17.3 Documenting Site Features: Survey, Civil, Grading, Utilities & Landscape

Key Takeaways

  • The survey establishes boundary, easements, existing topography, existing utilities, and the benchmark and vertical datum that every other site drawing must reference.
  • Under AIA B101 Article 5 the owner furnishes the survey and geotechnical report; the architect verifies that they cover the design.
  • The boundary between the architectural site plan and the civil drawings must be stated explicitly, or elements at that seam end up in neither contract.
  • Spot elevations govern wherever precision matters, including finish floor, door thresholds, top of curb, wall tops and bottoms, and every accessible route control point.
  • Accessible route running slope may not exceed 1:20 without becoming a ramp and cross slope may not exceed 1:48, so the drawings must carry enough spot elevations to prove it.
Last updated: September 2026

PDD objective 2.2 asks you to determine appropriate documentation of site features. Site documentation is produced by several disciplines at once, and the recurring failure is a gap or a contradiction between the architectural site plan and the civil drawings.

Who Documents What

Sheet seriesDisciplineTypical content
VSurveyExisting conditions, boundary, topography, easements, utilities, benchmarks
CCivilDemolition, grading and drainage, site utilities, erosion and sediment control, paving and striping, site details
LLandscapePlanting, irrigation, hardscape, site furnishings
A (site sheets)ArchitectureArchitectural site plan, building location and dimensions, accessible routes, site-related architectural elements
E (site sheets)ElectricalSite lighting, photometrics, power to site equipment

The boundary between the architectural site plan and the civil drawings must be stated explicitly in the documents. A common convention is that civil documents the site up to approximately 5 feet from the building and architecture documents everything inside that line, but the convention varies by firm and by project, and an unstated boundary is how a stoop, an area drain, or a bollard ends up in neither contract.

The Survey Is the Basis of Everything

Every site drawing is built on the survey, and the survey establishes:

  • Boundary and bearings, with recorded easements and rights-of-way.
  • Existing topography, usually at 1-foot or 2-foot contour intervals.
  • A benchmark and a vertical datum. Every spot elevation in the set must reference the same datum. Mixing an assumed site datum with a published geodetic datum produces a building set at the wrong elevation, and it is discovered during excavation.
  • Existing utilities, their size, material, and invert elevations.
  • Existing improvements, trees, and encroachments.

Under AIA B101 Article 5 the owner furnishes the survey and the geotechnical report. The architect verifies that what was furnished actually covers the design.

Grading and Drainage Documentation

Grading is documented with contours for general form and spot elevations for control points. Spot elevations govern wherever precision matters:

  • Finish floor elevation, and the elevation at each door threshold
  • Top of curb and gutter flow line
  • Top and bottom of walls and stairs
  • High points, low points, and the rim and invert of every drainage structure
  • Every point along an accessible route where slope must be verified

Two rules do most of the work. First, positive drainage away from the building: the ground should fall away from the structure for a minimum distance, and a paved surface generally needs at least a 1% slope to drain (2% for most grass areas). Second, accessible route slopes are documented, not assumed: an accessible route may not exceed 1:20 running slope without becoming a ramp, and cross slope may not exceed 1:48, so the drawings must carry enough spot elevations to prove compliance.

Utilities, Erosion Control & Site Details

  • Utility plans show routing, size, material, invert elevations, and the point of connection to each service, along with required separations between water and sewer.
  • Erosion and sediment control plans document silt fence, inlet protection, construction entrances, and stabilization measures required by the project's stormwater permit, and they are typically a prerequisite to any land disturbance.
  • Stormwater management documents detention or retention volume, outlet control structures, and any low-impact development measures such as bioretention or permeable paving.
  • Site details resolve paving sections, curbs, walls, fences, bollards, tree protection, and trench sections — the pieces that appear on every project and are most often copied forward without checking.

Coordinating the Site Documents

Coordination checkWhy it fails
Finish floor elevation matches on architectural, civil, and structuralEach discipline carries it independently and one is not updated
Building footprint and dimensions match civil and architecturalCivil works from an early background
Accessible route slopes verified end to endSlopes documented in pieces, never checked continuously
Utility entry points match the plumbing and electrical risersCivil sets an entry location the interior plan cannot accept
Site lighting does not conflict with landscape or utilitiesThree disciplines documenting the same ground plane
Datum consistent across every site sheetMixed assumed and geodetic datums

Exam Tip: When an item describes a conflict between drawings, ask which discipline owns the information. The survey owns existing conditions and datum, civil owns grading and site utilities, landscape owns planting and irrigation, and architecture owns the building and the accessible route from the property line to the entrance. The correct response is to resolve the conflict at the owning discipline, not to redraw it on the architectural sheet.

Test Your Knowledge

A project set shows a finish floor elevation of 412.50 on the architectural sheets and 41.50 on the civil grading plan. What is the most likely cause and the correct resolution?

A
B
C
D
Test Your Knowledge

Which discipline’s documents establish existing boundary lines, recorded easements, existing topography, and the benchmark for a project?

A
B
C
D