Legal Descriptions and Metes-and-Bounds Surveys
Key Takeaways
Distinguish the point of commencement from the point of beginning.
Closure checks whether the boundary returns to its beginning.
An appraisal sketch does not replace a boundary survey.
Legal Descriptions and Metes-and-Bounds Surveys
Every real property appraisal begins with the unambiguous identification of the subject real estate. Real estate is fixed in location, indestructible, and legally distinct. To value real property, appraisers must know precisely what physical parcel of land is being appraised, where its boundaries lie, and what property rights attach to it.
The Legal Role of Real Property Descriptions
A critical distinction in professional appraisal practice exists between an informal street address and a formal legal description:
- Informal Street Address: A postal designation (e.g., 742 Evergreen Terrace) created primarily for mail delivery, emergency services routing, and municipal convenience. Street addresses are subject to change by local governing bodies, do not define property boundaries, and cannot establish the exact physical perimeter of the estate.
- Legal Description: A legally recognized written statement that identifies a specific, unique parcel of real property to the total exclusion of all other land on Earth. A legally sufficient description enables a licensed surveyor to locate the physical property boundaries on the ground without relying on outside oral evidence.
Important
Under the common-law Statute of Frauds, all contracts for the conveyance, sale, or long-term leasing of real property must be in writing and contain an adequate legal description. In residential appraisal reporting (such as Fannie Mae Form 1004 / Freddie Mac Form 70), the appraiser must identify both the municipal address and the complete legal description recorded in official public land records.
In American real estate and appraisal practice, three primary survey methods generate legal descriptions:
- Metes and Bounds System
- Government Rectangular Survey System (Public Land Survey System - PLSS)
- Lot and Block System (Recorded Subdivision Plat)
1. Metes and Bounds Survey System
The Metes and Bounds system is the oldest method of land surveying in the United States. Derived from English common law, it was the primary system used in the original Thirteen Colonies, along with Maine, Vermont, Kentucky, Tennessee, West Virginia, and Texas. It remains widely used across the nation today to describe irregularly shaped tracts, rural acreage, and unplatted parcels.
Core Mechanics: Metes, Bounds, and Calls
- Metes: Measures of linear distance (e.g., feet, chains, rods; historically and ). Modern practice uses decimal feet.
- Bounds: Directions or terminal boundaries establishing compass bearings and adjoining natural or artificial monuments.
- Calls: The individual, sequential boundary statements that define each leg of the perimeter. A complete metes and bounds description consists of an ordered series of calls running clockwise or counterclockwise around the property.
Point of Beginning (POB)
Every metes and bounds description must begin at a clearly identified, permanent, and fixed location known as the Point of Beginning (POB). If the description starts at an established government survey marker or street intersection that is not on the property boundary itself, it will include an initial commencing call that travels from that benchmark to the true POB:
"Commencing at an iron pin found at the monumented center line intersection of State Route 12 and Miller Road; thence North East along the centerline of Miller Road a distance of 450.00 feet to the true POINT OF BEGINNING..."
Once the POB is established, the survey proceeds through a series of boundary calls before returning to the POB.
Compass Bearings and Angles
Metes and bounds calls express direction using quadrant bearings. A circle of is divided into four quadrants: Northeast (NE), Southeast (SE), Southwest (SW), and Northwest (NW). Bearings are measured starting from the stated north-south bearing basis, which may be true, grid, magnetic, or an assumed survey basis, swinging toward either East or West:
- Each degree () contains 60 minutes ().
- Each minute () contains 60 seconds ().
- A bearing can never exceed .
| Bearing Call | Interpretation |
|---|---|
| Due North | |
| Exactly halfway between North and East (Northeast) | |
| 14 minutes and 30 seconds south of due East | |
| 12 degrees and 15 minutes west of due South | |
| Due West |
Monuments and the Hierarchy of Boundary Calls
Monuments are fixed physical markers used by surveyors to establish boundary corners:
- Natural Monuments: Rivers, streams, trees, ledges, or crests of ridges. Natural monuments are subject to avulsion, erosion, disease, and shifting.
- Artificial Monuments: Concrete posts, iron pipes, surveyor pins with registered plastic caps, brass discs set in bedrock, or stone markers.
When legal descriptions contain conflicting or ambiguous terms, survey retracement often uses a Hierarchy of Calls, subject to the deed, original survey evidence, and jurisdictional law:
- Natural monuments take precedence over all other evidence.
- Artificial monuments take precedence over courses and distances.
- Bearings (directions) take precedence over linear distances.
- Linear distances take precedence over stated acreage.
- Stated acreage is considered the least reliable element and serves merely as descriptive metadata rather than a boundary-defining metric.
Mathematical Closure
The foundational legal requirement of any metes and bounds description is closure. The final boundary call must return precisely to the Point of Beginning:
"...thence South West a distance of 250.00 feet to the POINT OF BEGINNING, containing 2.450 acres of land, more or less."
If the final call fails to meet the POB, the description suffers from a lack of closure, creating an open polygon. Failure to close is a discrepancy requiring investigation. It does not by itself determine whether a conveyance is void; a surveyor or title professional must evaluate the controlling evidence and appropriate correction.
A legal description begins: "Beginning at an iron pin at the intersection of Oak Lane and Route 4, thence North 45° East 300 feet, thence South 45° East 200 feet, thence South 45° West 300 feet, thence North 45° West 200 feet to the point of beginning." Which survey system does this represent, and what critical legal condition is satisfied?
Metes and bounds; closure is achieved because the boundary calls return precisely to the point of beginning
Lot and block; subdivision plat approval is achieved through surveyor certification
Public Land Survey System; aliquot subdivision is achieved through quarter-section calls
Geodetic survey; monumentation is achieved through state plane coordinates
Sections you finish are checked off in the contents.