1.3 Eligibility, Experience Paths & Financial Responsibility
Key Takeaways
- F.S. 489.111: an applicant for certification must be 18, of good moral character, and meet one statutory experience/education path; one year equals 2,000 person-hours.
- CILB 6-G (July 2024) methods: construction-related baccalaureate + 1 year; 1 year foreman + 3 years college credit; 1 worker + 1 foreman + 2 college; 2 worker + 1 foreman + 1 college; 4 years with at least 1 year as foreman; or upgrade from active Class B ≥1 year or Class C ≥4 years.
- Class A experience on CILB 6-G should include one year on systems in excess of 25 tons cooling and 500,000 BTU heating.
- 61G4-15.006 (effective 5/5/2024): no unsatisfied judgments or liens (applicant and the business entity); FICO-derived score 660 or higher; below 660, complete a Board-approved 14-hour financial responsibility course.
- 61G4-15.003: air-conditioning contractors must carry $100,000 public liability and $25,000 property damage, with the certificate holder listed as the State of Florida, Department of Business and Professional Regulation, Construction Industry Licensing Board.
Eligibility is a statute-and-form problem, not an exam-score problem
Quick Answer: F.S. 489.111 requires age 18, good moral character, and one listed experience/education method. CILB 6-G (July 2024, Class A qualifying a business; Class B uses the matching 6-H/5-H set) is how you prove it. 61G4-15.006 (effective 5/5/2024) is the credit-report and 660 FICO-derived rule. 61G4-15.003 is $100,000 public liability / $25,000 property damage with State of Florida, DBPR, CILB as certificate holder. Passing PTI/Pearson VUE does not skip those gates.
DBPR's examination checklist is blunt: passing the examination allows you to apply for certified licensure; a passing grade alone does not qualify you. People do sit the exams while they finish a foreman year — that is a personal timing choice, not a waiver. Confirm current application forms (5-G individual, 6-G qualifying a business, and the Class B H-series counterparts) on MyFloridaLicense; 61-35.010 incorporates those forms.
Experience methods on CILB 6-G (July 2024)
Check one box. The form states that a construction-related degree means a baccalaureate from an accredited four-year college in engineering, architecture, or building construction, and that one year of experience equals 2,000 hours. Class A applicants should be able to show one year on systems in excess of 25 tons of cooling and 500,000 BTU heating — that is the capacity that Class B cannot contract, and 6-G's employment-history checkboxes ask for it.
| Method | What 6-G requires |
|---|---|
| 1. Degree + experience | Four-year construction-related baccalaureate (counts as three years) plus one year proven experience in the category |
| 2. Foreman + college | 1 year foreman and not less than 3 years of accredited college-level credits |
| 3. Worker + foreman + college | 1 year worker, 1 year foreman, and 2 years college-level credits |
| 4. Worker + foreman + college | 2 years worker, 1 year foreman, and 1 year college-level credits |
| 5. Time in the trade | 4 years as worker or foreman, of which at least 1 year must have been as a foreman |
| 6. Upgrade | Active Class B in the classification for a minimum of 1 year, or active Class C for a minimum of 4 years (provide the license number; employment-history section is exempted on the form) |
Those six boxes track F.S. 489.111(2)(c). The statute also states junior/community-college courses count as accredited college-level courses, and it spells out HVAC upgrades in 489.111(2)(c)5: active certified Class C → Class B after 3 years in classification and the Class B exam; Class C → Class A after 4 years and the Class A exam; Class B → Class A after 1 year and the Class A exam. Method 6 on 6-G is the Class A upgrade line (B ≥1 year or C ≥4 years). Do not invent a “90-day Class B upgrade.”
A foreman on this form is not a courtesy title on a business card. The statute describes a foreman as in charge of a group of workers and usually responsible to a superintendent or contractor. A lead technician who directed helpers, assigned tasks, and was the job-site decision maker can document that year; a helper who never ran a crew cannot relabel three helper years as foreman time. List employer name and address, dates, phone, employer's license number, a contact, and the work (air-conditioning equipment, heating, refrigeration, sheet metal ductwork, and — for Class A — systems over 25 tons / 500,000 BTU).
Financial responsibility and financial stability (61G4-15.006, effective 5/5/2024)
The rule splits two grounds for refusal.
Financial responsibility: you must provide a current consumer credit report (as defined in 61G4-12.011) that does not disclose any unsatisfied judgments or liens against you. There must also be no unsatisfied judgments or liens against the business entity you previously qualified as primary qualifier or that you have applied to qualify. Satisfied items that still print on the report need proof of satisfaction, and bankruptcies need discharge proof, as the 6-G instructions describe.
