new item WnewW_{\text{new}}, altering the group's average by Δxˉ\Delta\bar{x}:

Wnew=Wold±(N×Δxˉ)W_{\text{new}} = W_{\text{old}} \pm (N \times \Delta\bar{x})

  • Demonstration: A research committee of 10 scholars has an average age. When a 50-year-old professor retires and is replaced by a younger researcher, the committee's average age decreases by 2 years (N=10,Δxˉ=−2N = 10, \Delta\bar{x} = -2): Wnew=50−(10×2)=50−20=30 years.W_{\text{new}} = 50 - (10 \times 2) = 50 - 20 = 30\text{ years}.

6. Comprehensive Formula Reference Table for Chapter 8

Mathematical DomainFundamental FormulaOperational Context & Application
Profit PercentageProfit %=SP−CPCP×100\text{Profit } \% = \frac{SP - CP}{CP} \times 100Always based upon Cost Price (CP).
Discount PercentageDiscount %=MP−SPMP×100\text{Discount } \% = \frac{MP - SP}{MP} \times 100Always based upon Marked Price (MP).
Unified CP-MP RatioMPCP=100+P%100−D%\frac{MP}{CP} = \frac{100 + P\%}{100 - D\%}Links markup and trade discount directly.
Dishonest Weight GainGain %=ErrorFalse Weight×100\text{Gain } \% = \frac{\text{Error}}{\text{False Weight}} \times 100Evaluates cheating via under-weight scales.
Simple InterestSI=P⋅R⋅T100SI = \frac{P \cdot R \cdot T}{100}Linear interest on initial principal only.
Compound InterestA=P(1+R100)TA = P\left(1 + \frac{R}{100}\right)^TExponential compounding on rolling balance.
CI - SI Difference (2 Yrs)D2=P(R100)2D_2 = P \left(\frac{R}{100}\right)^2Difference between CI and SI for exactly 2 years.
CI - SI Difference (3 Yrs)D3=P(R100)2(300+R100)D_3 = P \left(\frac{R}{100}\right)^2 \left(\frac{300 + R}{100}\right)Difference between CI and SI for exactly 3 years.
Unit Velocity Conversion1 km/h=518 m/s1\text{ km/h} = \frac{5}{18}\text{ m/s}Converts metric road speeds to SI physics units.
Average Speed (Equal Dist.)Savg=2xyx+yS_{\text{avg}} = \frac{2xy}{x + y}Harmonic mean over identical round-trip distance.
Relative Speed (Opposite)Srel=S1+S2S_{\text{rel}} = S_1 + S_2Bodies moving towards or away from each other.
Relative Speed (Same Dir.)Srel=∣S1−S2∣S_{\text{rel}} = \lvert S_1 - S_2 \rvertFaster body overtaking slower body.
Train Crossing PlatformTime=Ltrain+LplatStrain\text{Time} = \frac{L_{\text{train}} + L_{\text{plat}}}{S_{\text{train}}}Platform length must be added to train length.
Work Together RateTime=A⋅BA+B\text{Time} = \frac{A \cdot B}{A + B}Days to complete task when A and B cooperate.
Replacement TheoremWnew=Wold±NΔxˉW_{\text{new}} = W_{\text{old}} \pm N \Delta\bar{x}Calculates value of incoming substituted item.

7. Exam Traps & Common Calculation Blunders

  • Trap 1: Calculating Profit/Loss upon Selling Price: A question states "a vendor earns 20% profit on selling price". If SP=100SP = 100, then Profit =20= 20, which implies CP=80CP = 80. The actual true profit percentage is 2080×100%=25%\frac{20}{80} \times 100\% = 25\%. Never confuse profit on SP with profit on CP.
  • Trap 2: Arithmetic Averaging of Speeds across Equal Distances: If a car travels to a city at 60 km/h and returns at 40 km/h, the average speed is not 50 km/h. It is the harmonic mean: 2×60×4060+40=4800100=48 km/h\frac{2 \times 60 \times 40}{60 + 40} = \frac{4800}{100} = 48\text{ km/h}.
  • Trap 3: Omitting Platform Length in Train Problems: When a train crosses a bridge or platform, the total distance traveled is Ltrain+LplatformL_{\text{train}} + L_{\text{platform}}. Forgetting to add the train's own length produces an erroneous, truncated answer.
  • Trap 4: Forgetting Compounding Conversion Periods: In semi-annual compound interest problems, candidates frequently halve the interest rate (R/2R/2) but forget to double the time periods (2T2T), leading to gross compounding errors.
Loading diagram...
Commercial Pricing Dynamics: Cost Price, Marked Price, Selling Price & Profit Margins
Test Your Knowledge

A dishonest vendor claims to sell laboratory reference manuals at cost price, but utilizes a defective weighing mechanism that measures only 800 grams for every 1,000 grams (1 kilogram) invoiced. What is the vendor's actual profit percentage derived from this transaction?

A

16.67%

B

20.0%

C

22.5%

D

25.0%

Test Your Knowledge

The numerical difference between compound interest (compounded annually) and simple interest on an institutional research endowment principal for a period of 2 years at an annual interest rate of 8% is exactly ₹192. What is the principal value of this endowment?

A

₹30,000

B

₹24,000

C

₹32,000

D

₹36,000

Test Your Knowledge

A 180-meter-long express train traveling at a uniform velocity of 72 km/h completely traverses a railway station platform in 24 seconds. What is the physical length of the platform?

A

240 meters

B

280 meters

C

300 meters

D

320 meters

Test Your Knowledge

A bill of ₹2,600 is due in 2 years. If money earns 15% simple interest a year, what is the banker's gain on the bill?

A

₹600

B

₹780

C

₹2,000

D

₹180

Sections you finish are checked off in the contents.