6.4 Curriculum Implementation, Strands, Indicators & TLM Approval
Key Takeaways
The primary subject documents use strands, sub-strands, content standards, indicators and exemplars. A scheme and lesson plan connect those elements to the work pupils will do.
Basic 5 Mathematics indicator B5.3.2.1.2 covers calculating perimeter. Its code specifies grade, strand, sub-strand, content standard and indicator.
Adapt examples and supports to local learners while preserving the applicable standard. Regulation 8 of L.I. 2524 requires prior written approval for a school-based curriculum within the regulation’s scope.
Check the instructional timetable, scheme, lesson and learner work together to see whether the intended curriculum is being taught and assessed.
NaCCA approves materials within its remit under Act 1023. Verify the specific title and level using the Council’s register and QR process under the 2026 framework.
When observing a lesson, start with the curriculum indicator, then compare the activity and pupils’ work. When checking a proposed book purchase, start with the approval status of the exact title and level. These checks answer different questions about curriculum delivery.
Reading a NaCCA Primary Curriculum Document
The primary subject curricula use a series of linked elements:
- Strand: A broad area within the subject, such as Geometry and Measurement in Mathematics.
- Sub-strand: A narrower theme, such as Measurement within that strand.
- Content standard: A statement of the broader learning expected in that grade and area.
- Learning indicator: A specific performance pupils can demonstrate to show progress toward the standard.
- Exemplar: An example of a task or experience teachers can use to develop or assess the indicator.
Decode a Real Indicator
In NaCCA’s Upper Primary Mathematics curriculum, B5.3.2.1 is the content standard on estimating and measuring perimeter and surface area of two-dimensional shapes. The indicator B5.3.2.1.2 addresses calculating perimeter in centimetres and metres.
| Code segment | Meaning | Example |
|---|---|---|
B5 | Basic year | Basic 5 |
.3 | Strand | Geometry and Measurement |
.2 | Sub-strand | Measurement |
.1 | Content standard | First standard in this sub-strand at this grade |
.2 | Learning indicator | Second indicator for this content standard |
Check the subject name as well as the code. Another Basic 5 subject may use the same numbering pattern for different content. If the teacher gives pupils a paper figure, ask them to trace the boundary, note the lengths and explain the total. Comparing a learner’s work to the intended performance is more informative than checking the reference alone.
Curriculum Fidelity and Local Adaptation
Fidelity describes how closely implementation follows the intended design. Some elements, such as the skill expressed by an official indicator, anchor what the lesson must achieve. Teachers can adapt examples, language support and materials. A Basic 5 class can calculate the perimeter of a rectangle on a page or model a rectangular garden with string. Either lesson should show how pupils use a consistent unit and calculate the length around the boundary.
Curriculum implementation research uses mutual adaptation to describe how a programme and its local setting can change in response to each other. In a classroom, preserve the national learning expectations when choosing a locally meaningful example. Replacing Mathematics reasoning with copying examination answers changes what pupils practise. McLaughlin on mutual adaptation
Check the Evidence in Sequence
- Timetable: Check that the scheduled subjects receive instructional time at the school level in question.
- Scheme of learning: Identify the standards and indicators each block of lessons will cover, and check the sequence and pacing.
- Lesson plan and pupil work: Look for observable performances and follow-up when the evidence shows a gap. In the perimeter example, a pupil who counts the interior squares may be using an area strategy. Ask them to trace the boundary and recalculate.
A local lesson example within an approved curriculum is different from adopting a school-based curriculum. For the latter, including a foreign-based curriculum within scope, regulation 8 of L.I. 2524 requires prior written approval from NaCCA. NaCCA regulations
Approval of Teaching and Learning Materials
Act 1023 sections 103 and 104(1)(b)(iii) set out NaCCA’s pre-tertiary remit and materials-approval function. The statutory object excludes technical and vocational education and training institutions. For public and private institutions within its scope, the 2026 NaCCA Regulations (L.I. 2524) set out approval procedures. The Gazette states that the regulations entered into force on 28 July 2026. Act 1023 · NaCCA regulations and Gazette text
- Publisher: Under regulations 13 and 16, meet the Council’s applicable quality-assurance criteria and guidelines. Submit the application in the required form, with requested information and the prescribed fee. NaCCA assesses materials against its standards. Approval concerns the proposed material.
- Quality standards mark: Under regulation 15, the mark includes a Council-generated Quick Response (QR) code and an International Standard Book Number issued by the Ghana Library Authority. The publisher applies in writing for approval to use the mark and pays the prescribed fee. The Council’s Approved Books Registry explains how to verify approval using the QR code.
- School: Check the exact title, publisher, level and approval status through the official register. For example, approval for a Primary 3 reader does not establish that a similar-looking Primary 4 edition is approved. If a QR result does not match the book, verify it with NaCCA before selecting it.
Stewardship After Approval
Enter approved books received into an inventory, including title, quantity, condition and date. Distribute copies where pupils can use them and record loans or recoveries as needed. Compare remaining stock with learner numbers to identify shortages. The same school can use safe teacher-made aids such as string for measurement while checking the approval of published materials acquired for classroom use.
In the Basic 5 Mathematics indicator B5.3.2.1.2, what does the digit 3 immediately after B5 identify?
The Content Standard number
The Sub-strand number
The Learning Indicator number
The Strand number
A supplier offers new Primary 4 readers carrying an ISBN and says a similar title was approved last year. What should the school do before selecting these books?
Accept the ISBN alone as proof of curricular approval.
Verify the title, publisher, grade and approval status through NaCCA’s register or QR system.
Treat approval of a comparable edition as approval of the current title.
Ask the PTA to issue a substitute approval.
A Basic 5 teacher has pupils use string to model a rectangular garden. They measure the sides and calculate the required perimeter. What does this illustrate?
Abandoning the prescribed indicator
Leaving measurement untaught
Adapting a local classroom activity while preserving the learning indicator
End-of-programme evaluation
During a support visit, a school leader finds 200 approved Primary 3 readers in storage while pupils share worn photocopies. What is the best response?
Record the books in the TLM Inventory Register and distribute them promptly to classrooms with recovery tracking
Keep the books locked away until NaSIA schedules a formal school closure hearing
Allow the headteacher to sell the surplus readers to parents to generate internally generated funds
Instruct teachers to replace the approved readers with unvetted commercial pamphlets
Sections you finish are checked off in the contents.