Financial stability: proof of a credit score, FICO derived, of 660 or higher. Applicants who cannot provide 660 or higher meet stability by completing a 14-hour financial responsibility course approved by the Board.
Both responsibility and stability can be met with one clean current credit report that has a FICO-derived 660 or higher and no unsatisfied judgments or liens (again including the business entity). A 680 score with an open $8,000 materialman's judgment is not a pass — the judgment kills responsibility even though 680 clears the stability number. A 640 score with a clean report still needs the 14-hour course for stability. The old “660 bond” alternative is not the current (5/5/2024) rule; do not study a letter-of-credit workaround as if it still substitutes for the course.
Insurance (61G4-15.003) and workers' compensation
As a prerequisite to initial issuance, renewal of an active certificate, or a status change, the applicant attests to public liability and property damage insurance in the Board's amounts, maintained for the life of an active certificate. For Air Conditioning contractors the table is $100,000 public liability and $25,000 property damage. That is the same floor as mechanical, roofing, plumbing, and most other Division II trades. It is not the General/Building contractor floor of $300,000 / $50,000.
The certificate holder on the Certificate of Insurance must be the State of Florida, Department of Business and Professional Regulation, the Construction Industry Licensing Board. The COI must show the issuing date, agent, exact business-organization name (and d/b/a), insurer, policy number, effective date, expiration date, and those aggregate amounts. Naming only a municipality, or only “DBPR” without CILB, is how a file stalls.
Workers' compensation follows Chapter 440, Florida Statutes, or a valid exemption. Construction employers with employees generally must carry coverage; officer exemptions are a Division of Workers' Compensation process, not a CILB waiver of job-site reality. Commercial contracts often demand $1 million liability — that is a contract minimum, not the license minimum. The exam tests the Board numbers.
| Gate | Current official bar |
|---|---|
| Age / character | 18; good moral character (F.S. 489.111) |
| Experience | One 6-G / 489.111 method; 2,000 hours = 1 year; Class A should show >25 tons / 500,000 BTU for one year |
| Credit — responsibility | No unsatisfied judgments or liens (person and entity) |
| Credit — stability | FICO-derived 660+, or Board-approved 14-hour course if below 660 |
| Liability insurance | $100,000 public liability / $25,000 property damage; holder State of Florida, DBPR, CILB |
| Workers' compensation | Chapter 440 or valid exemption |
| Exams | Both Division II sittings at 70%, fees confirmed at PTI/Pearson VUE registration |
After the exams, the license application still needs electronic fingerprints (FDLE/FBI), the experience affidavits, and the insurance/credit package. Certified licenses renew August 31 of even-numbered years with 14 hours of Board-approved continuing education per biennium (at least one hour each of workplace safety, workers' compensation, business practices, advanced-module building code, and laws and rules) under F.S. 489.115 and 61G4-18.001 — you will study that block later; do not skip CE planning once the certificate issues.
Florida scenario: Miami-Dade lead installer, 640 FICO, four documented years
Andre has been a mechanic in Miami-Dade for three years and a foreman for one year directing two helpers on changeouts and light commercial splits. He wants certified Class B first. Method 5 on CILB 6-G fits: four years as worker or foreman with at least one year as foreman, and 2,000 hours per year. His credit report shows a FICO-derived 640 and no unsatisfied judgments or liens. 61G4-15.006(1) responsibility is met. 61G4-15.006(2) stability is not: 640 is below 660, so he must complete the Board-approved 14-hour financial responsibility course. He cannot “bond around” the score under the 5/5/2024 rule. He also needs a COI with $100,000 / $25,000 and State of Florida, DBPR, CILB as holder — not a homeowner policy and not a COI that names only the City of Miami. If he later upgrades to Class A, Method 6 requires an active Class B for at least one year plus the Class A trade exam, and the Class A employment checkboxes will look for one year on systems over 25 tons / 500,000 BTU.
Traps: (1) Counting helper years as foreman years. (2) Treating 659 as “close enough” to 660 — it is not; take the 14-hour course. (3) Ignoring an unsatisfied lien because the FICO number is high. (4) Using GC insurance limits or omitting CILB from the certificate holder. (5) Assuming the Pearson VUE printout is the license.
An applicant's consumer credit report shows no unsatisfied judgments or liens but a FICO-derived score of 640. Under 61G4-15.006 (effective 5/5/2024), how does the applicant meet the Board's financial stability requirement?
What public liability and property damage amounts does 61G4-15.003 require for an air-conditioning contractor, and who must be the certificate holder?
On DBPR CILB 6-G (July 2024), which experience method qualifies an applicant who has no college credits and is not upgrading from Class B or Class C?